For Our Kids Mission Beach Aquatic Facility For our Youth, Seniors, Visitors, For Us All Concept Designs So Far + MBARC’s View Click your mouse to move.

Slides:



Advertisements
Similar presentations
Fleurieu Regional Aquatic Centre Project summary October 2013 council meetings.
Advertisements

Avenida La Pata/Avenida Vista Hermosa Community Park PRESENTATION TO CITY COUNCIL and PARKS AND RECREATION COMMISSION December 15, 2004.
Campus Recreation Center
Developing a Shared Direction Joint meeting of the Brownsburg Town Council and Park Board January 29, 2015.
Louisiana Yards and Neighborhoods For the Right Place Selecting the Right Plant.
FORT PIERRE & PIERRE COMMUNITY MOPTF (MAYOR’S OUTDOOR POOL TASK FORCE) APRIL 21, 2008.
Landscape Design Basics Or When Plants and People Collide.
Sports Complex Proposal GARY ROBERTS AND TRAVIS PALMER.
BUDGET RATIFICATION MEETING If you haven’t, please sign in Coffee and water are located in the back Meeting Protocol is in your packet, please review.
KINESIOLOGY/ ATHLETICS COMPLEX PALOMAR COLLEGE. Process.
Why do we need a new pool? The original pool was built in 1973 with a 20 year life expectancy For many years, infants/toddlers have had very limited,
Changes to the 2011 Landscape Projects Grand Haven.
Survey Results September Survey Information There is an error margin of ±3.6 on this survey. South Ogden City sent out 5,300 surveys and received.
Getting Started. Objectives that will be covered: 1.Homepage walkthrough.Homepage walkthrough. 2.Setting up your class communitySetting up your class.
Presented By: Counsilman ▪ Hunsaker November 12, 2013.
Riverview Community Wellness Place A place to grow wellness in Riverview!
I am a conscientious consumer and can locate health services in my community *King county Aquatic Center Swimming pool *Federal way Community center *Fitness19.
Bahamas Presented by: Clare Mellinger Project 6 May 4, 2011 Here is a website to learn more about the Bahamas.
ACQUATICS FACILITY STUDY City of Vincennes Department of Parks & Recreation.
Impington Sports Centre. Located in Impington – Cambridge City Boundary Impington Village College was opened in 1939, two weeks after the outbreak of.
Swimming Pool Feasibility study Town Hall Presentation 14 August 2013.
Home screen of your online tracker system Updates or notes for your attention are placed at the top in red. This will also inform you of the document turnaround.
Utah Valley Aquatics Website Tutorial. Getting Logged in Once you have turned in all your registration paperwork and payments you will receive an .
Competition Standard Swimming Pool at Blackbird Leys.
Business Planning j Through operational management.
Nepenthe Update on Finances Board of Directors Meeting Nov. 30, 2009.
Overview.  Accreditation is both a status and a process  Status:  Status: Accreditation provides public notification that standards of quality are.
Management Learning Laboratories Incorporated Village of Garden City – Recreation and Parks Needs Assessment M anagement L earning L aboratories June 2013.
Objectively evaluate our property in the marketplace Owners Real Estate Companies Rental Companies Consider Future Options to: Maintain market competitiveness.
Missoula Aquatics Centers Operations Pro-forma III Developed by Ballard*King and Associates.
User requirements. BigNightOut A night on the town Where should I go? How do I get there? Is it within my budget? Who do I go with?
OCEAN RESIDENTIAL PROPERTY CO.,LTD. Tel : +66(0) BEST CONDOMINIUM PROJECTS IN PATTAYA 1. THE PEAK TOWERS 2. THE PALM WONGAMAT.
Bergen Street South Community Planning Workshop March 18, 2015 Visual Preference Survey Results ▪Retail and Mixed Uses ▪žResidential Densities ▪žRecreational.
Transport, Storage, and Handling Tips for Conservation Seedlings Michael Kangas North Dakota Forest Service.
1 Jacqui Banerjee Stephanie Carnachan May 2009 Forest Hill Pools Consultation Spring 2009.
Presented by: Servus Place – A Plan for the Future Report on Public Consultation and Revised Plans Diane Enger Director Servus Credit Union Place March.
Landscape Designs.  Free consultation visit  Garden survey and evaluation  Design selection  Professional working plan.
Opua is on track to steam ahead !. Why steam into Opua? Opua is the terminus for the oldest railway in the North Island, opened in The Bay Of Islands.
Surface Water Integrated Monitoring System (SWIMS) Database system Rivers, streams, lakes DNR staff, volunteers, consultants, others.
TPC All Committees Meeting November 21, At the End of the Day Fix some of the problems that get in the way of members having more fun …. without.
At Earth Temple, we embrace various models and methods of building residential homes – particularly for those interested in living “off-grid”, sustainable.
Presented by: Donna Gaukler, Director. Provide quality aquatics programs, opportunities and facilities for citizens of all ages, interests, and abilities.
Return site to its rightful glory with cleaner water and more enjoyable experience Propose appropriate additions and renovations to pool, buildings and.
Budget There will be no raise in dues this year. Next year they will likely need to be raised.
Mission Beach Aquatic Centre QLD: 79 towns (2,500+) …. Only ONE has no pool. 104 towns smaller than Mission Beach have pools. There are more than five.
Access to Destiny John A. Ferguson Senior High Information Center Lissette Alvarez.
Access to Destiny John A. Ferguson Senior High Information Center Lissette Alvarez.
South Fork East Final Report December 28, 2015 Kevin Nobles 1.
 To get kids off the street and into a facility where they can have fun and learn. Whether you need rehab services or not, this facility will help children.
Landscape Design Basics Or When Plants and People Collide.
Brought to you by.com. Hagimit Falls is one of the most popular attractions on Samal Island. It is the perfect spot for being one with nature and taking.
Facility Committee June 17, Othello Community Pool Features: Leisure amenities: including a 2,800-square-foot leisure pool, lazy river and spray.
What will our communities demand of our pools? Paul Fernee Coordinator Community Facilities May 2016.
Opsis Architecture | Ballard*King Opsis Architecture | Lango Hansen Hillsboro Community Center and Park Public Meeting 3.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
Connecting Eastside and Victoria Leisure Centre - Update St Ann’s and Dales Area Committee Presentation September 2010.
De Pere Aquatic Presentation
Task 2f – part a Prove that you can receive an WITH an attachment, open it AND save the attachment to your user area. Open the with the attachment.
Hotel Vadillo.
Protect Patcham Public Meeting 4 May 2016
It can be a portrait or landscape image
Click to add name of firm
Click to add name of firm
Entering Escape of Water Information
It can be a portrait or landscape image
It can be a portrait or landscape image
Click to add name of firm
It can be a portrait or landscape image
It can be a portrait or landscape image
Click to add name of firm
Presentation transcript:

