PACS IBDR 27/28 Feb 2002 PACS ICC1 ICC (EGSE, IA/QLA, HCSS) Otto H. Bauer MPE Garching.

Slides:



Advertisements
Similar presentations
SOFIA SOFIA Science Steering Committee Meeting Palmdale, Feb 18, 2010 Dietmar Lilienthal / Alois Himmes.
Advertisements

PACS SVR22/23 June 2006 Erich Wiezorrek, MPE Test Facility Capabilities EGSE.
PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching.
PACS IBDR 27/28 Feb 2002 PACS Cryo Harness1 U.Grözinger, D.Lemke, R.Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from CSL,
PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …1 PACS Management, Funding and Schedule Otto H. Bauer MPE Garching.
PACS IBDR 27/28 Feb 2002 Herschel PACS SPU - IAC1 Herschel PACS - IBDR SIGNAL PROCESSING UNIT - SPU - HW Unit, Start-up SW and Low-level SW Drivers José.
Working Group on Calibration and Validation Working Group on Cal/Val Update Albrecht von Bargen (DLR) SIT-30 Agenda Item 10 CEOS Work Plan Deliverables.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
SDO/AIA science plan: prioritization and implementation: Five Objectives in 10 steps [session no.] HMI/AIA science teams meeting; Monterey; Feb
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
XMM-Newton EPIC OCB, 6-Nov-2007 EPIC OCB, 6-Nov XMM-Newton Future Instrument Operations Mallorca, 6 th -7 th November 2007 M. Casale, J.R. Muñoz.
MIRI software; implementation plan Peter Roelfsema.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Mattia Vaccari & Giulia Rodighiero & Gabriele Mainetti Department of Astronomy -
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
Data processing group. General study of data processing architecture: - overall definition of the data processing functions - share of tasks between on-board.
D. McMahon Generation of Ground ODFs ESA ODF-CB 3-5 March 2004 Gerd Soellner (DLR/Col-CC) Co-author Nathalie Gérard.
PACS IBDR 27/28 Feb 2002 SPU High Level Software1 H. Bischof, A.N. Belbachir (TUVIE) F. Kerschbaum, R. Ottensamer, P. Reegen, C. Reimers (UVIE)
EddiCam: The Eddington Photometric Camera EddiCam Definition Phase Kick-Off Meeting J. Miguel Mas-Hesse Vienna, 17th Sept., 2001.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
Consortium Meeting La Palma October ICC Status Tanya Lim 1 SPIRE Consortium Meeting La Palma, Oct. 1 – ICC Status Tanya Lim RAL.
Science and Technology Committee GGOS, December 2006.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Robotics & Engineering Design Projective Management Chin-Sung Lin Eleanor Roosevelt High School.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS IBDR 27/28 Feb 2002 PACS Data Flow1 PACS Data Flow, Instrument Modes and Operations Helmut Feuchtgruber MPE.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
EMI INFSO-RI Guidelines and SQA Process Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2010 Lexington, KY PWG F2F Meeting.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
PACS IBDR 27/28 Feb 2002 OBSW Simulation1 PACS OBSW Simulation/Test A.Mazy (CSL), S.Pezzuto (IFSI), A.N.Belbachir (TUVIE), H. Feuchtgruber (MPE)
GLAST Science Support Center June 21, 2007 Getting Involved with GLAST GLAST Guest Investigator Program David Band, GSSC CRESST/GSFC/UMBC.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
PACS SVR38/9 Nov 2007 System Testing1 Tests on Satellite Level H. Feuchtgruber.
LISA News from ESA O. Jennrich LISA Project Scientist.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
Doc.: IEEE /0240r1 Submission November 2006 Carl R. Stevenson, WK3C Wireless LLCSlide 1 IEEE WG Opening Report – November 2006 IEEE P
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
PACS IIDR 01/02 Mar 2001 EGSE1 Otto H. Bauer MPE.
08-Nov-2007 Ekkehard Wieprecht SVR III MPE PCSS / HCSS / Pipeline Framework.
Page 1 PACS GRITS 17 June 2011 Herschel Data Analysis Guerilla Style: Keeping flexibility in a system with long development cycles Bernhard Schulz NASA.
3 He Fridge SPIRE WE Review Dec. 6-7, IFSI 1 3 He Sorption Fridge “Cooler” WE Preliminary Design Presented by: L. Rodriguez / CEA/SAp. Subsystem.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August, 2010 Bagsværd, DenmarkPWG F2F Meeting.
ASI Review Padova ICC Contribution 1 WP3000 : Padova ICC Contribution Staff Alberto Franceschini (AF) [Professore Ordinario] Giulia Rodighiero (GR) [Ricercatore.
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
PACS ICC Readiness Review MPE, July 3/ Operations Scenario I I) ICC Implementation 1/24 E. Sturm: Operations Scenario I Eckhard Sturm ICC structure,
1 st EGI CMMST VT meeting 19 February 2013 A. Laganà (UNIPG, Italy)
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
Interstage BPM v11.2 1Copyright © 2010 FUJITSU LIMITED INTRODUCTION TO INTERSTAGE BPM.
I&T&C Organization Chart
GLAST Large Area Telescope:
WP5: Dissemination, studies, web portal and tools
GLAST Large Area Telescope:
Application of Systems Engineering to Nuclear Fusion projects
Jim Aloise System Programmer
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope:
Presentation transcript:

