Accelerator/program Mats Lindroos Head of accelerator www.europeanspallationsource.se April 21, 2015.

Slides:



Advertisements
Similar presentations
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
Advertisements

Nine months at the European Spallation Source, Lund, Sweden
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois Lehman Review Feb Joint NASA/DoE review My understanding: –“The purpose of the.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Lali Tchelidze Safety work package leader
ESS Update and Meeting Goals
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities CD-2 Planning May 8, 2007.
ICEE 2004 Florida Co-Chairs Tim Anderson & Marc Hoit.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Managing Accelerator Quality Matthew Conlon 13 April 2015.
Dunstaffnage Marine Laboratory Oban, Argyll, Scotland PA37 1QA ECASA Kick-off Oban 8-9, December 2004.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
Proposal for HCP2009 for Brookhaven National Laboratory Sally Dawson Howard Gordon.
MSc projects 2014 Brief update session Mike Spann.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Advanced School on Laser Applications at Accelerators From 28 th September to 3 rd October 2014 Hospedería Fonseca, Salamanca (SPAIN) This project has.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
OFFICE OF SCIENCE 1 Closeout Report on the DOE/SC CD-3b Review of the Utilities Upgrade Project (UUP) Fermi National Accelerator Laboratory August 11-12,
Project Planning Update 13th Technical Board Meeting Luisella Lari Head planner for Accelerator & Senior Scientist May.
ESS – Enabling discovery Mats Lindroos Head of Accelerator Lund October 2014.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
H. Danared | Cryomodule Workshop | Page 1 The In-Kind Process at ESS Håkan Danared Lund, 15 October 2014.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
European Spallation Source Science Advisory Committee February 5-6, 2014 Jim Yeck CEO & Director General.
Welcome Mats Lindroos Head of the ESS Accelerator Division EPG 5/12/2011.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
LCLS II FNAL Niobium Pre- Procurement Review - Overview Camille M. Ginsburg, FNAL April 17, 2014.
In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
ESS Accelerator| Construction Phase| | MC | 1 ESS Accelerator management & governance for Product Integration - Construction phase 25 January 2013.
H. Danared | Collaboration Board, March 2014 | Page 1 Status of In-Kind Contributions to Accelerator Håkan Danared Kastrup, 14 April 2014.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Executive Session Director’s Conceptual Design Review of Mu2e Project May 3-5, 2011 Jim Yeck.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
OFFICE OF SCIENCE DOE/SC CD-3c Review of the Muon to Electron Conversion Experiment (Mu2e) Project Fermi National Accelerator Laboratory June 14-16, 2016.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Operation SE view point Romuald Duperrier ESS SE manager.
ESS licensing process and Readiness Reviews
LCLS Linac Technical Design Review Charge
Regulatory Cooperation Forum (RCF) - Plenary 2018
RF systems introduction
Ciprian Plostinar Workshop on Testing and Commissioning
Bunker Internal Review Welcome & Charge
Welcome and charge to the committee
Introduction CDR Normal Conducting Linac LLRF
CERN Brief Update – April 2019
Review of TDR Chapter 9 “Transition to Operations”
European Spallation Source ERIC
High Level Readiness Reviews
RF introduction Anders Sunesson RF group leader
Charge and Agenda of the 18th TAC meeting
Bunker Critical Design Review Welcome & Charge
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Accelerator Installation Schedule
SAR MEBT Bilbao March Mats Lindroos
Project Support Meeting January 9, 2019
Presentation transcript:

Accelerator/program Mats Lindroos Head of accelerator April 21, 2015

Charge accelerator and dates Background: The 1 st Annual Project Review was conducted in November 2013 and a follow up assessment in May These reviews focussed on readiness for construction. The primary focus of the 2 nd Annual Project Review will assess general progress with increased emphasis on the project schedule. We been advised to invite (main) in-kind contributors and demonstrate technical progress. Dates: April Committee Charge 1.1Is the scope of work adequately defined and do plans include activities necessary to deliver the facility, including a reasonable breakdown of requirements and provision for design reviews and verification activities? 1.2Is the schedule consistent with the major construction project delivery dates* and are the assumptions used for the schedule complete and reasonable? 1.3Are in-kind deliverables and procurement contracts, including long lead items and procurements requiring R&D, properly identified and sufficiently planned and managed? 1.4Is the transition from the Construction Phase into the Initial Operations Phase clearly and appropriately defined? 1.5Are the risks and risk responses relevant and complete? 1.6Does the organization match the needs of the construction project? Is the current staffing level and competencies appropriate to support the construction project? 1.7Identify major issues that must be addressed in order to successfully deliver ESS and take the facility into operation. 2

