G.Barber Mice Tracker Integration Harbin Jan 2009 1 Mice Tracker Integration Installation requirements & Procedure.

Slides:



Advertisements
Similar presentations
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Advertisements

1 P720 PRINTER CLEANING PROCEDURES. 2 Printer Cleaning Instructions u For the P720 to Operate Properly It Is Important to Keep the Printer Clean and Free.
Step-by-step assembly instructions
Mice Beam Stop Geoff Barber 1 Mice Beam Stop (end of DSA) Details of the current Layout and how it was arrived at.
Expand Media Wall & Podium Case Training Video’s & Instructions.
By Graham Pryke.  Objectives:  Identify the chain & sprockets  Explain why maintenance is necessary  Discuss the four stages of maintenance.
Optical Manufacturing Solutions 1 Probe Assembly.
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
Installation Quick Guide AD400 Cylindrical 6/01/13 Doc #
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
G.Barber: Mice Tracker Meeting New York1 Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
Strut Jack Operation The TeleCrib® Strut Jack is a removable 8,000 lb jack which fits over the strut body and gives the rescuer a controlled means for.
Roboworld KUKA KR180-PA Robosuit Installation Instructions Version 10/10.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
G.Barber Mice Tracker Integration Jun Tracker integration.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
1 Installation of Delphi Frame  ITS Installation.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Diffuser Mounting Design Stephanie Yang.
G.Barber 28 Oct Construction/Refurbishment Of The Tracker Prototype Contents:- Welcome Back Plans Layout Things to be addressed New Schematic.
Takashi Matsushita Imperial College T. Matsushita 1 Engineering (Mechanical) Geoff Barber.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
General idea of a couple of check rod system and adjustments
Installation. Indoor Unit Installation Typical Installation.
Tracker Refurbishment. What was done… Over the past 3-4 months Trackers 1 and 2 have been refurbished. What does this mean? The trackers were removed.
MICE Radiation Shield Installation 1 18 th October2012 Summary of initial test N. Collomb.
Copyright 2008 Kenneth M. Chipps Ph.D. How to Use the 3M Mechanical Splice Tool Last Update
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
Installation. Indoor Unit Installation Typical Installation.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
G.Barber: Mice-International Meeting Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Fibre Optic Connectors.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
M. Takahashi, 21 January, 2016 Station Acceptance (SA)
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
G.Barber Mice Tracker Mechanical Progress Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment of Tracker.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
G.Barber: Mice Collaboration Meeting 29 March Plans for Sci-Fi Prototyping. Contents:- Mechanical Layout of Sci-Fi Design of the Single Stage Design.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
STEP 1: ASSEMBLE ANGLE PLATES
Easy Reach 7.0 Honda Element 2003
Easy Reach 7.0 Honda Element 2003
Soxhlet Unit B Maintenance By: Shawna Brookes.
STEP 1: ASSEMBLE ANGLE PLATES
Cryomodule Assembly Plan
Gattini Detector Installation
Presentation transcript:

G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure

G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Interface Between the Tracker and the Solenoid There are two areas of integration between the solenoid and the Tracker: The actual tracker assembly which needs to slide into the bore of the solenoid and be aligned with the axis of the experiment. The patch panel which forms a light/gas tight seal to the outside world allowing the optical fibres to be routed to the VLPC’s It is proposed to visit Wang in February to see the solenoid and to check for any possible clashes/problems. We have manufactured a go no go gauge which will not only highlight any possible problems of straightness and roundness of the magnet bore but will also tell us how much freedom we have for alignment and we can then manufacture the adjuster cams that align the structure to suit the ‘real’ gap.

G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration A quick reminder of the installation requirements: It is assumed that for the installation of the tracker into the solenoid:- 1.The solenoid assembly will be pulled out of the beam line. 2.The helium window will be removed (for survey) 3.There will be a tent or other means to ensure no UV exposure for the tracker and to give a clean environment. 4.There is at least 2M of clear working area in front of the solenoid

G.Barber Mice Tracker Integration Harbin Jan Installation ‘Cartoon’ The following sequence was shown a while back, but I believe it is still relevant. It attempts to show the stages of installation of the tracker into the solenoid. They are not finalised in that it is still evolving and we hope to test the full system at the end of the month when we build and install tracker 2 into its cosmic ray test stand.

G.Barber Mice Tracker Integration Harbin Jan Stage 1 of Installation The patch panel is fitted and sealed to the solenoid. Hopefully at this stage we can test the seals using cover plates, although it is quite likely that helium will slowly permeate through the fibre connectors.

G.Barber Mice Tracker Integration Harbin Jan Stage 2 of Installation An installation rig is fitted in front of the solenoid and aligned. This will allow us to safely insert the tracker, supporting it all of the way to its final position

G.Barber Mice Tracker Integration Harbin Jan Stage 3 of Installation The tracker, complete with the light guide support structure is lifted onto the installation cradle. The light guide are then attached to the tracker and held on the support structure. This ensures that no damaging forces are exerted on the fibres. To ease the assembly the installation cradle can be lowered.

G.Barber Mice Tracker Integration Harbin Jan Stage 4 of Installation The tracker is then slide into the bore of the solenoid and can be aligned. To do this the helium window at the far end will need to be removed. Once aligned the tracker is locked into position.

G.Barber Mice Tracker Integration Harbin Jan Positioning In The Solenoid The tracker sits on 4 adjustable feet two at the front two at the rear and is held down by a spring loaded foot at the 12 o’clock position. This aligns the axis of both tracker and solenoid The tracker is aligned in Z and Phi by pulling a locating block into a Vee which is located using dowels to the patch panel. Bracket with locating Vee for Z & Phi Adjustable feet (at both ends of Tracker For X-Y Alignment

G.Barber Mice Tracker Integration Harbin Jan Stage 5 of Installation With the tracker in position and secured the light guides can now be carefully be dismounted from the support structure and re-routed to their final position in the patch panel and the seals fitted. If the external light guides are not to be attached immediately then light tight/protection covers will remain fitted. Note a great deal of care is required to lay and secure the fibres to prevent damage.

G.Barber Mice Tracker Integration Harbin Jan Stage 6 of Installation When the light guides are secured a shield (not shown) is fitted to stop any damage occurring when the diffuser is installed. The Light guide support structure is now dismounted, the installation platform removed and the patch panel cover fitted. Internal Waveguides fitted and secured using double sided velcro wraps. This was for the tracker 1 cosmic ray test run

G.Barber Mice Tracker Integration Harbin Jan Hall Probe Installation Once the positions are known for the hall probes brackets (already manufactured) will be glued to the tracker frame. The actual devices can be fitted during the installation of the internal wave guides and the wires routed as with the wave guides. The connections are made using the 26 th feed thru hole.

G.Barber Mice Tracker Integration Harbin Jan Diffuser Integration Roger and I visited the Oxford workshop today (Friday 9 th Jan) to see the diffuser top hat in situ with the patch panel. It looks good, one of our support holes out of line but due we believe to a cranked support being rotated, easily remedied. I asked Joe to modify the installation support to give us a balanced load during fitting and he will have this done next week. When this is done I will visit again but it looks GOOD!! We will be able to collect the patch panel for use in tracker 2 cosmic test week beginning 19 th Jan.