2010-2011 DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.

Slides:



Advertisements
Similar presentations
TOWN OF ORONO FY2014 Draft Municipal Budget Presentation June 10, 2013.
Advertisements

CITY OF MERIDIAN FY09 BUDGET HEARING Mayor – Tammy de Weerd Council President – Charlie Rountree Council Vice President – David Zaremba Council – Keith.
Capital Improvement Plan May 8 th, 2013 Presented by City Administration: Public Works Department Finance Department.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
CITY OF MERIDIAN FY08 BUDGET HEARING Mayor – Tammy de Weerd Council President – Joe Borton Council Vice President – Charlie Rountree Council – Keith Bird.
City Council Meeting August 2,  Part I – Regulations and Terminology May 17, 2011  Part II – Revenues June 7, 2011  Part III – Fund Descriptions.
FY2016 Proposed Budget March 17, Fiscal Year 2016 Proposed General Fund Budget $133.4 million No Tax Rate Increase Proposed Current Rate:
2013 City Budget Manhattan ~ Kansas Work Session Two.
Accounting Details We show transfers as a separate line below personnel, operating expense, and capital outlay so true cost of the department before transfer.
TOWN OF MONTREAT FISCAL YEAR Annual Budget Public Hearing and Presentation to the Board of Commissioners June 13, 2013.
2004 Budget Presentation City Commission Budget Study Session July 2, 2003.
2016 BUDGET OVERVIEW SANGER, TEXAS. BUDGET PHYLOSOPHY Conservative revenue estimates based on history. Expenditures based on history and anticipated cost.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, May 19 th, 2015.
CITY OF MERIDIAN FY07 BUDGET HEARING Mayor – Tammy de Weerd Council President – Shaun Wardle Council Vice President – Joe Borton Council – Keith Bird Council.
Bringing It In House. IndianTrailsSportsComplexexpansion.
Fiscal Year Budget Public Hearing June 4, 2009.
Do you raileze that the mnid is an ainazmg tihng? It msut be if you are rdaieng tihs. Wlel, it’s tmie to put taht anaimzg mnid to wrok aaign. We are in.
Finance Department Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst.
CITY COUNCIL GOALS & OBJECTIVES. TOP PRIORITY Street Valley Gutters 33 installed by Public Works 35 installed by contractor Pipe Replacement Program.
The Corporation of the Town of Amherstburg Public Works Department 2013 CAPITAL BUDGET Presented to: The Heavy Construction Association March 20, 2013.
Town of Lantana Budget Workshop July 27, :30 PM TOWN OF LANTANA 2009/10BUDGETWORKSHOP.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, May 26 th, 2015.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Finance & Budget Analyst.
FINAL BUDGET CITY COUNCIL PUBLIC HEARING SEPTEMBER 27, 2011.
1 st Quarter 2015 Financial Report City Council Meeting June 11, 2015.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Finance & Budget Analyst.
City Council Meeting Presentations.  Part I – Regulations and Terminology May 17, 2011  Part II – Revenues June 7, 2011  Part III – Fund Descriptions.
Bringing It In House. IndianTrailsSportsComplexexpansion.
City Council Workshop Presentation July 26, 2011.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, July 28 th 2015.
Finance Department Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Wednesday, September 9 th 2015.
Transportation Projects City Council Workshop May 14, 2013.
City Council Presentation September 5,  April ◦ Departments begin line item budgets and projections ◦ Departments submit new program, personnel.
5-Year Capital Improvements Water Supply, Treatment and Distribution Water Treatment Plant #1 – Wells and Wellfields$ 500,000 –
Budget City of Palm Coast, Florida City Council Work Session August 7, 2007.
City of Parkland Fiscal Year Proposed Budget Commission Workshop August 18, 2010.
Recommended May 12, Budget Presentation Peer comparisons Decision filters  Strategic Plan  Budget Development Guidelines General Fund Revenues/Expenditures.
SUMMARY OF FY2016 PROPOSED BUDGET July 21,
1. FY Proposed Budget Jamie Justice, Town Manager & Piet Swart, Finance Director April 26, 2016 Fiscal Year Proposed Budget 2.
Strategic Plan for Public Works Services and Operations.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
City of Joliet 2016 Proposed Budget November 30, 2015.
City Council Presentation September 19,  April ◦ Departments begin line item budgets and projections ◦ Departments submit new program, personnel.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst.
P UBLIC W ORKS D EPARTMENT Total Proposed Budget $52,121,714 Funded Full Time Equivalent Positions (FTEs) = 238 Budget page Budgets shown in Millions.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
TRIM/Millage Rate  Proposed Millage Rate – Decrease of.0199  Current Year Gross Taxable Property Value $3,007,029,613  Prior Year Gross Taxable.
Pueblo West Metro District Proposed 2016 Budget. Revenue Sources SourceFund Property TaxesGeneral Fund Highway User TaxesGeneral Fund Franchise FeesGeneral.
REVENUE OVERVIEW FY2016 PROPOSED BUDGET July 28,
Budget City of Palm Coast, Florida City Council Work Session August 12, 2008.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
Revised Budget Proposed budget
Environmental Services
Fund Accounting Overview
CITY OF NORFOLK, NEBRASKA
GENERAL FUND Year-end Projections FY 16/17
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA
Fiscal Year 2017 Final Budget Workshop
Fund Accounting & Revenue Overview
Elizabeth City Council
2019 Operating Budget Lunch ’n Learn.
Commission Workshop 2 Preliminary Budget Presentation
Commission Workshop 3 Budget Presentation
First Public Hearing to Adopt the Tentative Budget and Millage Rate
Presentation transcript:

DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010

GENERAL FUND ADDITIONAL DISCUSSION AND QUESTIONS

UTILITY

UTILITY BUDGET Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 REVENUES $40,988,051$32,090,445$30,844,855$31,345,250 EXPENDITURES $35,094,151$32,090,445$30,844,855$31,345,250 ’10 Budget vs ’11 Budget- Or + TOTAL-$745K PERSONNEL113.2 Employee changes-2.0, -$360K Other major changes

CUSTOMER SERVICE Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 EXPENDITURES $1,135,115$1,166,196$1,140,804$1,094,576 ’10 Budget vs ’11 Budget- Or + TOTAL-$72K Other major changesCapital: Automate posting payments $15K

UTILITY ADMINISTRATION Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 EXPENDITURES $1,302,988$1,290,555$1,291,703$1,204,686 ’10 Budget vs ’11 Budget- Or + TOTAL-$86K Other major changes

UTILITY MAINTENANCE Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 EXPENDITURES $730,641$657,846$671,740$598, 781 ’10 Budget vs ’11 Budget- Or + TOTAL -$59K Other major changes

WASTEWATER COLLECTION Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 EXPENDITURES $2,401,258$2,561,010$2,437,034$2,319,639 ’10 Budget vs ’11 Budget- Or + TOTAL -$241K Other major changes Capital summary Meters: $ 5,000 Pumps: $24,000 Total: $29,000

WASTEWATER TREATMENT Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 EXPENDITURES $1,881,268$1,814,948$1,722,739$1,819,722 ’10 Budget vs ’11 Budget- Or + TOTAL+$5K Other major changes

WATER PLANT #1 Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 EXPENDITURES $1,857,114$1,980,448$1,807,263$1,836,723 ’10 Budget vs ’11 Budget- Or + TOTAL-$144 Other major changes

WATER PLANT #2 Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 EXPENDITURES $1,454,783$1,579,729$1,309,600$1,419,383 ’10 Budget vs ’11 Budget- Or + TOTAL-$160K Other major changes

WATER PLANT #3 Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 EXPENDITURES $883,270$1,038,708$1,055,509 $1,064,998 ’10 Budget vs ’11 Budget- Or + TOTAL+$26K Other major changes

WATER QUALITY Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 EXPENDITURES $459,566$451,569$443,399$426,963 ’10 Budget vs ’11 Budget- Or + TOTAL -$25K Other major changes

WATER DISTRIBUTION Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 EXPENDITURES $3,595,264$3,124,215$3,140,637$2,968,066 ’10 Budget vs ’11 Budget- Or + TOTAL-$156K Capital summary Meters: $495,785

UTILITY NON-DEPARTMENTAL Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 EXPENDITURES $19,392,884$16,425,221$15,824,427$16,591,713 ’10 Budget vs ’11 Budget- Or + TOTAL+$166K Other major changes

STORMWATER

STORMWATER BUDGET Capital Land for access: $15K Field Automation Equipment: $7,500 Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 REVENUES $5,404,875$10,247,400$11,833,700$7,378,200 EXPENDITURES $4,079,982$10,247,400$11,833,700$7,378,200 ’10 Budget vs ’11 Budget- Or + TOTAL-$2.9 million Other major changesEstablished pipe & ditch crews Reduced contract services

