Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
FIGURE OF MERIT FOR MUON IONIZATION COOLING Ulisse Bravar University of Oxford 28 July 2004.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
MICE Top-Level Project Schedule Step IV Step V Step VI Revision date: 17 th June,
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
Detector Systems Update MICO May 19, MICE Detector Systems  Beam Monitors u Over heating of sender boards has been s Solution.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
Upstream PID Review at CM16 A.Bross VC September 13, 2006.
1 MICE Project Board Schedule and milestones Reconstructing the schedule Present status Monitoring and feedback Key schedule drivers and concerns Andy.
CMPB Alain Blondel 14 April STATUS OF MICE.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
PM report International MICE programme Principal deliverables Schedule summary Schedule considerations and drivers Status of SS, RFCC and EMR, LH2 & LiH.
MICE Project Board MPB Alain Blondel 1 MICE Project board 3 MICE Status Responses to MPB2 recommandations.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
Alain Blondel MICE collaboration meeting CM25 RAL November   MICE The International Muon Ionization Cooling Experiment.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
11 Nov 2008PC Analysis PC Schedule 2008 Tuesdays fortnightly 9 September  23 September  2 October  CM22  11 November  25 November 9 December.
MICE CC visit at CERN Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
1 MICE Schedule Review no 1 Aims of review and description of review charge Motivation and external drivers Aims of the review A few of the problems Description.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
MICE Detector Integration A. Bross Mice Video Meeting August 27, 2003.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Alain Blondel 4 April  Aspirational MICE Schedule as of April 2008 Febuary-July 2008 STEP I September 2008 November 2008 to summer 2009 STEP II.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
Tuesday 9 th January Project Status Report Project Achievements Project Schedule Issues Finance Summary Risk Register Photos.
MICE Construction Project Update: SSs, PRY, Cavities, Tracker… 1MAP Friday Meeting – January 30, 2015 Alan Bross.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
MICE S TEP IV P HYSICS ‘D ELIVERABLES ’ V. Blackmore MAP 2014 Spring Meeting 30 th May, /15 AKA “What will we learn from Step IV?”
US Construction Project: SSs, PRY, Cavities and test program 1.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
MICE Spectrometer Solenoids Step IV running
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Muon Ionisation Cooling Experiment Overview
Completion of the MICE-US construction project
Status of the MICE Construction Project
MICE CM31 Schedule summary
Spectrometer Solenoid Fabrication Status and Schedule
Controls & Monitoring in MICE
Presentation transcript:

Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013

Muon Ionization Cooling Experiment  Measure transverse (4D) Muon Ionization Cooling  10% cooling – measure to 1% (10 -3 )  Single-Particle Experiment  Build input & output emmittance from  ensemble Alan Bross AEM October 14, Tracking Spectrometer RF Cavities Focus Coils Magnetic shield Liquid Hydrogen Absorbers Fiber Tracker

MICE Beam Line Alan Bross AEM October 14, 20133

Schedule Alan Bross AEM October 14, TOF, CKOV, CAL

Schedule II  Schedule has been driven by magnet delivery.  Step IV need: u 2 Spectrometer Solenoids + 1 AFC  Step VI need: u 2 Spectrometer Solenoids + 3 AFC + 2 Coupling Coil  Magnet STATUS: u Spectrometer Solenoids s 1 at RAL, ready for installation s 2 nd still at vendor. Expect to ship by December u 2 AFCs delivered s First fully tested, but does not meet full spec. s Second to start testing in November u Coupling Coil s First coil under test at STF s First cryostat nearing completion at LBNL Alan Bross AEM October 14, 20135

Photo gallery Alan Bross AEM October 14, SS leaving vendor SS at RAL AFC CC Test at CHL (STF)

Alan Bross AEM October 14, RF for Step VI

Alan Bross AEM October 14, 20138

RF Power Alan Bross AEM October 14, First RF amplifier installed Tests early next year