SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:

Slides:



Advertisements
Similar presentations
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
Advertisements

11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS Update The NUV Gratings 18 October 2007 Last COS TIPS presentation: 21 December.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001.
TIPS presentation 19 July 2007Charles Proffitt COS-STIS TeamPage 1 STIS FUV MAMA Dark Current Charles Proffitt COS-STIS Team.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
Cosmic Origins Spectrograph Hubble Space Telescope James C. Green University of Colorado Cosmic Origins Spectrograph Instrument Design and Capabilities.
University of Wisconsin System HRS Project Update to ITC November 19, 2010.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
TIPS Meeting 1.Observing Solar System Objects with JWST Ed Nelan 2.COS - Updates on COS DevelopmentKen Sembach 3.NICMOS StatusTommy Wiklind Next TIPS Meeting.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review COS Lamp Lifetime Estimates for TAGFLASH Scenarios.
Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode)
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 20 October 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
COS PIPELINE PDR Daryl Swade December 7, 2000OPUS / OTFR Space Telescope Science Institute 1 of 24 Science Data Processing
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
18 May 2006 Slide 1 of 10 STScI TAGFLASH Ground System Development Current ground system could support immediate COS launch Current ground system could.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
Cosmic Origins Spectrograph
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Goals of CALCOS Association Table Input and Output Files High Level.
May 18, 2004Ron Allen, STScI Lunch Talk1 Space Interferometry Mission (SIM) Update - May 2004 Ron Allen SIM Mission Scientist Space Telescope Science Institute.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline PDR File Structure Overview Charles D. (Tony) Keyes 7 December 2000.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
TIPS COS Status: SMOV update III STScI/CU COS Team 17 September 2009.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Status STIC 13 February 2001.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Jan 15, 2004WFC3 TIPS – John W. MacKenty1 WFC3 TIPS Presentation January 15, 2004 Optical Stimulus.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Nodal Program Update Mike Cleary Sr. VP and Chief Technology Officer.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Critical Design Review July 2001.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
COS OPUS/HDA CDR Daryl Swade July 23, 2001Keywords and Associations Space Telescope Science Institute 1 of 14 Keywords and Associations.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 September 1999.
Cosmic Origins Spectrograph November 13, 2003 Page 1 “Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
Development Project Management Jim Kowalkowski. Outline Planning and managing software development – Definitions – Organizing schedule and work (overall.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
STScI Ground System Development Status:
Presentation transcript:

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 December February 2003

Hubble Mission Status Review Page 2 of 10 Space Telescope Science Institute Status as of: 11 February 2003 PROJECT: COS COS Optical Bench and Enclosure

Hubble Mission Status Review Page 3 of 10 Space Telescope Science Institute Status as of: 11 February 2003 PROJECT: COS Project Summary Budget Schedule Technical D Remarks STScI work on schedule; Ops bench commanding testing proceeding STScI work progressing well; SI: FUV detector swap approved; integr. ongoing J G G GG GG MAJOR PROBLEM NO SOLUTION YET MODERATE PROBLEM SOLUTION EXISTENT LEGEND: NOMINAL Y G R The project is on track. – most recent report: 10 December 2002 Role: STScI supports COS science operations by leading development of “front-end” (operations) and “back-end” (OPUS/MAST/calibration) ground system and user support functions. COS project is led by COS Team, and presently consists of 13 people drawn from INS/COS and ESS; 7 presently charge directly to WBS or

Hubble Mission Status Review Page 4 of 10 Space Telescope Science Institute Status as of: 11 February 2003 PROJECT: COS Health Chart SubprojectStaffingScheduleTechnical Instrument DevelopmentOK (g)ongoing (g) IDT/STScI MOU (g) I & T Ball (g) Commanding and RPS2OK (g)ongoing (g) OP-01 (g) Ops bench testing (g) Pipeline and CalibrationOK (g)ongoing (g) keyword development (g) pipeline development (g) SM4 initial planning (g) User SupportOK (g)ongoing (g) COS ETCs (g)

Hubble Mission Status Review Page 5 of 10 Space Telescope Science Institute Status as of: 11 February 2003 PROJECT: COS Tool is not mature enough for use in Cycle 11 Phase II Cycle 11 Phase II to be released Spring ‘02 (originally January ‘02) Evaluation underway (internal & external evaluators) look and feel GUI process model PROBLEMS/ISSUES PROGRAMMATIC IMPACT ACTION DATE ESTAB.COMPL. 1) Deuterium lamp vibration test failure; 2) FUV detector swap 1) Vendor revise design of Deuterium lamp, fabricate new lamp, test lamp, install on cal platform; 2) remove FUV01; replace with FUV02; CAOS/HOMS alignment check before and after CURRENT STATUS1) Closed 2) Open 1) New lamp installed on cal platform successfully; integrated in SI 2) FUV01 presently in align test on CAOS/HOMS; FUV02 install and align re-check requires 3 weeks, to be complete late Feb; 3-week delay to SI schedule and MOU deliverables (STScI T-V support development). None to STScI short-term; both cause delay for integration of SI; IDT delay in MOU deliverables, T-V and SI delivery Instrument Development (SI)  Y G

