1 Summary of issues and results from GSC-12 IPR WG Dan Bart, TIA Chair IPR WG SOURCE:Dan Bart, IPR WG Chair TITLE:Report of GSC-12 IPR WG AGENDA ITEM:Closing.

Slides:



Advertisements
Similar presentations
GSC: Standardization Advancing Global Communications Overview of the TSB Director s Ad Hoc Group on IPR by Masamichi Niiya Telecommunication Standardization.
Advertisements

DOCUMENT #:GSC15-CL-06 FOR:Presentation SOURCE:Admin WG Chair AGENDA ITEM:Closing; 2.5 CONTACT(S):Jim MacFie
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Admin Working Group Report to Closing Plenary Jim MacFie, Chair Steve Barclay, Vice Chair Document.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Summary of GSC-16 IPR WG Meeting Michael Eisen WG Chair Document No: GSC16-CL-06 Source: IPR WG Chair.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC-16 Closing Plenary Summary Report Jim MacFie, Chair Ed Juskevicius, Rapporteur Document No: GSC16-CL-39r1.
Jeju, 13 – 16 May 2013TBD Summary of GSC-17 IPR WG Meeting Dirk Weiler, Chair, IPR WG Session Document No: GSC17-CL-06 Source: Dirk Weiler Contact: ETSI.
SDO and Patent Offices : EPO view on cooperation Dr Michel Goudelis, Director Telecommunications, EPO GSC-15, August 2010 Beijing, China.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All 2011 IN REVIEW: ITU’S ACTIVITIES IN THE FIELD OF STANDARDIZATION & IPR Antoine Dore, Senior Legal.
GSC: Standardization Advancing Global Communications 1 Summary of issues and results from GSC-11 IPR WG Dan Bart, TIA Chair IPR WG SOURCE:Dan Bart, IPR.
Global Standards Collaboration (GSC) GSC-15
TIA Report on Global Standards Collaboration 11 Meeting (GSC-11) Telecommunications Industry Association Dan Bart.
DOCUMENT #:GSC15-IPR-02 FOR:Presentation SOURCE:ETSI AGENDA ITEM:4 CONTACT(S):Erik Jansen, ETSI Legal Director Activities/Developments related to the ETSI.
Summary of GSC-15 IPR WG Meeting Alan Fan Zhiyong IPR WG Chair DOCUMENT #:GSC15-CL-05 FOR:Presentation SOURCE:Alan Fan Zhiyong, IPR WG Chairperson AGENDA.
DOCUMENT #:GSC15-CL-04 FOR:Presentation SOURCE:CCSA AGENDA ITEM:Closing Plenary, 2.3 GTSC-8 Summary Report Duo Liu GTSC-8.
TIA REPORT “From Sydney to Ottawa” GSC 8 Dan Bart, TIA.
1 "Update on TIA IPR Standing Committee Work since GSC-12" Dan Bart GSC-13 IPR WG Agenda Item 4 TIA DOCUMENT #:GSC13-IPR-13 FOR:Presentation SOURCE:TIA.
GSC-19 Meeting, July 2015, Geneva GSC-18 Summary Report Dirk Weiler, ETSI Document No:GSC-19_002 Source:GSC-18 Chair Contact:Dirk Weiler Agenda Item:1.4.
Jeju, 13 – 16 May 2013Standards for Shared ICT Patent Offices and SDOs cooperation development Dr Michel Goudelis, Director Telecommunications, EPO Document.
GSC-8xxx SOURCE:TIA TITLE:IPR Working Group Report AGENDA ITEM:Closing Plenary Agenda Item 1.1 DECISION DISCUSSIONX INFORMATIONX 21/10/2015 Report on the.
TSB 1 Overview of TSB Director’s Ad Hoc Group on IPR GSC 8, Ottawa, Canada, 27 April – 1 May 2003 by Houlin Zhao Director, Telecommunication Standardization.
Report of Closing Plenary Shuichi Matsumoto (GSC Chair) Rapporteurs: Nicole Butler & Julian Pritchard SOURCE:GSC Chair TITLE:Report of Closing Plenary.
Overview of the TSB Director ’ s Ad Hoc Group on IPR Telecommunication Standardization Bureau (TSB) International Telecommunication Union Place des Nations.
