Ohio Department of Transportation www.transportation.ohio.gov John R. Kasich, Governor Jerry Wray, Director 2015-D08-04 CLE-32 Eastern Corridor Phase 4a.

Slides:



Advertisements
Similar presentations
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
Advertisements

Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director.
GIS for Strategic Asset Management (GSAM) Kick-Off John Kasich, Ohio Governor Jerry Wray, ODOT Director.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Ohio Planning Conference Organizing for Reliability – A State Perspective.
John R. Kasich, GovernorJerry Wray, Director Ohio Department of Transportation 2010 Pavement TPR Review.
John R. Kasich, GovernorJerry Wray, Director Ohio Department of Transportation SiteXchange (C-92) Tina Collins Office of Contracts.
CONTRACTOR OUTREACH PROGRAM September 25, Disaster Recovery Program  $5.08 Billion HUD Funds to Mississippi in form of Community Development Block.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director ODOTcadd Standards VBA Application Updates Eric Thomas, CADD Consultant.
Office of State Planning and Budgeting: Capital Construction and Information Technology Projects Review and Requests June 6, 2014 Laura Blomquist.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director PIAC HAM ; PID Major Rehab - Design Build Project Letting.
Environmental Assessment Public Meeting
District Two May 9, 2013 District Two May 9, 2013 Strategic Intermodal System Funding Strategy.
City of Palm Coast- Flagler County Transportation Impact Fees City Council-Flagler County Commission Workshop.
Presentation to the Gubernatorial Task Force On Modernizing Transportation Funding In Idaho Keith Bybee Legislative Services Office Budget and Policy Analysis.
HOOSIER HEARTLAND HIGHWAY Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to.
PennDOT’s Transportation Alternatives Program February 18, 2014.
December 3,  Summarize how the bond act affects  The attributes of the high-speed rail system  The timing and sequence of construction.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
John R. Kasich, GovernorJerry Wray, Director Ohio Department of Transportation Shale Impacts to ODOT’s Infrastructure Anna.
Transportation/Land-Use Connections Program Program Evaluation Proposal for FY 2009 Program September 5, 2008 Darren Smith, Sarah Crawford Transportation.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Executive the State Level. Governor and LT. Governor John Kasich (R)and Mary Taylor (R) Cabinet (26 positions) Natural Resources, Developmental.
Affordable UAV Technology - GSAM Presentation May 2011
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
DRAFT Proposed Adjustments to the FY SYIP, CTF and VDOT Budgets Laura Farmer Director, Financial Planning Division September 16, 2014.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
I-270/US33 Interchange Upgrade, Phase 1 Leadership Briefing Presented by: The City of Dublin | May 12, 2011.
A Very Small Starts Proposal CAN be easier than you think Karl Otterstrom, AICP Spokane Transit, Director of Planning Spokane, WA QUALITY TRANSIT -- NOW.
School Improvement Grant (SIG) Cohort 3 Competition April 26, 2012 Gina Scroggins Director, School Turnaround.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director OpenRoads Overview Eric Thomas, CADD Consultant Office of CADD and Mapping.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief John Mitnik, P.E. Engineering.
TRAC Presentation October 13, 2015 BEL-70-Mall Road Connector “Commons Mall Crossing” PID Belmont County Transportation Improvement District.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Real Estate Overview Matt Kouskouris, Division.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Division of Chief Legal Counsel Patrick Piccininni,
Ohio Transportation Planning Conference July 16, 2014.
Department Approved Cost The approved cost of a project phase represents the dollar amount that the Department has authorized that may be spent on a project.
N EW O HIO R IVER B RIDGE JEF-Wellsburg Bridge – PID#79353 New Ohio River Bridge Steubenville Weirton Map Data © 2015 Google Steubenville, OH - Weirton,
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Office of Estimating 2015 OCA Leadership Forum.
Project Briefing for BROOKS BRIDGE REPLACEMENT STUDY and SANTA ROSA SOUND ALTERNATE CROSSING STUDY April 2015 SPEAKER: BOB.
MED SR 18 Corridor Project MED PID October 13, 2015.
2015 TRAC Presentation Marion 3-OH-9 Intermodal ODOT District Six Brian Davidson Project Manager Planning & Engineering.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director ODOT Division of Communications Melissa Ayers Deputy Director of Communications.
Budget Hearing August 5,2014. This document summarizes South Kitsap School District’s budget for the schools year (September 1, 2014 through.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director 2015-D08-02 HAM-Elmore to Central Parkway Connector.
2015 Partnering Conference “Division of Program Management” September 8, 2015 Ron Rigney, PE & PLS Director, Division of Program Management 1.
Project Sponsor: Ohio Department of Transportation District 12.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Department of Municipal Affairs Community Sustainability Partnership.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
Butte County Climate Action Plan Contract for Services December 11, 2012 Butte County Department of Development Services Tim Snellings, Director.
State Rail Service Improvement Fund (SRSIF)
Holly Street Bridge Retrofit and Rehabilitation Project
2017 ACEA Annual Conference
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
RideSolutions/air quality RFP Resolution T-16-16
2013 Specification Implementation
Nutrition Education Program
EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE
Consultation (C) After approval of the EIS, FONSI, or CE designation, the applicant shall consult with the Administration prior to requesting any major.
2013 Specification Implementation
FY 2018 – FY 2022 Project Priorities Florida-Alabama TPO
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
THE GOVERNMENT OF THE STATE OF OHIO
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Presentation transcript:

Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director 2015-D08-04 CLE-32 Eastern Corridor Phase 4a October 13, 2015

2 Project History 2009: District 8 requested $59.60 million for Environmental through Construction 2010: Design Consultant Authorized for all three projects in Phase 4a PID TRAC Presentation 10/13/15

3 Project History 2015: TRAC List committed $1.3M for PE and $1.8M for DD Alternative Evaluation Report Approved PID TRAC Presentation 10/13/15

4 PID TRAC Presentation 10/13/15

5 TRAC Funding Request Right-of-Way: Total cost: $15.63 Million $3.13 Million from Local Funding (20%) TRAC Amount Requesting: $12.50 Million (80%) TRAC B/C Ratio – 7.11 (Score of 10) PID TRAC Presentation 10/13/15

6 Thank You Questions? PID TRAC Presentation 10/13/15