Hubble Mission Status Review Page 6 of 10 Space Telescope Science Institute Status as of: 11 February 2003 PROJECT: COS SI News:  FUV backup detector, FUV02, completed T-V at CU QE of both detectors similar at most wavelengths, FUV02 ~25-50% higher than FUV01 at certain critical longer wavelengths on specific detector segments Decision made to swap detectors; FUV02 will be flight detector (install mid-Feb) 3-week additional delta to timeline (science cal T-V now starts in mid-June)  Re-designed deuterium flat field installed in cal system  Calibration system and detector electronics installed on optical bench and in enclosure bulkheads COS display at STScI January 2003 AAS booth Highlights - Accomplishments

Hubble Mission Status Review Page 7 of 10 Space Telescope Science Institute Status as of: 11 February 2003 PROJECT: COS FUV02 / FUV01 QE Comparison

Hubble Mission Status Review Page 8 of 10 Space Telescope Science Institute Status as of: 11 February 2003 PROJECT: COS Highlights - Accomplishments (cont.) STScI scheduling system  Ops bench testing at Ball (Jan 03)  All components except target acquisition  FUV & NUV unique timing SMS and reconfiguration SMS successfully completed  NUV commanding-certification SMS successfully completed  FUV commanding-certification SMS initial runs (minor issues)  Additional re-tests (including target acquisition) will be made remotely  Revised Phased Development plan (new work and updates)  QEKEYWORD and QEASSOCIATION handling work in testing Continued review of impacts of SM4 date changes on STScI activities  Revised SMGT date  Review special commanding and SMOV requirements timelines (T-V impact) STScI continued Thermal-Vac requirements planning and preparation  Coordination of planned STScI support activities with IDT Thermal-Vac archive tables and screens established Draft keyword descriptions for Keyword Dictionary and ICD-19 Successful calcos testing with integrated SI data (from N 2 purge) STScI post-SM4 data volume study – COS participation ongoing G

Hubble Mission Status Review Page 9 of 10 Space Telescope Science Institute Status as of: 11 February 2003 PROJECT: COS Continue Special Commanding requirements definition Continue Anomalous Recovery, Initial Turn-on development Complete review of Phase Development Plan Continue STScI FSW tests (T.A. and FUV cert) on ops bench Complete review and issue OSM thermal issues report Continue Bright Object Screening scheduling system development Continue APT spectroscopic ETC development Prepare T-V support plan Deliver APT Target Acquisition ETC requirements definition Milepost Dates: {+ ==> later than last report}  COS Thermal-Vac at Ball: 15 June – 12 July 2003 [revised timeline]  SI delivery to GSFC: 1 Aug 2003 (+1 month) [revised timeline]  SMGT: 3 Mar 2004 (-3.5 months) [SM4 timeline change]  Launch: 18 Nov 2004 (-3.5 months) [SM4 timeline change - NASA] Planned Activities and Future Milestones

Hubble Mission Status Review Page 10 of 10 Space Telescope Science Institute Status as of: 11 February 2003 PROJECT: COS COS Phase Development Plan (rev 8, 01/06/03) Phase 1 (1/1/00 – 6/30/00) 1.Macro Development 2.Reconfigurations Phase 2 (7/1/00 – 12/31/00) 3.NUV Timetag Mode + Darks 4.FUV Timetag Mode + Darks Phase 3 (1/1/01 – 6/30/01) 5.FUV & NUV Accumulation Science Exposures 6.FUV & NUV Target Acquisition Exposures 7.FUV & NUV Target Peakup Exposures Phase 4 (7/1/01 – 12/31/01) 8.Aperture Alignment Exposures 9.OSM1 Focus Alignment Exposures 10.OSM1 Rotation Alignment Exposures 11.OSM2 Rotation Alignment Exposures 12. FUV & NUV FP-Split Exposures Phase 5 (1/1/02 – 6/30/02) 13.FUV & NUV GO Wavelength Calibration Exposures 14.FUV & NUV Flat Field Lamp Calibration Exposures 15.FUV & NUV Automatic Wavelength Calibration Exposures 16.SAA Contours Phase 6 (7/1/02 – 12/31/02) 17.FUV & NUV BOP Target Screening Phase 7 (1/1/03 – 6/30/03) 18.FUV & NUV Flat Field Lamp Re-work 19.Coordinated Parallels Phase 8 (7/1/03 – 12/31/03) 20.OSM Heating Avoidance (if needed) 21.SMGT Preparations 22.SMOV Special Commanding 23.FUV & NUV Anomalous Recovery 24.FUV & NUV Initial Turn-on Phase 9 (1/1/04 – 6/30/04) 25.TRANS ovratalstart, ovratalend Phase 10 (7/1/04 – 12/31/04) 26.FUV & NUV Lifetime Adjustments