Designing Zero-Waste Resource Recovery Parks Daniel Knapp, Ph.D. GRRN Zero-Waste Conference, Ft. Devens, MA October 2009.

Slides:



Advertisements
Similar presentations
Ft. Lauderdale Region Counties: Broward.
Advertisements

Funding Opportunities for CFP Projects San Francisco Bay Area Parks and Devils Postpile NM Climate Friendly Parks Workshop Jack Williams, P. E. Chief Park.
Mining the URBAN ORE A 30-year Saga Joe Werth Manager, Outside Trader Department Zero Waste International Alliance October 29, 2010.
Sustainability In Flight
City of Petaluma Fire Station/ Headquarters Building August 30, 2006 Workshop.
NEW RULES FOR THE PROPER HANDLING OF COMMUNITY DISCARDS Making your Waste a Resource for the 21st Century: Resource Recovery Parks and Food Scrap Composting.
Achieving Sustainable Design with Automated Parking
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
LANGDON LIBRARY ~ FROM 1892 TO THE 21 ST CENTURY.
2008 Goal New Goloka Dhama Dimmocks Mill Road, Hillsborough, NC, To build a nice temple facilities for Sri Sri Radha Golokananda Ji in Hillsborough,
Reuse as an ECONOMIC DRIVER In Hub and Spoke Recycling Daniel Knapp, Ph.D. President, General Manager June 22, 2010.
Institutional Services Human Resources Facilities Maintenance Custodian Services Security Construction Wilmington Campus North Campus.
1 UPMC High Point Lookout Tirzah DeCaria Jose FrechSakshi Ganesh Melissa Lee Bhushan SuryavanshiHuimin Tan.
Sustain and Gain in Peoria: Actions and Results Sustainable Cities Network October 20, 2010.
Building Description Wayne Foss, MBA, MAI Wayne Foss Appraisals, Inc.
Chapter 16 Designing Homes for Today’s Needs Housing & Design Winter 2013.
Tour Stop 1: Outside The Building. Community Connectivity Encourages A Walkable Neighborhood At least 10 community services, and high density residential.
BECOMING GREEN Santa Margarita High School Academic Building.
Sustainable solutions to large scale architecture, urban planning and design
Houston Independent School District John F. Kennedy Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS The John F. Kennedy Elementary School is a replacement.
Fullerton College Physical Education Project Community Meeting March 11, 2009.
Kären Haley Director, Office of Sustainability City of Indianapolis Great Lakes Regional Pollution Prevention Roundtable/ Region 7 Conference June 4, 2009.
Working Toward a Sustainable Manhattan Beach July 20, 2011 Livable Communities Working Group.
October 2009 Rethink Conference 2009: Student Life and Learning Morton J. Mendelson Deputy Provost (Student Life & Learning)
Sustainable Design in a Practical World Brian Paul Dougherty, FAIA DOUGHERTY + DOUGHERTY ARCHITECTS LLP presented by:
City of Alexandria Planning Commission October 4, 2011 ASA Expansion DSUP
City of Brisbane Open Space & Ecology Committee April 27, 2006 Baylands EIR Scoping.
Master Plan SODERSTROM ARCHITECTS Site Aerial Grade School High School Middle School Athletics Multi-Purpose.
Facility Design. Overall Design Process Planning committee Needs assessment Select construction process model Select architect Develop schematics Secure.
Albemarle County Public Schools Design for Vehicle Maintenance Facility Improvements September 10, 2009 R A N C O R N W I L D M A N A r c h i t e c t s.
NEW RULES NEEDED TO GET TO ZERO WASTE R.V. Anthony Richard Anthony Associates, San Diego, California GRRN Recycling and Zero Waste Conference Devens, Massachusetts.
Peter Lowitt Devens Enterprise Commission. Green Infrastructure Policy in the Development of Devens Regional Enterprise Zone Peter Lowitt, FAICP Director:
Planet, People, Profit: Business As Usual Mary Lou Van Deventer Operations Manager GRRN Zero-Waste Conference, Devens, MA October 2009.
Solar Panels are Solar power is the conversion of sunlight into electricity.
NORTHERN NEW MEXICO COLLEGE SERPA Solar Energy Research Park and Academy Summary: Approx 9,800sf classroom and laboratory building All new construction,
THIS IS Created by: Chad Sims Jason Sells Green Building Materials Sustainable Design Systems LEED Categories
Recycle on The Go at Special Events Recycling and Waste Management at Special Events February 1, 2007.
Replace with appropriate image in View > Master. Blatchford Redevelopment.
Mooresville Consolidated School Corporation School Board Presentation Central Office Renovation April 11, 2011 Administration Center Renovation Franklin.
Center Update Eileen Peppard Center for Smart Building and Community Design.
Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
Industry Park & Ride Project Update. Industry Park & Ride Construction completed on time and under budget Parking structure opened to public on October.
Ch 14.2 Land Page Urban Land Use Urbanization = the movement of people from rural areas to cities Better paying jobs Plentiful jobs.
Sustainable Cities. If our cities in the future are to be pleasant and safe place to live we need to solve problems like … Traffic Pollution Use of derelict.
UCSD Student Center: The Center of a Green Campus ENVS 664 Ta-You Huang Oct 16 th, 2012.
Resource Development Lands The Future of Zero Waste Mary Lou Van Deventer Operations Manager Bay Area Industrial Roundtable & ABAG May 8, 2008.
Introduction to URBAN ORE Daniel Knapp, Ph.D. President, General Manager June 23, 2010.
RESOURCE REDEVELOPMENT: Second-Generation Transfer Stations Daniel Knapp, Ph.D. For the GRRN Zero Waste National Zero Waste Action Conference JULY 30,
A Prefabricated Framing and Enclosure System. The Problem.
Issues on the Horizon in Green Building For NCSU’s Campus Environmental Sustainability Team August 3, 2010 Traci Rose Rider, PhD, LEED AP BD+C ProcessTargets.
Deerfield Elementary School Deerfield Elementary Overview of Deerfield Renovation October 8, 2015.
Twelve West By Henry Thomas. General Information Portland, Oregon.
The MIT The MIT learning from the built environment.
City of Peachtree Corners Facility Options. Assumptions City will need physical space to conduct business Council Meetings Boards and Commissions Daily.
Hillsborough Building & Planning. Green Building 101  Efficiency of buildings and responsible use of water, and construction materials  Reducing building.
15. Canada’s Booming Urban Centres After World War II, many couples were reunited and decided to start families At the same time, the use of automobiles.
3225 ADELINE STREET, BERKELEY MIXED-USE BUILDING TEAM: JASON MOCHIZUKI, SAFEI GU, FEI ZHAO.
City Council March 4, Capital Improvement Plan 1/14/2014Budget staff sent CIP forms and instructions to divisions 1/28/2014Projects submitted.
Project Overview BCTC, Newtown Pike Campus Classroom Building May 13, 2010.
SAN FRANCISCO INTERNATIONAL AIRPORT CONSOLIDATED ADMINISTRATION CAMPUS SFAC Civic Design Review – Informational Overview February 8, 2016.
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
City Council April 1, Capital Improvement Plan 1/14/2014Budget staff sent CIP forms and instructions to divisions 1/28/2014Projects submitted.
City Council Meeting – January 10, 2007 Rezoning Application No Salters Creek Material Recovery Facility.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
City Council March 6, Capital Outlay Priorities Infrastructure  Reconstruction of Bell St. from Concho River to Old Ballinger Hwy  Reconstruction.
Where is the Greenwich Peninsula?
Crescent City Harbor District Solar Project Proposal
Circular Economy Development in China
Special Valuation The Masonic Temple 1110 West Riverside Avenue
Presentation transcript:

