PIP Update June 18 th 2014. Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.

Slides:



Advertisements
Similar presentations
PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
Advertisements

Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
PIP Update July Agenda Summary Update – Budget/RLS – Current Activities – Upcoming Activities/ Changes Update Slides High-Power Ferrite TestingDennis.
PIP Update June 26 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
PIP Update Aug 15 th Agenda Summary Update – Current Activities Dennis Barak / Kiyomi Seiya - High-Power Ferrite Testing Ryan Crawford - Linac and.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
PIP Update Aug 22 th Agenda Summary Update – Current Activities Updates/Talks: – Elmie Peoples-Evans - Schedule Reports – Rene Padilla - Booster.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Proton Improvement Plan (FY13 PMG Q4). William Pellico, Fermilab PMG, Nov PIP FY13 Q4 Summary Task Highlights Budget and Labor Review Summary.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Proton Improvement Plan (FY13 PMG Q1). William Pellico, Fermilab PMG, January FY13 Summary Q1 Task Summary – Highlights RFQ Injector Budget.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
PIP Update Feb 11 th Agenda Summary Update – Current Activities – Updates (Tom Kubicki) – Additional Meetings/Notes.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
Proton Improvement Plan Bob Zwaska July 7, 2014 All-Experimenters Meeting.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
PIP FY14 PMG W. Pellico 7/8/14 7/8/2014PIP PMG. PIP Activities RIL & Linac – 200MHz RF Power System High Level RF Linac Modulator 7835 Procurement – Accelerator.
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
PIP PMG Project Controls Elmie Evans-Peoples PIP PMG Oct 25, 2012.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
PIP Update Sept. 18 th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Pat.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
PIP Update Oct Agenda Summary Update – Current Activities Updates/Talks: Dave Johnson – Linac Notching (laser)
PIP FY15 PMG W. Pellico PIP PMG March 5 th PIP FY15 Year to Date Outline –FY15 activities PIP quarterly milestones Linac Booster Project Controls.
Refurbished Booster RF John Reid October 24, 2012.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
PIP FY15 Q4 Report W. Pellico PIP PMG November 5 th 2015.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Accelerator Status and Plans
Proton Improvement Plan Overview Bob Webber July 13, 2011.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
Proton Improvement Plan (FY13 PMG Q3). William Pellico, Fermilab PMG, Aug PIP FY13 Q3 Summary Task Highlights Budget and Labor Review Summary.
PIP Wednesday March 21, /21/12 Agenda Project Update(s) Pellico - PIP Status Talk(s) 1.Ryan Crawford: Linac Power Distribution - Shutdown 2012 activities.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
Proton Improvement Plan (PIP) William Pellico Fermilab Annual Science and Technology Review September 5-7, 2012.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
PIP Update Dec 17 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
PIP Update Jan. 16 th Agenda Summary Update – Current Activities/Updates – Shutdown ScheduleHighlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
PIP Update August 12 th Agenda Summary Update Current Activities Update – Ryan Crawford - Booster Anode Power Supplies – Dave Johnson - Laser Notcher.
PAC Meeting, December 12, Prebys 1 The Problem.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
PIP Update May 28 th Agenda Summary Update – Current Activities/Updates – Ken Domann.
PIP Update Sept Agenda Summary Update – Current Activities Updates/Talks: Ken Domann - Schedule Update and Statusing Ryan Crawford - Linac MCC/Transformer,
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Presentation transcript:

PIP Update June 18 th 2014

Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh

Update – Linac SBK: Working on gallery and working towards CDR (in June, July) – Linac LN: Work continues on optical cavity/vacuum chamber, understand the non-linear instability seen in the fiber amplifier, working with PriTel on a solution – Modulator work: Build up of 25 cell – (still communicating with SLAC – finishing up some details), Issue with cap from pulsing/testing – Linac Beam Physics: No news – Injector: Testing larger volume source in test stand, Gas Testing and notch in cathode did show improvement in flatness can be obtained – Booster Beam: Transverse damper – still need to change ACNET software for ease of use and Cogging software work continues – have been able to run on new system but working on transition – Kiyomi at IPAC Booster optics software – New tune control works (problem in database fixed) moving on to higher intensities Booster Longitudinal dampers - – Booster RF Booster RF5 has had downstream window cut off… (update talk today) RF13 – Is finishing mill work today then start re-assemble (update talk today) Perpendicular Cavities –proceeding with testing of new ferrites – waiting for delivery Built the first new tuner – will go on RF13 Cavity 20 – no longer going to have new tuner, (update talk today) Booster Anode Supplies – Talk next week, but several pieces still have no vendor or delivery date Booster Bias supplies – Third supply delivered to MI-60 and starting dis-assembly work (Monday), Bias 1 in test stand, Bias 2 waiting TS – Booster Shielding – Safety Going over data…. – Booster BPM work – 1. made measurements at BPM H1 and saw reflections which are caused by the ion clearing box, instead of the doublet you are getting multiple waveforms out of the BPM. 2. working on identifying what elements of the bpm measurements are beam driven and what is imposed by the bpm system on the measurements. The impact of this is how the basic measurements can be modified or met by the future bpm system. 3. continued design of transition board, have a 201MHz and a MHz signal path 4. preparing presentation for June 25th Booster Nothcer – Pulsing long kicker in tunnel (on floor) on new system Getting running time in on new system – did have a problem with supply but is fixed now Like to connect three loads in gallery to ensure it can work for 700 MeV notching Working on modifications to Short 12 spool piece and secondary absorber (reduce loses on surface)

Cavities Refurbishment – 10 of 19 cavities have been refurbished Cavity RF 2 being rebuilt (fixed window) Cavity RF 5 (Replacing taper/window) RF 5 removed for repair

Recent PIP Budget/News Budget Issues: – Submitted labor request for FY15 yesterday (will need re-work!) General: P5 report out – PIP II is the plan – Setting up meeting to discuss transition PIP to PIP II PMG – Paul Derwent is setting up for Sergei Lots of shutdown talk – Regular SD planning Update of RLS – Some Booster items remain Director is interested in 20 Hz – Todd gave talk at PIP II Post-Doc position for PIP – Two candidates being considered

Upcoming Talks Future Meetings to be Scheduled: Peter/Craig – New Booster BPM Plan Ryan Crawford – Anode Supply Update Matt/John – New Tuner Kiyomi Seiya - Cogging Tom Kubicki – New Booster Cavity Plan Bill Pellico - Loss Scans and Shielding Assessment John Reid - Solid State Installation - Final Report