PACS IBDR 27/28 Feb 2002 PACS ICC1 ICC (EGSE, IA/QLA, HCSS) Otto H. Bauer MPE Garching

PACS IBDR 27/28 Feb 2002 PACS ICC2 Milestones Funding until end of 2005: approved by DLR ICC training: 11/12 MPE  28 participants, tutorial and demo sessions about all aspects and work packages of the Herschel mission relevant for the PACS ICC AVM-ILT test: starts beginning of April 2002 AVM/CQM test: starts April 2003

PACS IBDR 27/28 Feb 2002 PACS ICC3

PACS IBDR 27/28 Feb 2002 PACS ICC4 Current Tasks and Schedule IA/QLA  Quick Look Analysis, Calibration Analysis, Trend Analysis, Automatic Test Analysis, Science Analysis  Version 1.0.: end of March 2002 (mainly QLA plus IA environment)  “Tiger Team” to investigate common IA structure: Report: April 4, 02 EGSE / HCSS development  SCOS2000, MIB editor, test equipment, data model, TM/TC interface …  EGSE integration at MPE: October 22/23  First EGSE-DPU tests at IFSI: January 14/15 (remote access from MPE possible !)  HCSS version 0.1: Integration ongoing, Beta-release available in April

PACS IBDR 27/28 Feb 2002 PACS ICC5 Current Tasks and Schedule (II) Instrument Commanding  On-board command procedures (OBCP), Common Uplink System (CUS), TC/HK parameter definition, test procedures…  Ready for AVM: end March 2002  Ready for CQM: end 2002  CUS to be filled in March 2002 Calibration  Def. of in-orbit cal. req., Input to ground-based cal. req. (test optics, cal. sources, astronomical sources) …  2nd draft of calibration document (IOCRD): Feb 15

PACS IBDR 27/28 Feb 2002 PACS ICC6 Current Tasks and Schedule (III) Simulations/Modeling  Simulator as required by SIRD (to be used for end-to-end tests of operating procedures, AOT validation, SW tests etc.) under investigation  Instrument simulator (to gain a deeper understanding of the instrument by simulating the complex effects and interactions of the many steps through telescope and instrument, e.g. noise, glitches, drifts, detector time responses etc.)  1 st version of (elements of) instrument simulator: mid 2002 (linked to AOT design) Management  SIP ready March 18

PACS IBDR 27/28 Feb 2002 PACS ICC7 Current Tasks and Schedule (IV) System Engineering  Quality assurance, config. control, ICC web pages, documentation and AI system … AVM-ILT operation (together with H/W Team)  starting April 2002