International Telecommunication Union ITU Workshop on Standards and Intellectual Property Rights (IPR) Issues Yukio Hiramatsu Chairman, TTC IPR Committee.
SDOs and Patent Offices : Towards a better interface Dr Michel Goudelis, Director Telecommunications, EPO GSC-14, July 2009 Geneva, Switserland.
Fostering worldwide interoperabilityGeneva, July 2009 Summary of GSC-14 IPR WG Meeting Antoine Dore, ITU IPR WG Chair Global Standards Collaboration.
Fostering worldwide interoperabilityGeneva, July 2009 GSC-14 Closing Plenary Summary Report Malcolm Johnson, GSC-14 Chair Global Standards Collaboration.
1 DOCUMENT #:GSC15-CL-39 FOR:Presentation SOURCE:CCSA AGENDA ITEM: 7 GSC-15 Closing Plenary Summary Report Leping Wei, GSC-15.
Geneva, October 9, 2012 Summary of GSC-16bis IPR WG Meeting Greg Ratta, ITU IPR WG Rapporteur Document No: GSC-16bis-IPR-12 Source: IPR WG Rapporteur Contact:
TIA IPR Standing Committee Report to TIA Technical Committee “Normative References and IPR” October 21, 2005 Paul Vishny, Chair Dan Bart, TIA.
03/03/2016 Report from GA ad hoc group on ETSI’s IPR Policy operation Karl Heinz Rosenbrock ETSI Director-General 1GSC-9, Seoul SOURCE:ETSI TITLE:Report.
Jeju, 13 – 16 May 2013Standards for Shared ICT Kengo Nagata TTC IPR Committee Document No: GSC17-IPR-03 Source: TTC Contact: Kengo Nagata GSC Session:
Summary of GSC-13 IPR WG Meeting Tom Goode, ATIS IPR WG Chair DOCUMENT #:GSC13-CL-05r1 FOR:Presentation SOURCE:Tom Goode, IPR WG Chair AGENDA ITEM:3.4.
International Telecommunication Union New Delhi, India, December 2011 ITU Workshop on Standards and Intellectual Property Rights (IPR) Issues Antoine.
Jeju, 13 – 16 May 2013Standards for Shared ICT GSC Emergency Communications Task Force Report (GSC-EM TF) Presenter: Chantal Bonardi GSC-EM Task Force.
GSC-16 Closing Plenary Summary Report
GSC-14 Closing Plenary Summary Report
Summary of issues and results from GSC-12 IPR WG
Global Standards Collaboration (GSC) GSC-15
SDOs and Patent Offices : Interface improvement
TTC Activities on IPR in Standards
GSC-15 Closing Plenary Summary Report
Amy Marasco, Incoming Vice Chair, ANSI IPRPC
HIS Smart Grid – Summary (1)
Glenn Parsons, GTSC-9 Chair, ISACC
GSC-17 Closing Plenary Summary Report
SDOs and Patent Offices : Interface improvement
Opening session report
GSC-17 Closing Plenary Summary Report
Patent Offices and SDOs : Better synergy of the two systems
Summary of GSC-16bis IPR WG Meeting
Summary of GSC-16 IPR WG Meeting
Standards for Shared ICT
S. Joe Bhatia ANSI President and CEO Dan Bart Chairman, ANSI IPRPC
GSC-16 Closing Plenary Summary Report
Summary of GSC-15 IPR WG Meeting
Admin Working Group Report to Closing Plenary
Earl Nied Vice Chair, ANSI IPRPC
GSC-15 Closing Plenary Summary Report
Opening session report
Report of Opening Plenary
Overview of the TSB Director’s Ad Hoc Group on IPR
Review of GSC-10 IPR WG 45 attendees
Nobuo Fujii (GTSC Chair) Rapporteur: Nicole Butler
Summary of GSC-13 IPR WG Meeting
Glenn Parsons, GTSC-9 Chair, ISACC
Admin Working Group Report to Closing Plenary
GSC-15 Closing Plenary Summary Report
Wayne Zeuch, GTSC-6 Chair Nicole Butler, ATIS Staff
Report of GSC-12 Opening Plenary
GSC-15 Closing Plenary Summary Report
Presentation transcript:

