Main Headquarters: 120 Water Street, Suite 350, North Andover, MA 01845 With offices in: NY, ME, TX, CA, OR www.ers-inc.com Standard Protocol for Non-Residential.

Slides:



Advertisements
Similar presentations
UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011.
Advertisements

D EEMED M EASURE R EVIEW P ROJECT Final Report December 7, 2010 Regional Technical Forum Presented by: Michael Baker.
RTF Lighting Standard Protocol Review of Hours of Operations, Controls Savings, and Variation.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Non-Res Lighting Subcommittee Retrofit Lighting Standard Protocol Review 10/23/13.
Industrial Pump Motor VFDs: Provisional Standard Protocol Christian Douglass Regional Technical Forum 5/12/2015.
Fan VFD Calculator Development Staff Request for Authorization of Funding from the Regional Technical Forum 28 June 2011.
Provisional Protocol and Research Plan: Non-Residential Lighting Retrofits Regional Technical Forum December 16, 2014 Seems fine to me. (Baker) I like.
Regional Heat Pump Water Heater Evaluation Committee Kickoff March 8 th, 2012.
Implementer’s Group April 2015 Meeting Debrief and Upcoming Meeting Prep April 24, 2015.
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Document number Developing the Business Case for Updating the PNW Region’s End-use Load Shapes Regional Technical Forum Prepared by Lorin Molander October.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
Implementer’s Group January Meeting Debrief and Upcoming Meeting Prep January 29, 2015.
Provisional Protocol and Research Plan: Non-Residential Lighting Retrofits Nonresidential Lighting Subcommittee November 6, 2014.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Non-Residential Network Computer Power Management UES Measure Update Regional Technical Forum July 16, 2013.
Non-Res Lighting Subcommittee Retrofit Lighting Standard Protocol Review 04/03/14.
Pre-Rinse Spray Valve Small Saver UES Measures Regional Technical Forum September 17, 2013.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Residential Integral LED Bulbs Part II presented to the Regional Technical Forum John Wilson,
GUIDELINES FOR RTF MEASURE LIFE Briefing to the Regional Technical Forum May 15, 2012 Lisa A. Skumatz, Ph.D. Skumatz Economic Research Associates Mark.
Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
RTF Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Oregon ENERGY STAR Homes Measure Update Adam Hadley Regional Technical Forum March 17, 2015.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
RTF Management Update Jennifer Anziano Regional Technical Forum May 12, 2015.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
EER Analysis Results Regional Technical Forum March 18, 2014.
Staff Updates Regional Technical Forum November 19, 2013.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
Commercial Showerhead UES Measure Update Regional Technical Forum April 16, 2013.
Experience you can trust. Phase 1: Cataloguing Available End-Use and Efficiency Load Data September 15, 2009 End-Use Load Data Update Project.
Research Strategy Review: Advanced Power Strips MH HVAC Related Measures Jennifer Anziano RTF R&E Subcommittee August 6, 2015.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Implementer’s Group July 2015 RTF Meeting Debrief and Upcoming Meeting Prep July 29, 2015.
RTF Staff, Subcommittee and Work Updates October 4, 2011.
Proposed 2015 RTF Work Plan September 16, Work Plan Development Process RTF 2015 work plan ProcessDate Develop draft work plan and present to Operations.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Extension of Provisionally Deemed Smart Strip in Commercial Applications RTF March 2,
Non-Residential Lighting Protocol - Retrofits Regional Technical Forum September 16, 2014.
Regional Technical Forum Automated Conservation Voltage Reduction Protocol.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
Proposed Rooftop HVAC Standardized Field Measurement Protocol and Annual Savings Calculator RTUG REVIEW January 31, 2012.
Residential Weatherization and Ventilation Subcommittee: Infiltration Impact Research Plan Presentation to the Regional Technical Forum December 13, 2011.
Non-Residential Lighting: Status Update Christian Douglass & Josh Rushton Regional Technical Forum November 10, 2015.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Presented by: Todd Amundson, BPA Jane Peters, research into action Ryan Fedie, BPA Update.
RTF Staff, Subcommittee and Work Updates June 19, 2012.
Structure and Integration of RTF Guidelines: Savings, Lifetimes and Cost/Benefit July 17, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Scientific Irrigation Scheduling Subcommittee Thursday, August pm – 3pm, PDT.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Smart Power Strips in Commercial Office Applications RTF August 30, 2011.
Proposed 2015 Work Plan and 3 Year Look Back September 18, 2014.
Planning UES Measures: Prescriptive Duct Sealing SF Performance-based Duct Sealing SF Performance-based Duct Sealing MH Adam Hadley & Josh Rushton Regional.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
G UIDELINE R EVISIONS – R ELEASE February 1, 2011 Regional Technical Forum Presented by: Michael Baker.
Non-Res Code Compliant Lighting: Working Toward a Standard Protocol Christian Douglass, RTF Contract Analyst Non-Residential Lighting Subcommittee October.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Residential Single Family Clothes Washer UES Measure Update Regional Technical Forum September 16, 2014.
Exterior LED Area Lights
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
Implementer’s Group October 2015 RTF Meeting Debrief and Upcoming Meeting Prep October 29, 2015.
Guidelines Revisions Next Steps April 23, Process to Date Staff and others identified a number of “issues” since guidelines were last approved April.
RTF Staff, Subcommittee and Work Updates February 14, 2012 IRTF.
RTF Management Updates Jennifer Light Regional Technical Forum February 17, 2016.
Presentation transcript:

Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential Lighting Efficiency Measures Regional Technical Forum Meeting October 23, 2012

 Introduction  Project status  Project participation  Protocol revisions since last RTF meeting  Remaining issues Agenda

 Kick off meeting held - March 9 th  Work plan developed – March 21 st  Review memo distributed – April 20 th  Draft protocols posted for review May 10 th  Subcommittee discussion on Draft – May 16 th  Revised Protocol posted – June 27 nd  Lighting subcommittee review – July 3 rd  Protocol update for Subcommittee – July 17 th  Lighting subcommittee review – August 7 th  RTF Presentation (2 hrs) August 21 st  Lighting Subcommittee Review August 28 th  Lighting Subcommittee Review September 13 th  Lighting Subcommittee Review October 3 rd  Lighting Subcommittee Review October 10 th Project Status Review

Subcommittee Participation RTF Staff9-Mar 16- May3-Jul7-Aug 21- Aug 28- Aug 13- Sep3-Oct10-Oct Grist, Charlie X X XX Charles, Gillian Eckman, Tom Kendall, MarkXXXXXXXXX Hadley, Adam XX X O'Neil, NickXXXXXXXX Contractor (ERS) Brian McGowanXXX David ReynoldsXXXXXXXXX Chris SmithX Dan BirleanuX Gavin GuiXX Todd Winner X Stephen Achilles XXX X

Subcommittee Participation Subcommittee9-Mar 16- May3-Jul7-Aug 21- Aug 28- Aug 13- Sep3-Oct10-Oct Andy Baker X XX Mike Baker XXX X Bing TsaoXX Bobbi Wilhelm Corky Clark X Cory Read Craig Cirany XX XX Crispin Wong Curt Flores Danielle Gidding XXXXXXX David Thompson X X XXXXXX Dawn DoberenzX Elaine Miller X Eric BratengXXXXXXXXX Graham Parker X Jay Himlie X X XX Joseph Vaccher XXX XXX

Subcommittee Participation Subcommittee9-Mar 16- May3-Jul7-Aug 21- Aug 28- Aug 13- Sep3-Oct10-Oct Don Jones Jr.XXXXXXXXX Lauren Gage X X My K TonXX X XX Peter MeyerXX Ray Hartwell XXX XXX Rich Arneson XXXX XX Roger PeeryXXXX X XXX Roger SpringXX X Spencer MoersfelderX X XX Tom Eckhart X Tom LeinhardXXXXXX X Travis ReederX John WilsonXXXX XXXX Ken Keating X Angela Pilant X Shani Taha X Laura McCrea X XX

 Addressed issues raised at last RTF meeting  Incorporated Guidelines language for current practice and pre-conditions baselines - Simplified  Sunset date set to 9/30/2015  Baseline lighting fixture data table added to calculator  Procedural clarifications to provisional data collection  Added option to use local HVAC modeled interaction  Held four additional Subcommittee meetings  Focus on provisional data collection Narrowed data collection efforts to specific occupancy and control types Added meter data collection options and detailed data collection procedures  Other issues addressed include: Baseline selection criteria Regional coordination of data collection Protocol scope and purpose Activity Since RTF Meeting

Lighting Hours of Operation  Select Hours of Operation:  Default hours of operation in calculator, or  Interview with on-site operator as determined by practitioner Simplest Reliable Method

Hours of Operation Defaults Data Source, hours of operation: Pre and post metered studies: Lawrence Berkeley National Lab Efficiency Maine California 2011 DEER database Compared with Utility defaults: BPA lighting calculator NY Tech. Resource Manual Avista lighting calculator

Lighting Control Savings  Select Controls savings fractions  Savings fractions - proven by statistically reliable pre- and post-metering in calculator Simplest Reliable Method

Controls Provisional Data

Criteria included:  High variability in hours or savings fraction  Magnitude of the impact on savings  Little or no pre-post metered data  Conditions where hours and savings fractions combine as significant determinants  Where simplest reliable candidates (default of interview methods) require additional data for verification or development Provisional Data Collection

Operating Hours  Assembly  Education, university, and college  Industrial/manufacturing  Warehousing  Exterior area lighting with dimming or photocell control Control Applications  Day lighting - open office space lighting  Classrooms, gymnasiums, assembly in university, college, and K-12  Occupancy sensors - warehouses  Occupancy sensors - parking lots, parking garages Provisional Data Collection

Utility Control Savings Fractions Currently in use:

 Clarified purpose statement  Baseline selection simplified  Definitions clarified to use regional terms  Provisional data collection reviewed and accepted  Regional sample not defined, agreed to develop plan Issues From October 10 th