4 November 2002Paul Dauncey - Electronics1 UK Electronics Status Paul Dauncey Imperial College London.

Slides:



Advertisements
Similar presentations
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Advertisements

24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
28 February 2003Paul Dauncey - HCAL Readout1 HCAL Readout and DAQ using the ECAL Readout Boards Paul Dauncey Imperial College London, UK.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
4 November 2002Paul Dauncey - CALICE News1 News from CALICE Paul Dauncey Imperial College London.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
2 October 2003Paul Dauncey1 Paris Summary Part 2 and Status of UK Electronics/DAQ Paul Dauncey Imperial College London, UK.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
9 Sep 2005DAQ - Paul Dauncey1 DAQ/Online Status Paul Dauncey Imperial College London.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group: A. Baird, D. Bowerman,
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
10 th November 2004Daniel Bowerman1 Dan Bowerman Imperial College Calice Meeting - UCL 10 th November 2004 Electronics Status For the Imperial, Manchester,
2 April 2003Paul Dauncey - CALICE DAQ1 First Ideas For CALICE Beam Test DAQ Paul Dauncey Imperial College London, UK for IC, Manchester, RAL, UCL.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory14 September 2000LEB2000 Krakow The Front-End Driver Card for CMS Silicon Microstrip.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Instrumentation Department John Coughlan Rutherford Appleton Laboratory14 November 2002 CMS Tracker Readout Effort Requirements in Instrumentation Department.
18 Jan 2006DAQ - Paul Dauncey1 DAQ/Online: readiness for DESY and CERN beam tests Paul Dauncey Imperial College London.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
11 October 2002Matthew Warren - Trigger Board CDR1 Trigger Board CDR Matthew Warren University College London 11 October 2002.
Electronic System Design GroupInstrumentation DepartmentR. Halsall, S. Taghavirad et alRutherford Appleton Laboratory5 March 2003 Delay FPGA I/O Clock40.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
FED Overview VME-FPGA TTCrx BE-FPGA Event Builder Buffers FPGA Configuration Compact Flash Power DC-DC DAQ Interface 12 Front-End Modules x 8 Double-sided.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory28 March 2003 FED Project Plan 2003 FED Project aiming to satisfy 2 demands/timescales: Module.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Status of NA62 straw electronics Webs Covers Services Readout.
25 Feb 2005Paul Dauncey1 TB Review: DAQ Paul Dauncey Imperial College London For Imperial, RAL, UCL.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
16th July 2003Tracker WeekJohn Coughlan et. al.FED-UK Group Final FED Progress Report CMS Tracker Week 16th July 2003.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
6 Mar 2006DAQ - Paul Dauncey1 DAQ/Online: readiness for DESY and CERN beam tests Paul Dauncey Imperial College London Update of Orsay talk; concentrate.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
LCWS Apr 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For CALICE-UK electronics group: A. Baird, D. Bowerman, P. Dauncey,
24th October 2003 M. Noy, Imperial College London0 M. Noy FED Project Status.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
Electronic System Design GroupInstrumentation DepartmentRob HalsallRutherford Appleton Laboratory19 July 2002 Electronic System Design Group CMS Tracker.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting The Front-End Driver Card FEDv1 VME.
Notes on visit to Rome 28/04/2014 Christian Joram Szymon Kulis Samir Arfaoui.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Electronic System Design GroupInstrumentation DepartmentR. Halsall, S. Taghavirad et alRutherford Appleton Laboratory5 March 2003 CMS Tracker FED Firmware.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory18 July 2001 CMS Tracker FED CMS Tracker Two Weekly.
LECC2003: The 96 Chann FED Tester: Greg Iles30 September The 96 channel FED Tester Outline: (1) Background (2) Requirements of the FED Tester (3)
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
Current DCC Design LED Board
CMS EMU TRIGGER ELECTRONICS
CDR Project Summary and Issues
ATLAS: Level-1 Calorimeter Trigger
UK ECAL Hardware Status
ECAL electronics schedule
Trigger issues for the CALICE beam test
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

4 November 2002Paul Dauncey - Electronics1 UK Electronics Status Paul Dauncey Imperial College London

4 November 2002Paul Dauncey - Electronics2 Back end electronics for ECAL 30 layers, 18  18 pads/layer, total 9720 channels Each channel amplified at front end by VFE chip CR-RC shaper, peaking time ~180ns 18 channels/VFE chip, multiplexed analogue output Need to generate sample-and-hold at peak time Need to drive multiplex shift register Need to digitise with 14 bits range, 10 bits precision Need to send calibration voltage for pulse injection Need to run at ~100Hz sustained, ~1kHz peak rate Read out all channels every event for pedestal and noise studies For more details, see: Overview of requirements

4 November 2002Paul Dauncey - Electronics3 Original proposed system 15 readout boards Each handles digitisation of 2 layers 1 trigger board Holds off further triggers until readout complete 1 test board (not shown) For testing cable connections of readout board Readout board most complex part Each cable handled by slave FPGA Whole board controlled by master FPGA