STORMWATER MANAGEMENT FUND FY 11FY12FY 13FY 14FY 15 TOTAL AVAILABLE FUNDS $7,790,946$8,875,981$9,032,995$9,126,809$9,131,923 TOTAL EXPENDITURES $7,107,365$8,170,786$8,371,086$8,599,086$8,836,286

STORMWATER UTILITY CAPITAL PROJECTS FUND FY 11FY12FY 13FY 14FY 15 Swale Rehabilitation Program $865,000$882,300$899,900$917,900$4,501,400 Valley Gutter Improvements $75,000$76,500$78,800$79,600$81,200 Pipe Replacement$1,361,611$1,388,800$1,416,600$1,444,900$1,473,800 Control Structure Rehab$492,600$506,000$517,000$528,000$539,000

INFORMATION TECHNOLOGY & COMMUNICATIONS

INFORMATION TECHNOLOGY & COMMUNICATIONS FUND Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 REVENUES $2,531,702$3,281,781$2,810,927 EXPENDITURES $2,531,702$3,281,781$2,810,927 ’10 Budget vs ’11 Budget- Or + TOTAL +$279K PERSONNEL12.5 Employee changes-2.0, -$175K Other major changesAdded capital & contingency to FY10: $888K Operations support down $40K Capital Network equipment: $40K Security camera/access control: $60,000 Fiber Cable: $215,200

BUILDING PERMITS & INSPECTIONS

Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 REVENUES $1,548,947$1,714,913$1,512,072 EXPENDITURES $1,548,947$1,714,913$1,512,072 ’10 Budget vs ’11 Budget- Or + TOTAL -$37K PERSONNEL15.4 Employee changes-2.6, -$78K Other major changesAdded 2 construction inspectors, supported by site permit fees

GOLF COURSE

GOLF COURSE BUDGET Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 REVENUES $97,704$2,866,230$2,510,400$1,492,200 EXPENDITURES $4,584,218$2,866,230$2,510,400$1,492,200

TENNIS

TENNIS BUDGET Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 REVENUES $236,084$286,719$281,800$304,208 EXPENDITURES $242,969$286,719$281,800$304,208 ’10 Budget vs ’11 Budget- Or + TOTAL+$18K PERSONNEL0 Employee changes-4 Other major changesContract with Kemper

SOLID WASTE

SOLID WASTE BUDGET Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 REVENUES $7,479,229$7,658,400$7,724,600$7,745,800 EXPENDITURES $6,948,593$7,658,400$7,724,600$7,745,800 ’10 Budget vs ’11 Budget- Or + TOTAL +$87K Other major changes

MISCELLANEOUS FUNDS

CDBG FUND Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 REVENUES EXPENDITURES $3,201

POLICE EDUCATION FUND Actual FY 09 Budget FY 10 Estimated FY 10 Proposed FY 11 REVENUES $9,388$76,500$49,000$55,400 EXPENDITURES $24,000$76,500$49,000$55,400

POLICE AUTOMATION FUND Actual FY 09 Budget FY 10 Estimated FY 10 Proposed FY 11 REVENUES $37,068$261,800$244,600$270,100 EXPENDITURES $261,800$244,600$270,100

DISASTER RESERVE FUND Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 REVENUES $802,600$2,222,300$2,168,900$2,200,900 EXPENDITURES $755,379$2,222,300$2,168,900$2,200,900

RECYCLING FUND Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 REVENUES $69,051$272,200$118,900$306,900 EXPENDITURES $63,164$272,200$118,900$306,900

NEIGHBORHOOD STABILIZATION FUND Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 REVENUES $5,856$2,131,900$2,290,500 EXPENDITURES $5,856$2,131,900$2,290,500

Staffing Enterprise Fund Yr Change 4-Yr Total Change FTE UTILITY FLEET STORMWATER TENNIS INFORMATION TECHNOLOGY BUILDING PERMITS & INSPECTIONS SOLID WASTE ENTERPRISE FUND

CAPITAL FUNDS

PARK IMPACT FEE FUND

FY 11FY12FY 13FY 14FY 15 TOTAL AVAILABLE FUNDS $ 766,918$997,118$1,377,918$1,782,518$691,818 TOTAL EXPENDITURES $137,000$1,500,000$500,000

Park Impact Fee Fund FY 11FY12FY 13FY 14FY 15 Trails Graham Swamp Trail$137,000$1,500,000$500,000

FIRE IMPACT FEE FUND

FY 11FY12FY 13FY 14FY 15 TOTAL AVAILABLE FUNDS $144,293$222,693$304,593$389,793$478,793 TOTAL EXPENDITURES $150,000

Fire Impact Fee Fund FY 11FY12FY 13FY 14FY 15 Fire Station # 26 – Seminole Woods$150,000

