GENERAL FUND Year-end Projections FY 16/17

Similar presentations


Presentation on theme: "GENERAL FUND Year-end Projections FY 16/17"— Presentation transcript:

1

2 GENERAL FUND Year-end Projections FY 16/17
Projected Revenues $4,418,970 Projected Expenditures $4,035,409 Excess of Revenues over Expenditures $383,561

3 EXCESS REVENUE OVER EXPENDITURES
Excess of Revenues over Expenditures $383,561 Projected Excess Permitting Fees-Transfer $166,153 Projected Excess Revenues-Fund Balance Reserve $217,408

4 CAPITAL ITEMS FUNDED FY 16/17
DEPARTMENT ITEM AMOUNT PUBLIC WORKS EXCAVATOR $77,000 DUMP TRUCK $65,000 EQUIPMENT TRAILER $16,000 AERIAL BOOM $15,000 POLICE DEPARTMENT 2 POLICE INTERCEPTORS $72,000 FIRE DEPARTMENT SLEEPING QUARTERS $250,000 FIRE TRUCK $425,000 ROLLER RACK UNIT $8,394 Public Works/SC PIPE CAMERA $6,333 TOTAL $ 934,727

5 NON-CAPITAL (Funded) FY 16/17
Surface Pro Tablets $5,421 HVAC-Old Town Hall $4,712 Fire Gear $22,835

6 STORMWATER ENTERPRISE FUND YEAR END PROJECTION FY 16/17
Projected Revenues $75,000 Projected Expenditures $75,000

7 SOLID WASTE ENTERPRISE FUND YEAR END PROJECTIONS FY 16/17
Projected Revenues $272,000 Projected Expenditures $272,000

8 Debt Service Item Principal Balance Interest Rate End Date
(Existing) Annual Debt Service (Proposed) Annual Debt Service Town Hall/Tanker $797,552 2.69 03/21/28 $84,724 Public Safety Facility $320,000 2.58 12/22/24 $49,288 Fire Truck $425,000 2.08 11/01/26 $47,512 Equipment/Vehicles $245,000 1.87 11/01/21 $51,783 Sleeping Quarters $250,000 2.43 12/14/26 $31,075 Total Debt $2,037,552 $264,382

9 Proposed Budget FY 17/18 (Highlights)

10 .01 = $44,325 (100% Collection) .01 = $43,057 (97.14% Collection)
TAX RATE .01 = $44,325 (100% Collection) .01 = $43,057 (97.14% Collection) Current Tax Rate = 35 cents/$100 No change projected in proposed budget

11 General Fund Proposed Revenues 2017-18 ($3,716,503)

12 General Fund Proposed Expenditures 2017-18 ($3,716,503)

13 Merit/Cola Funded FY 17/18 Merit -1.5% $15,665 Cola -1.5% $21,898

14 CAPITAL ITEMS FUNDED IN FY 17/18 BUDGET PROPOSAL
DEPARTMENT ITEM AMOUNT PUBLIC BUILDINGS SERVICE TRUCK (1/4 COST) $ 6,750 METAL BUILDING (1/4 COST) $11,000 STREETS SERVICE TRUCK PARKS & RECREATION PASSENGER VAN $27,547 POLICE POLICE VEHICLE $36,000 SET ASIDE UNDESIGNATED/CAPITAL RESERVE $32,646 SIDEWALKS CAPITAL RESERVE $25,000 TOTAL CAPITAL OUTLAY $156,693 ACKNOWLEDGED IN 5-YEAR CAPITAL IMPROVEMENT PLAN

15 ENTERPRISE FUNDS

16 Comments on Stormwater Enterprise Fund during deliberations
Consider a fee credit for homeowners (utilizing Swansboro’s Watershed Restoration Plan) Provide option if lump sum paid up front Consideration should be given for smaller businesses (reduced rate) compared to larger businesses/generators of impervious surface Do not change fee, even reduce fee through stormwater credit (homeowners)

17 Challenges to developing rates - Commercial
132 commercial parcels within Town limits contain impervious surface = $40,000 est. stormwater revenue Decreases in fee for smaller businesses offset by larger businesses Option .01/SF with minimum fee equal to highest residential tier – burden carried by largest generators

18 FY Rate Tables

19 FY 17-18 Proposed Rate Tables
Residential Tier FY $1.25 increase Tier SF Monthly Rate Annual I <1,000 SF $2.00 $24.00 II 1,001-1,794 $3.50 $42.00 III 1,795-2,669 $3.75 $45.00 IV 2,670-3,544 $4.00 $48.00 V >3,545 $4.25 $51.00 Commercial Tier FY Minimum Fee >1,000 SF Impervious Base Fee <1,000 SF Impervious 0.01/SF Based on Total Impervious Surface Example 10,000 SF $8.33 $100.00 (2) MONTHLY CREDITS MAY APPLY TO BOTH RESIDENTIAL AND COMMERCIAL (LUMP SUM & BMP)

20 STORMWATER ENTERPRISE FUND FY 17/18
Proposed Revenues $104,291 Proposed Expenditures $104,291

21 SOLID WASTE ENTERPRISE FUND FY 17/18
Proposed Revenues $303,584 Proposed Expenditures $303,584 **PROPOSED RATE INCREASE RATE RESIDENTIAL /MONTH =$15.45/MONTH COMMERCIAL /MONTH = $25.75/MONTH

22 ENTERPRISE FUNDS CAPITAL ITEMS FUNDED IN FY 17/18 BUDGET PROPOSAL
AMOUNT SERVICE TRUCK (1/4 COST) $ 6,750 METAL BUILDING(1/4 COST) $11,000 METAL BUILDING (1/4 COST) TOTAL $35,500

23 ENTERPRISE FUNDS DEBT SERVICE FY 17/18
STORMWATER $8,224 *(1/4 COST) SOLID WASTE $9, (1/4 COST) * DOES NOT FUND LIFT

24 FEE SCHEDULE PROPOSED INCREASES SUMMARY FY 17/18
SOLID WASTE STORMWATER PARKS & RECREATION MEETING ROOM RENTAL FEES PARK FACILITIES FEES