8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.

Slides:



Advertisements
Similar presentations
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
27 September 2005A.Ciocio - ID Week1 SCT Service Installation Overview Status of Type IV Cable Installation Type II/III Cable Installation Plan for the.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
SCT Power Supply Installation Schedule Jan Bohm, Prague AS, 4 th November 2005 The SCT Power Supply System will be installed in 22 LV&HV racks situated.
M.N Minard SPD cabling overview SPD cable chain & tray SPD cable chain & tray Motorisation PS/SPD Motorisation PS/SPD Work on PS Work on PS.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
Walls crates cables gas chambers electronics CERN adb.
31 January 2006A.Ciocio - SCTSG1 Type IV cables and PP3 Installation Type IV installation Connector in situ work Status of PP3 Testing.
29 November 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status of Type IV installation Connector in situ work Status of PP3 Testing.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
14 February 2006A.Ciocio - ID Week1 SCT Services Procurement & Installation Type IV PP3 Type II-III and PP1 Fibres Heaters DCS Testing MTF Workpackage.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
25 October 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status & Plan.
ID week - 26 September 2006 A. Ciocio1 SCT Services Installation SCT Cables Web page
Pippa Wells25 October Procurement and manpower for service installation Services readiness dates Planning for type ii/iii Fibre installation dates.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
8 June 2006A.Ciocio - SCTSG1 SCT Services Installation Type IV PP3 Type II-III and PP1 Testing & Installation Plan Workpackage
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
14 December 2005A.Ciocio - SCTSG1 Services and Patchpanels Installation Type IV installation Connector in situ work Status of PP3 Type II/III Testing.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
7 March 2006A.Ciocio - SCTSG1 SCT Services and Patch Panels Type IV PP3 Type II-III and PP1 Fibres Heaters DCS Testing Workpackage
9 May 2006A.Ciocio - SCTSG1 SCT Services Installation Type IV PP3 Type II-III and PP1 Fibre Cables DCS Testing & Installation Plan Workpackage
13 September 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Delivery Installation Connector work Testing Summary.
SCTSG - 17 October 2006 A. Ciocio1 SCT Services Installation Update Recent Full Report: September ID week SCT Cables Web page:
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
25 October 2005A. Ciocio - SCTSG1 Type II/III Cables and PP1 Status & Plan.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
31 January 2006A.Ciocio - SCTSG1 Type ii-iii and PP1 Production Timescale for installation Plan PP1and Testing.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Mauro Citterio - Mi meeting
Service channels between Tracker and PP1
Optoelectronics internal report, 17 August 2007
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
Renovation of the 45-year old PS magnets
Chamber Design and Integration RE3/1 and RE4/1
Nearly the end of a long story...
Radiation Laboratory Meeting
LS1 status 24/03/2014.
Presentation transcript:

8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of doubles harnesses completed (April) –2125 double harnesses (4250 cables) Installation –All racks in US side + 2 USA racks were installed last year by TC Russian teams –Installation resumed at the end of March with a new TC team (French) –Very slow startup, safety issues, wrong usage of labels, mistakes –Completion of USA side was expected by the end of May But <50% done –Russian teams will take over 1-2 racks – expected completion end of June –Need to test last ~200 cables for acceptance –Need to test after installation to be able to cut extra length to liberate floor in USA15 Connector in situ (CPE) –All connectors (2000) in US15 completed on March 10 (a few were left but they are done now) Many racks are tested before and after plug into PS (Petr with Prague team) Very good yield but some rework was necessary One rack needs cables rerouting (cables were cut too long by previous company) –2+1 techs returned on April 18, started 2 USA racks but left again: Need more USA15 rack completed for the full team to operate efficiently –US side was reworked and racks in USA15 will be continued when full team will be back (mid-June) Racks on Level 6 US side

8 June 2006A.Ciocio - SCTSG2 PP3 Remaining units and parts about to be finished and will be sent “soon” Scott will come back (June 13) for 4-6 weeks Much of the installation done but lots of work to complete all racks: –Most of subracks of 30 units installed –Need 7 subracks to complete all installation and “special” subracks –Some subracks sitting by racks to be installed –Small fraction of cables are plugged in Issue with schedule: –Rework for damages, shorts, bad assembly has to happen when needed with technical help available –Problem of not having all the parts in hand because changing of priorities and racks not completed