TRANSPORTATION IMPACT FEE FUND

FY 11FY12FY 13FY 14FY 15 TOTAL AVAILABLE FUNDS $6,804,100$8,394,300$6,427,800$1,979,700$2,080,100 TOTAL EXPENDITURES $4,950,000$7,000,000$5,800,000$1,400,000 Revenues are lower than current project commitments by $4mil

Transportation Impact Fee Fund FY 11FY12FY 13FY 14FY 15 Belle Terre Parkway 4 Laning $2,500,000 Palm Harbor Extension$250,000 Palm Coast Parkway 6 Laning $1,500,000$5,000,000$4,000,000 Old Kings Rd. Extension$280,000$750,000 North Pine Lakes Parkway Improvement North Old Kings Road 4 Laning $420,000$1,000,000 Belle Terre Parkway- Palm Coast Parkway to Pine Lakes Parkway $150,000$500,000

STREETS IMPROVEMENT FUND

FY 11FY12FY 13FY 14FY 15 TOTAL AVAILABLE FUNDS $6,733,652$6,109,152$6,936,452$9,095,052$11,680,952 TOTAL EXPENDITURES $6,463,900$5,130,900$3,930,400$3,637,100$3,640,300 Added North Pine Lakes Parkway from Impact Fee Fund ½ cent sales tax expires after FY2012, budget FY13-FY15 reflects renewal by voters

Streets Improvement Fund FY 11FY12FY 13FY 14FY 15 Street Paving and Resurfacing $4,338,900$4,555,900$2,535,400$2,662,100$2,795,300 Royal Palms Parkway Shoulders Intersection/Turn Lane Improvements $350,000$400,000 Signage Upgrades Complete Traffic Signals $470,000$270,000 Guardrail Safety Improvements $250,000$200,000 Pavement Marking $75,000 North Pine Lakes Parkway Improvements $1,500,000 Whiteview Parkway Shoulders

CAPITAL PROJECTS FUND

FY 11FY12FY 13FY 14FY 15 TOTAL AVAILABLE FUNDS $11,648,429$12,891,929$1,925,829$1,977,329$1,445,929 TOTAL EXPENDITURES $10,683,500$12,795,100$1,660,000$1,700,000$1,010,000

Capital Projects Fund - 1 of 2 FY 11FY12FY 13FY 14FY 15 Fire Station #22 Replacement $200,000$1,000,000$1,200,000 Industrial Park Bridge Rehabilitation$910,000 $810,000 Holland Park Renovation$112,500 Indian Trails Sports Complex $330,000 Sidewalks and Bike Paths$5,798,900$3,455,100 Community Development Software $70,000

Capital Projects Fund - 2 of 2 FY 11FY12FY 13FY 14FY Mhz System Improvements$300,000 Parkway Beautification$200,000$40,000$360,000$200,000 Gateway Corridor Beautification $1,472,100 Longs Landing$215,000 Park Renovation$75,000 City Hall$1,200,000$8,800,000 General City Project Planning

SR 100 CRA FUND

FY 11FY12FY 13FY 14FY 15 TOTAL AVAILABLE FUNDS $3,265,490$11,962,421$4,212,083$2,316,759$2,249,483 TOTAL EXPENDITURES $2,329,369$9,054,938$3,255,824$1,506,276$1,506,294

SR100 CRA Fund FY 11FY12FY 13FY 14FY 15 Bulldog Drive$400,000$2,200,000$1,800,000 Midway$1,000,000 Whispering Pines Central Park$150,000

MISCELLANEOUS FUNDS

OLD KINGS ROAD SPECIAL ASSESSMENT FUND FY 11FY12FY 13FY 14FY 15 TOTAL AVAILABLE FUNDS $50,000,000$4,500,000 TOTAL EXPENDITURES $50,000,000$4,500,000

DEVELOPMENT SPECIAL PROJECTS FUND FY 11FY12FY 13FY 14FY 15 TOTAL AVAILABLE FUNDS $1,164,905$1,187,905$1,210,905$1,234,905$1,258,905 TOTAL EXPENDITURES

UTILITY CAPITAL PROJECTS FUND

FY 11FY12FY 13FY 14FY 15 TOTAL AVAILABLE FUNDS $24,911,434$28,081,334$24,033,334$7,771,134$7,847,334 TOTAL EXPENDITURES $23,576,000$26,344,000$20,861,000$4,734,000$7,204,000

