Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – December 2008 1 TOTFED – Firmware (1) Firmware: - 3 different ALTERA FPGA’s Cyclone Stratix Stratix.

Slides:



Advertisements
Similar presentations
12-18 September 2005Gueorgui ANTCHEV 1 A data readout module for the TOTEM experiment Anelli G. 1, Antchev G. 1, 2, Aspell P. 1, Chalmet P. 3, Da Silva.
Advertisements

On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
V. Filimonov, T. Hemperek, F. Hügging, H. Krüger, N. Wermes
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
22 February 2001ATLAS MDT Electronics PDR1 The MROD The MDT Precision Chambers ROD Adriaan König University of Nijmegen.
26 February 2002ATLAS Muon Electronics Meeting1 MROD: the MDT Read Out Driver Status of MROD-1 Prototype Adriaan König University of Nijmegen.
5 October 20002nd ATLAS ROD Workshop1 The MROD The MDT Precision Chambers ROD Adriaan König University of Nijmegen.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Kabuki 2800 “a real-time digital audio effects system for performance” team “Big Country” presents ECEN4610 Preliminary Design Review 14 September 2006.
Fabrication & Assembly of Opto-Rx12 Modules for CMS- Preshower S. K. Lalwani Electronics Division Bhabha Atomic Research Centre Mumbai –
DAQ Status. F.S. Cafagna, Coll. Meeting 16 March Hardware  In 555, one equipped crate for VME readout  top crate  9U crate  Power Supply 
Proposal for the read out system for the future Si. Vertex Detector with signal processing and hit data production for a fast track trigger ? M. Pernicka.
APS BPM and power supply applications on micro-IOCs W. Eric Norum
CMS Annual Review September 2004Geoff Hall1 Tracker Off-detector Electronics On-detector electronics production approaching completion procuring spares.
Remote Firmware Down Load. Xilinx V4LX25 Altera Stratix Control Altera Stratix Control Xilinx V4FX20 EPROM XCF08 EPROM XCF08 EPROM EPC16 EPROM EPC16 EPROM.
Team 2 Yimin Xiao Jintao Zhang Bo Yuan Yang.  The project we propose is a digital oscilloscope with playback function that provides almost any function.
1 Design of Pulsar Board Mircea Bogdan (for Pulsar group) Level 2 Pulsar Mini-Review Wednesday, July 24, 2002.
PCIe Mezzanine Carrier Pablo Alvarez BE/CO. Functional Specifications External Interfaces User (application) FPGA System FPGA Memory blocks Mezzanine.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
RCU Status 1.RCU design 2.RCU prototypes 3.RCU-SIU-RORC integration 4.RCU system for TPC test 2002 HiB, UiB, UiO.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
11 October 2002Matthew Warren - Trigger Board CDR1 Trigger Board CDR Matthew Warren University College London 11 October 2002.
Saverio MINUTOLITOTEM Trigger Meeting 12 January ~6k wires VFAT2 CSC T1 ARM 1 8 x ~6k wires VFAT2 CSC T1 ARM 1 8 x2 1 x2x15 30 T1 TRG_TOTFED.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
1 Pulsar Design Mircea Bogdan Level 2 Pulsar - Production Readiness Review Friday, Nov.7, 2003.
FED Overview VME-FPGA TTCrx BE-FPGA Event Builder Buffers FPGA Configuration Compact Flash Power DC-DC DAQ Interface 12 Front-End Modules x 8 Double-sided.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory28 March 2003 FED Project Plan 2003 FED Project aiming to satisfy 2 demands/timescales: Module.
T1 hardware Detector Control System, OK several automates have been added, LV and HV sequences. FSM manages transition between Busy, ON and OFF states.
Upgrade to the Read-Out Driver for ATLAS Silicon Detectors Atlas Wisconsin/LBNL Group John Joseph March 21 st 2007 ATLAS Pixel B-Layer Upgrade Workshop.
Alexei SemenovGeneric Digitizer Generic Digitizer 10MHZ 16 bit 6U VME Board.
1 FADC Boards for JPARC-K Preliminary Proposal Mircea Bogdan November 16, 2006.
CYPRESS SEMICONDUCTOR. 2 Cypress Confidential QDR Class vs DDR III (DRAM) 8 8 DDR3 SDRAM QDR2+ SRAM Multiplexed Address Bus (Row &
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
16th July 2003Tracker WeekJohn Coughlan et. al.FED-UK Group Final FED Progress Report CMS Tracker Week 16th July 2003.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory Clocks Data FEDv1 Final Firmware Subtasks Serial Comms VME LINK VME Bus VME SystemACE System.
PXI Systems - Discussions Gueorgui ANTCHEV / EP-ESSEPTAB Meeting February 2003Slide 1 of 3 PXI = Compact PCI + eXtensions for Instrumentation PXI is an.
26/11/02CROP meeting-Nicolas Dumont Dayot 1 CROP (Crate Read Out Processor)  Specifications.  Topology.  Error detection-correction.  Treatment (ECAL/HCAL.
JRA-1 Meeting, Jan 25th 2007 A. Cotta Ramusino, INFN Ferrara 1 EUDRB: A VME-64x based DAQ card for MAPS sensors. STATUS REPORT.
S. Durkin, CMS EMU Meeting U.C. Davis Feb. 25, DMB Production 8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board 550 Production Boards.
Ervin DÉNES Collab Meeting, 23 – Emulating TOTEM Front-End Driver for trackerDAQ sw.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
VME64x Digital Acquisition Board (TRIUMF-DAB) Designed to handle 2 channels of 12-bit 40MHz Data Will be used for both the LTI & LHC beam position system.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
CERN TFC status review, January 21, TFC status review l Agenda  Overview  Common solutions  TFC simulation framework  TFC Switch ‘THOR’  Throttle.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – December TOTFED – TOTEM Front End Driver VME64x Host Board OptoRX Firmware.
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
Electronic System Design GroupInstrumentation DepartmentR. Halsall, S. Taghavirad et alRutherford Appleton Laboratory5 March 2003 CMS Tracker FED Firmware.
LECC2003: The 96 Chann FED Tester: Greg Iles30 September The 96 channel FED Tester Outline: (1) Background (2) Requirements of the FED Tester (3)
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
ODE Workshop, LIP, 08/04/05 SRP: Current Status Irakli MANDJAVIDZE DAPNIA, CEA Saclay, Gif-sur-Yvette, France.
Track Sorter Slave chip TSS ASICs TSM: 3 pASICs TRACO ASICs.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
The Totem trigger architecture The LONEG firmware archtecture
AMC13 Status Report AMC13 Update.
Production Firmware - status Components TOTFED - status
HCAL Data Concentrator Production Status
COVER Full production should arrive today
14-BIT Custom ADC Board JParc-K Collaboration Meeting
Overview of T1 detector T1 is composed by 2 arms
JParc-K DAQ System Mircea Bogdan December 9-10, 2006.
Data Concentrator Card and Test System for the CMS ECAL Readout
TELL1 A common data acquisition board for LHCb
Remote System Update Example Design for Cyclone IV GX Transceiver Starter Board April 23rd, 2015 (Rev 1.0)
Presentation transcript:

Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – December TOTFED – Firmware (1) Firmware: - 3 different ALTERA FPGA’s Cyclone Stratix Stratix II GX - up to now 4 different FPGA’s designs: “VME64x Controller” “MAIN Controller” 1 to 3 “MERGER Controller” “OptoRX Controller” – see Michele slides

Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – December TOTFED – Firmware (2) “VME64x Controller” - Version 07 on SVN - VME Main Controller - VME64x complaint device - Primary Local Bus Controller - 32bit Data, 20 bit Address and Control - Secondary Local Bus Controller - 32bit Data/Address Multiplexed and Control - used for optional MFEC module - FPGAs Page Reload interface - JTAG Controller - From VME64 bus for remote programming - Trigger Timing Control (TTC) interface - Trigger Throttling System (TTS) interface - I2C Interface for TTCrx chip control – need programming - Board ID - Temperatures

Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – December TOTFED – Firmware (2) “MAIN Controller” 1 to 3 - Version 07 on SVN “MERGER Controller”- Version 07 under test - INPUT SPY Buffer - Parallel MHz SPY Data Buffer - 6 x 32bit FIFOs for VME readout (or 12 x 16bit) - MEMORY Interface Controller - Flow-Through SRAM 18-Mbit (512K x 36) - 3 chips for 96bit 80MHz - Firmware Version - Local Bus Interface - 32bit Data, 20 bit Address and Control - USB 2.0 Interface controller - High-Speed USB Interface Device CY7C68001 chip - enumeration only - Interconnect Bus - 64 bit between every MAIN Controller and MERGER Controller - Trigger Throttling System (TTS) interface - S-Link64 Interface Controller (for MERGER only) - 64bit Parallel Data Bus and Control on P2 connector - Interface to OptoRX12 – for MAIN only - 16bit Data, 20 bit Address and Control