Designing Zero-Waste Resource Recovery Parks Daniel Knapp, Ph.D. GRRN Zero-Waste Conference, Ft. Devens, MA October 2009

We Want You

There Are Transfer Stations and Transfer Stations

Universe of Total Recycling

Replacing Yesterday ’ s Wasting and Recycling MRF with Tomorrow ’ s Zero-Waste Resource Park

Protected creek area – create bioremediation, nature trails, & picnic areas City vehicle parking and maintenance area Future Expansion Staff break room Bioswale remediation pond Transfer Station 1 story, 85,000 sf Office/Education/Public 2 story, +/- 15,000 sf Recycling Redesign Uses Same Footprint

Redesign Uses Space Intensively and Flexibly

Traffic and Materials Flow Are Simpler

Construction Phasing Allows Uninterrupted Operation ©2006 URBAN ORE ®

Seminars Roof Deck Offices Greenhouse Living Machine Waste Processing Offices Greenhouse Roof Plan Second FloorGround Floor 3-Level Solar-Heated Offices Provide Community and Staff Amenities ©2006 URBAN ORE ®

Solar Roofs Provide Power

Solar Greenhouse Heats Offices

Living Roof Provides Functional Amenity

Zero Waste Transfer Station from the Southwest

Multiple Bays Provide Convenient, Specialized Unloading for More Customers

Airport-Style Unloading is Familiar and Fast

Eliminating Columns Maximizes Usable Space and Operational Flexibility SKYLIGHTS FOR NATURAL LIGHT AND REDUCED ENERGY USE

Elevated Picking Line Can Be Adapted to Changing Needs Visitors’ walkway

Public Face Is Attractive

Designing from Scratch: Del Norte Transfer Station and Resource Recovery Park Daniel Knapp, Ph.D. Mark Gorrell, Architect

Design Affinity Groups - Reuse, Recycle, and Rock&Soil

Rural

Phased Development

The End 900 Murray St. Berkeley, CA phone SAVE Daniel Knapp, Ph.D. General Manager Mark Gorrell, Architect 800 Mendocino Ave. Berkeley, CA