Utility Capital Projects Fund - 1 of 2 FY 11FY12FY 13FY 14FY 15 Wellfield & Wells$4,840,000$800,000$827,000$1,050,000$1,300,000 Water Mains$1,250,000 $2,000,000 Distribution System Improvement $200,000 Water Treatment Plant #1$25,000$250,000 Water Treatment Plant #2$3,405,000$3,000,000 Water Treatment Plant #3$250,000$500,000 Utility Land Acquisition$250,000 General Plant R&R Water$500,000$250,000 Misc Utility Services$71,000$129,000$149,000$179,000$149,000 Wastewater Treatment Plant #1 $2,930,000$3,200,000 $500,000 Wastewater Treatment Plant #3 $500,000

Utility Capital Projects Fund - 2 of 2 FY 11FY12FY 13FY 14FY 15 Lift Stations & Pump Stations $1,555,000$1,805,000$805,000$455,000 Force Mains$2,000,000$1,250,000 Reclaimed Water$400,000$1,000,000 $3,600,000 PEP System$600,000 Wastewater Treatment Plant #2 $1,300,000$11,360,000$9,180,000 General Plant R&R Wastewater $500,000$250,000$500,000$250,000$500,000 Beachside Sewer System $2,500,000$1,000,000 Coquina Coast Sea Water Desalination $1,250,000$1,000,000 $2,000,000

FLEET MANAGEMENT FUND

FLEET MANAGEMENT Actual FY09 Budget FY 10 Estimated FY 10 Proposed FY 11 REVENUES $3,640,319$5,864,400$4,457,077$3,673,297 EXPENDITURES $2,851,112$5,864,400$4,457,077$3,673,297

FLEET CAPITAL FUND

FLEET MANAGEMENT FUND FY 11FY 12FY13FY 14FY 15 TOTAL AVAILABLE FUNDS $4,784,884$5,862,771$4,707,026$5,212,513$6,578,389 TOTAL EXPENDITURES $2,575,255$5,036,830$3,417,200$2,619,100$2,292,700

Fleet Management Fund - 1 of 2 FY 11FY 12FY13FY 14FY 15 FLEET:. Community Relations$15,200 Financial Services$21,200 Planning$42,100 Code Enforcement $213,530$13,600 Fire$19,700$438,600$135,400$28,000 Streets$207,080$771,100$538,700$59,700$117,000 Facilities Maintenance$25,600 Engineering$162,600$13,600 Parks/Facilities$62,100$54,730$26,700$33,300 Utility Administration$107,900$22,000 Utility Maintenance$190,500$73,350$34,500 Wastewater Collection$17,590$412,500$623,300$203,000$63,800

Fleet Management Fund - 2 of 2 FY 11FY 12FY13FY 14FY 15 FLEET (continued):. Wastewater Treatment$63,500$75,900 Water Plant #1$75,800 Water Plant #2$29,900 Water Plant #3$13,300 Water Quality$80,100 Water Distribution$79,000$228,970$99,900$206,300 Stormwater Management$401,400$93,200$48,900$137,500 Building Permits & Inspections$89,900$13,600 Golf Course$49,600$49,400 Information Technology & Communications $16,400$20,000 Fleet Management$97,600

ITEMIZED VEHICLES VehicleCost Passenger Van – Fire$19,700 Pickups (Crew Cab & 4x4) (2-Streets/1-Utility)$52,770 Dump Truck – Stormwater$110, Ton Trailer – Stormwater$30,000 Bush Hog – Stormwater$15,400 Utility F-350 – Stormwater$35,000 Utility Body F-550 – Stormwater$35,000 Mini-Excavator – Stormwater$70,000 Mowers – Streets (5)$158,100 Multi-Terrain Loader – Utility$79,000 Skid Loader – Streets$26,400 Skid Steer – Stormwater$91,000 Spray Rig – Parks$24,000 Top Dresser – Parks$15,500 Trailer – Stormwater$15,000 Utility Body – Streets$10,000

Passenger Vehicles Specialty Vehicles Off-Road EquipmentTotal General Fund Utility Fund Stormwater Management Fund Building Permits & Inspections Fund8008 Golf Course Fund0013 Information Technology & Communications Fund2002 Fleet Management Fund ITEMIZED VEHICLES

Tue - Sept 8Public Hearing to tentatively 5:05 P.M.adopt Millage Rate and Budget. Tue - Sept 21Public Hearing to adopt final 5:05 P.M.Millage Rate Resolution and Budget Resolution. ADOPTION OF BUDGET