8 June 2006A.Ciocio - SCTSG3 Type II/III & PP1 – Production INEO/Thurmelec are making type II-III cables in 2 steps: 1.double length harnesses as they receive information about the lengths type II cable and type III spliced type II FCI/JST connectors on both ends of double harness 2.Single length cables with FCT connector (PP3) are produced when length finalized with test cable measurement from cryostat to PP3 racks sector by sector Delivery rate reached 300 cables/week We are ahead with cable preparation! So far good quality No fatal defect found on some cables (the color coat is gone is some section/pattern but kapton insulation OK) Fatal defect (but repairable) found on 2-3 cables ( Only a few cables failed acceptance PPB1 – clamps, clips, cable tray covers were late, not used yet during installation –Clamp mounting started –Clip under production PPF1 – most parts available –Found the best way to crimp group of drain wires in a ferrule and catch the ferrule with the grub screws into clamp’s holes

8 June 2006A.Ciocio - SCTSG4 Type II/III cables – Installation ~ 2300 cables installed ½ bundle /day/side/team 48 cables/day but may reach 100 Old problems: (Details given in April SCTSG) Problem with testing related to the grounding in cryostat (OK) Mechanical problems to fit layers of 6 cables between cover/clamp holder pins (all cables installed have been retrofit) Clamp installation Yield: <1% cables to replace - Mechanical defects - Damage - Failed electrical test

8 June 2006A.Ciocio - SCTSG5 SCT Services Sequence Sector 5 (top) and Sector 13 (bottom) –heater cables, and DCS cables (completed) Sector 9 - Installation completed on May 1 –878 SCT cables (384 Barrel, 494 EC) –18 Fibre cables (EC) Sector 3 - Installation started May 2 – completed last week –583 SCT cables (336 Barrel, 247 EC) –27 Fibre cables (9 EC,18 Barrel) Sector 1 - started in parallel 2 weeks ago – will be completed this week –878 SCT cables (384 Barrel, 494 EC) –18 Fibre cables (Barrel) Sector 7 – first 300 cables arrived – installation in parallel just started –583 SCT cables (336 Barrel, 247 EC) –27 Fibre cables (9 EC,18 Barrel) Sectors 11, 15 – Double harnesses length sent to company to fabricate – single length this week – SCT cables (336 Barrel, 247 EC) – Fibre cables (9 EC,18 Barrel) Installation sequence in a sector is: –Tubes, fibres, heater cables, SCT cables, (Muon chambers), –TRT cables, pixel cables

8 June 2006A.Ciocio - SCTSG6 Schedule Type II-III installation should be completed by mid-July (according to current schedule from TC) Type II-III installationmid-July (Barrel) Type IV installationend of June… Connector in situ/testingend of July PS cratesmid-June (US side) – July (USA side) PP3 assembly, installation end of June All cables plugged into PP3mid-July We need continuous presence of people at CERN at least until mid-July (and later in August) Critical area in the type II-III acceptance, installation and testing SCT participation very valuable to add to people who are resident Our schedule

8 June 2006A.Ciocio - SCTSG7 Plan

8 June 2006A.Ciocio - SCTSG8 Installation & Testing Activities ActivityResidentAdditional Type IV Acceptance test Test in rack after installation Test of cut cables after connector in situ work Tomas (Prague)3 Plug-in cables into PS crates Test with feedtroughPetr (Prague)Prague + 2 Type II-III Preparation Acceptance test (partial) Visual inspection Folding the shield and cut it the right amount, fix it Organize boxes with right cables to send for installation Jessica (UCSC) Kuo-Ming (Sinica) 4 Type II-III Installation Mount dPPB1 and dPPF1 (Barrel) Squeezing the cables to fit between pin and clamp holder Plug-in of the delicate JST/FCI connectors to dPPB1 Placing the clamp (now), placing the clip (later) (ENDCAP) crimp group of drain wires in a ferrule and catch the ferrule with the grub screws into clamp’s holes Plug in the dPPF1 Jacek (Crakow)1 Type II-III TestingAlexandre (Dubna)3 PP3 Burn-in of units Assembly into subracks Installation into racks of subracks Plug-in the cables to PP3 Scott (Melbourne)1 Test of whole chain2

8 June 2006A.Ciocio - SCTSG9 Issues PP3 –Help is coming next week but continues to be difficult to keep up with technical problems and missing subracks Connector damage –In US15 they are left too long on the floor –Other cables installation interference Tester –Different flavor that work with different configuration of cable chain –Multiple laptops failure (~ok now) Spares installation for type II-III cables –2 spare type ii-iii EC cables installed but too short – needed splicing extension of type III –We don’t have spares of every flavor – need rework to get the right one in place Defective dPPF1 –Some faulty cables were actually due to a bad channel on dPPF1 – missing some dPPF1 Type III installation & testing –Difficult conditions for testing –Extra length to reroute on additional trays –Dedicated team (Russian) available to plug-in but need assistance (and all cables tested) Type IV installation –Very inefficient and need extra interaction with new team –Interference with type II-III installation Connector in situ –With the current rate of type IV installation difficult to keep schedule as planned –The very first rack has 200 cables to reroute under the rack to absorb the extra length More HELP for the following weeks