5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.

Slides:



Advertisements
Similar presentations
Status of PMD DCS. PMD Layout Unit Module Super Module Converter + Support Plate Total channels Preshower+Veto = 221,184 8 Supermodules in 2 planes 48.
Advertisements

S.PopescuAlice DCS workshop, Colmar, OPCs latest news Iseg OPC server Wiener OPC server.
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
PVSS and JCOP Framework Organization, Support & News Oliver Holme IT-CO.
S.PopescuAlice DCS workshop, Colmar, Follow-up from the last DCS workshop Answers and recommendations.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Slide 118 th DCS Workshop – March, 6Francesca Poggio ZDC DCS Status Report answers to DCS commissioning meeting Francesca Poggio Università degli Studi.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
19/05/10FV 1 HyTec crate – DCS integration issues.
Systec CAN-USB Box ― Overview and Status JCOP Team Meeting 2 November 2006 Beat Jost/Cern-PH.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
DCS Software Installation computing, network, software guidelines, procedures Peter Rosinsky, Peter Chochula, ACC team ALICE DCS Workshop, CERN, 5-6 March.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD.
ALICE DCS Workshop 9 October 2006 ALICE DCS Workshop 9 October 2006 Michele NITTI.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
Institute of Nuclear Physics Polish Academy of Sciences
JCOP Workshop November 2015
ISEG Users meeting Mateusz Lechman 20/07/2010.
TPC Detector Control System
Presentation transcript:

5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control

5th March 0718th DCS Workshop2 Overview  Iseg OPC  Iseg Fw Component  Wiener OPC (VME Crate & PL512)  Wiener Fw Component  Wiener VME Crate FSM  Reference System

5th March 0718th DCS Workshop3 ISEG OPC  Recommended Version OPC downloadable from the DCS webpage  ACC is coordinating the Future Version : - Proposal being agreed - Main Improvement : Unification of the Namespace (old and new modules)  Target Date ~ End April / May

5th March 0718th DCS Workshop4 ISEG OPC  Up to 1 full crate using Peak USB adaptor -> Trouble due to adaptor band width.  Solution : Peak PCI card, use multiple adaptors.  On going work : Adapt OPC to another CAN / USB Interface : Systec (large band width) ??

5th March 0718th DCS Workshop5 Fw ISEG  New Iseg Framework > Compatible with OPC > Compatible with PVSS 3.6 -> All modules types supported -> Include Iseg Objects Library

5th March 0718th DCS Workshop6 ISEG Objects Library  Example TRD 3 crates, 24 modules, 192 channels monitored thanks to the Iseg Objects Library

5th March 0718th DCS Workshop7 ISEG Objects Library  Example Reference System (PVSS 3.6)

5th March 0718th DCS Workshop8 Wiener OPC (LV)  Recommended Version : Wiener OPC  Waiting for Ramping Item and “Behaviour” Items -> Included in the next release (~ 2 weeks ??)

5th March 0718th DCS Workshop9 Wiener OPC (VME)  VME Crate (CAN bus) -> Recommended version 1.8 -> For any configuration problems please contact me -> Check Firmware Version : 2.16 Later…global reunification (All Wiener devices)

5th March 0718th DCS Workshop10 Fw Wiener  Fw Wiener > Included in the Framework (PVSS 3.6)

5th March 0718th DCS Workshop11 VME Crate FSM  Simple Action on the Crate ON OFF NO_CONTROLPWS_FAILURE Switch_OffSwitch_On Reset

5th March 0718th DCS Workshop12 VME Crate FSM  1 LU VME Crate  2 Device Units : Crate & CANbus Crate is OnCrate is Off Crate is in Local Mode CANbus is broken Crate is in Error If you need the full project (OPC, PVSS Client, FSM, Monitoring), contact me !

5th March 0718th DCS Workshop13 Reference System The RACK is complete and now available for your tests, debugging… CAEN ISEG Wiener PL512 Wiener VME Crate ELMB Systec Peak,… DCS Lab, building 13

5th March 0718th DCS Workshop14 Reference System  PVSS 3.6 projects are running with the latest OPC / Framework versions and Alice standard user interface

5th March 0718th DCS Workshop15 Thanks for your attention  Any problems to report concerning Wiener / Iseg Control, please contact me Need to download a software :