1 Summary of issues and results from GSC-12 IPR WG Dan Bart, TIA Chair IPR WG SOURCE:Dan Bart, IPR WG Chair TITLE:Report of GSC-12 IPR WG AGENDA ITEM:Closing Plenary 7 gsc12_ipr_15R1 gsc12_closing_08R1

2 Meeting overview 37 attendees 14 input documents (plus some revisions) presented and discussed Subjects discussed: –Report from GSC-11 IPRWG and Resolutions (Cont. 7 and 12) –Changes or items being considered in PSO IPR Policies –ITU, ISO, and IEC update on IPR –IPR Policies and Current Issues of Organizations External to GSC PSOs/ITU –ANSI update on IPR issues in USA –Experience of practical implementation issues under existing policies, Digital Rights Management, and IPR challenges in Standards making and IPR Policies –Considerations for Developing or Revising SDO IPR Policies –Future of the IPR working group Report to Closing Plenary, Conclusions, Resolutions and Communique

Organizations Participating in IPR WG ATIS, TTC, ETSI, TIA, TTA, ITU, IEEE- SA, IEC SB4, EPO, ANSI, OMA, WIPO, CCSA, ISACC, BWCI, and “Special Guests”

4 Changes or items being considered in PSO IPR Policies Potential items to be discussed: –Essential Copyrights –Trademarks –Unpublished pending patent applications vs. published patent applications –Disclosure –Consideration of policies of External Organizations Scope of licensing obligation Normative Referencing –Governmental Requests Contributions from ETSI, TTC, and oral inputs from many, more details in the following slides.

5 Changes or items being considered in PSO IPR Policies Main outcome: –TTC IPR committee addressing Software copyright; Consistency between TTC IPR rules and ITU/ISO/IEC common IPR rules; and Enhancement of TTC IPR rules (Cont. 3) –ETSI completed it review and updated its Policy and Guidelines (Cont. 4r1, 5) –TIA has made a major change in how it handles LoAs for normatively referenced documents

6 ITU, ISO, and IEC Patent, Software Copyright, and Marks update Issues discussed: –Participants received an update on TSB Director’s IPR Ad Hoc group results (Cont. 02, 02a1) Main outcome: –ISO/IEC/ITU-T/ITU-R have a COMMON Patent Policy, Patent Guidelines, and Patent declaration form –ITU-T has Guidelines on Software Copyright and Guidelines on Marks –ITU-T is developing an improved on-line database of patent declarations

7 IPR Policies and Current Issues of Organizations External to GSC PSOs Updates from External Organizations: –OMA provided an oral update –A European Patent Office (EPO) contribution (Cont. 6R1) –IEEE- SA Contribution (Cont. 10, 10a1) –BWCI Contribution (Cont. 13) Main outcome: –OMA decision to harmonize its policy with those of PSOs and ITU with regard to the scope of the licensing commitment is welcomed –EPO has amassed a large data base of information to use in identification of prior art, and EPO is getting drafts and technical inputs from SDOs, a forecast of some possible futures was presented –IEEE has updated its policy –BWCI is in the process of adopting an IPR Policy –SDOs should cooperate with their PTOs

8 ANSI update on IPR issues in USA Issues discussed: –New ANSI IPR Policy Committee –FTC/DOJ Hearings, report issued (Cont. 9, 9a1) –Rambus Decision (Cont. 14) Main outcome: –No specific ANSI Contribution to this meeting –Contributions on FTC/DOJ hearing and Rambus Decision by the Chair for updates on some recent events in USA

9 Experience of practical implementation issues under existing policies Potential Issues that could be discussed: –Source Code Copyrights used in Standards –Evaluation licenses on Source Code submittals –Trademarks in Standards, both SDO-owned and commercial –IPR Declarations, IPR Databases –Technical means to protect copyrights of SDOs including Digital Rights Management (DRM) implementations Main outcome: –Practical issues were covered in earlier Contributions of PSOs related to evolving policy issues

Considerations for Developing or Revising SDO IPR Policies Issues discussed: –ABA Committee overview (Cont. 8) –TIA Contribution on “SDO IPR Policies, RAND/FRAND or Compensation-Free, the impacts on Participation, Standardization, and Innovation in the Market” (Cont. 11) Main Outcome –ABA book which will useful in drafting, revising, and understanding SDO IPR Policies to be published in August 2007 –RAND/FRAND IPR policies work for standardizers and should be periodically reviewed, but there should be an understanding of the various business models that drive IPR licensing

11 Summary Fruitful discussions on a range of topics IPR WG to meet during GSC-13. Time Allocation: At least half a day, same as GSC-12 and same meeting time template Resolutions drafting group formed, TIA Lead, look at IPR Resolution and Cooperation with PTOs Input to HoDs and GSC-13 host for planning of next meeting and allocation of time for IPR discussions

12 Proposed GSC-12 Resolution Separate files

13 Thank you Dan Bart, TIA