4 November 2002Paul Dauncey - Electronics4 Conceptual Design Review, 11 Oct CDR was held on 11 Oct at RAL; four external reviewers Rob Halsall, Adam Baird (RAL), Greg Iles (IC), John Lane (UCL) Technically, design considered good: Overall concept thought sound and should be kept Minor issues and suggested improvements (see report) Cost estimate reasonable But schedule thought unrealistic: Loss of RAL ID effort since July impacted more than foreseen so schedule further behind than anticipated RAL drawing office for layout heavily booked (by LHC!) so unlikely to get effort when required N.B. extra three months to Mar 2004 already factored in at CDR

4 November 2002Paul Dauncey - Electronics5 How to get back on schedule? Rob Halsall and Adam Baird negotiated 1 month RAL ID effort for themselves to work with us up to PPRP approval; they propose Taking an existing design with similar architecture Only rework the parts which have to be different Save layout and engineering effort of rest of board They will help us evaluate feasibility and resources required Suggest start from CMS Tracker Front End Driver (FED) Will be used to read out CMS silicon tracker CMS needs ~500 FEDs in final system Already taken ~10 man-years of design effort (IC and RAL) First full-specification prototypes due in Dec 2002

4 November 2002Paul Dauncey - Electronics6 0V CMS Tracker FED Front End FPGA 12x Opto Rx PD Array 4x Prog Delay 1 Synch & Processing TTCrx VME QDR SSRAM 2 5V3.3V1.5V Dual ADC 3.3V Dual ADC 1 6 0V Front End FPGA 12x Opto Rx PD Array Synch & Processing 8 Dual ADC Dual ADC Readout & Synch Control ASIC FPGA Temp Sense Temp Sense 4x Prog Delay FPGA 1 3 4x Prog Delay FPGA 4x Prog Delay FPGA Temp Sense 3.3V 1.5V 5V -5V spare PD Boundary Scan System ACE E-Fuse Hot swap DC-DC Back End FPGA Temp Sense 12x trim dac Buffer Jumper Matrix Compact Flash VME64x Interface FPGA Test Connector SW Hot swap cycle Live extract request Config E2PRO M Vref DAQ TTS Spare 1.5V 3.3 V 5.0 V 2.5V -5.0V 2.5V Vref 1.5V Run/Halt VME Power Good LEDs extract Id E2 Prom FLT LEDs FSYNC Readout +12V LEDs +5V +3.3V FE 1 FE 8 EMU LEDs Process Transfer +2.5V LEDs +1.5V -5.0V halted LEDs Busy error TTC Over temp LEDs VME Clock Control Data Clock Control Data 8 3.3V1.5V

4 November 2002Paul Dauncey - Electronics7 FED board compared to readout board Master  BE +VME; very similar Slave  FE; need to rewrite firmware ADCs, etc; totally different

4 November 2002Paul Dauncey - Electronics8 Ideally, keep everything to the right, redo everything to the left Restricts readout board to same I/O and inter- FPGA paths as FED No show- stopper seen so far FED layout

4 November 2002Paul Dauncey - Electronics9 FED is designed to operate in large system for many years High emphasis on reliability and operation efficiency Hot swap capability, multiple-level temperature cut-outs, etc. Way over-engineered for a beam test May not mount all components to save on cost FED FPGAs need much greater functionality than readout board FPGAs are much higher grade (and more expensive) FED VME FPGA can do VME64; doubles VME data rate FED size is 9U not 6U; cannot reduce without redoing layout 9U board more expensive; board cost £3k  £6k Bigger, so aim to get more cables per board; 6  16 Less boards needed; 15  6 9U crate also more expensive; £5k  £10k Only need one VME crate for whole system Other aspects

4 November 2002Paul Dauncey - Electronics10 Trigger and test boards CMS take data out through non-VME backplane pins Custom data path as VME too slow Unused in readout board implementation Enough bandwidth to route trigger board signals into BE FPGA Aim to implement trigger board functions in part of BE All readout boards will be identical Select one slot for trigger functions to be turned on Saves engineering and layout for second PCB Still need to do firmware Most of FED debugged before used as readout board Testing much less of an issue Sophisticated board (£5k plus engineering) considered excessive Test board will be much simpler, less functional (£1k)

4 November 2002Paul Dauncey - Electronics11 Cost, effort, schedule Cost needs careful evaluation; probably come out very close 9U and expensive FPGAs push it up Less boards and crates pull it down Effort needed from RAL estimated to be slightly higher Layout effort; 3 months, down from 4 Engineering effort; 15 months total, up from 12 Need engineer for duration of project; now goes to Mar 2004 Would be significantly higher without reusing FED design Implies underestimate originally, or insufficient progress over summer Schedule should fit into later end date of Mar 2004 Delayed first layout until Apr 2003, after LHC work Also gives more time for RAL engineer to get up to speed Reduced prototype test time from 6 to 5 months