Proposed reviewers 3

Review schedule (1/2) Tuesday, April 21, 2015 – Auditorium, Medicon Village 8:00Bus from Hotel Planetstaden to Medicon Village 8:30Committee Executive SessionReview Committee Chair 9:15 Welcome and ESS Overview and Status (25+15)J. Yeck 9:55Science Objectives (15+10)D. Argyriou 10:20Break 10:40Facility Performance Objectives (15+10)R. Garoby 11:10 Accelerator System (20+10)M. Lindroos 11:40 Target System (20+10)J. Haines 12:10 Integrated Control System (15+10)G. Trahern 12:35Lunch 13:30Neutron Scattering System (20+10)O. Kirstein 14:00 Conventional Facilities (15+10)K. Hedin 14:25Project Support & Administration (15+10).T. Welander 14:50Cost, Schedule and In-Kind Management (20+10)J. Brisfors 15:20ES&H and QA (15+10)P.Jacobsson Break 16:15Initial Operations (20+10)P. Carlsson 16:45Conclusion of Plenary Presentations 17:00 Committee Executive SessionReview Committee Chair 18:30Bus to Restaurant 19:00 Reception and Dinner 4

Review schedule (2/2) Wednesday, April 22, Conference rooms according to detailed schedule, ESS 8:10Bus from Hotel Planetstaden to ESS 8:30Parallel Subcommittee Presentations/Discussions 12:15Lunch 13:15Parallel Subcommittee Presentations/Discussions 15:00 Tour to Construction SiteK. Hedin 16:00Review Committee Executive Session - Tänkartanken, 1st floor Thursday, April 23, Conference rooms according to detailed schedule, ESS 8:10Bus from Hotel Planetstaden to ESS 8:30Parallel Subcommittee Presentation/Discussions 12:15Lunch 13:15Parallel Subcommittee Presentations/Discussions 15:00 Subcommittee Working Sessions 16:00Review Committee Executive Session - Tänkartanken, 1st floor Friday, April 24, Auditorium, Medicon Village 8:10Bus from Hotel Planetstaden to ESS 8:30 Review Committee Executive Session - Auditorium, Medicon Village 10:30Dry Run of Closeout Briefing 11:30CloseoutAuditorium, Medicon Village 12:30Adjourn and/or Lunch 12: Transport to Copenhagen Airport/Lund Central station/Hotel Planetstaden 5

Break-out 22/ – 8.30: Intro, staffing, schedule and risk, Mats/John, – 9.00: Integration, Dave, – 9.30: In-Kind, Håkan, – 10.30: Coffee – 11.00: Safety, Lali Tchelidze, – 11:30 Transition to initial operation, Mamad Eshraqi, 10+5 – 11:45: Schedule, planning and procurement, Luisella Lari, 10+5 – 12:00: QA/QC (including review plans), Matthew Conlon, :15-14:30 – 13.15: RF systems, Anders Sunesson, – 13.45: Beam instrumentation, Andreas Jansson, – 14.15: Specialized Technical Services, John Weisend, – 14: : Visit to accelerator site 6

Break-out 23/ – 8.30: Requirements, Plant layout and installation, Eugene/Steven M/David M – 9.30: Coffee – 10.00: Ion source and LEBT, Santo Gammino, 15+5 – 10:20: MEBT, Ibon Dustinbuy, 15+5 – 10:40: RFQ, Bruno Potain, 15+5 – 11:00: DTL, Andrea Pisent, 15+5 – 11:20: Spoke, Sebastien Bousson, 15+5 – 11:40: Elliptical CM, Pierre Bosland, :15-14:30 – 13.15: Elliptical cavities, INFN/STFC, 15+5 – 13.35: Beam distribution, Søren Pape-Møller, 15+5 – 14:00: Visit to LTH RF and modulator labs 7

Internal timeline 8 Short time and a lot to do!