For Our Kids Mission Beach Aquatic Facility For our Youth, Seniors, Visitors, For Us All Concept Designs So Far + MBARC’s View Click your mouse to move to next slide

What is a Reasonable Budget? MBCA thinks $3.5 million is fair and affordable and should provide a stage 1 facility that will meet a variety of the community’s needs so will be well used by our community

What Concept Designs Have Been Submitted to Date? Concept 2 See following slides including a cost estimate. This has a 6 lane 25m lap pool, some shade, a tots pool, cafe, deck and gym.

Concept Design 2: Cost Estimates 25m pool with swim out ledge$1,050,000 (32%) Kids pool$175,000 (5%) Shade structures (3)$135,000 (4%) Buildings (Amenities, Kiosk, Plant, Entry, Storage)$335,000 (10%) Gym$368,000 (11%) Restaurant, Deck, Store (Refurb old buildings)$265,000 (8%) Site prep, fences, paving, drains, landscape$235,000 (7%) Carpark surfacing$300,000 (9%) Consultants fees$192,000 (6%) Allowances for errors$205,000 (8%) Total$3,260,000

What Concept Designs Have Been Submitted to Date? Concept 1 See following slides. This is a staged design. Stage 1 has a lap pool, leisure pool, some shade, a tots pool and cafe.

Original ARGO Design Architects visited area twice 12 person community consultation group Evaluated all data: Needs Survey|Analysis Facility Needs Survey S&R Studies

What Facilities Do MBARC See Best Fit With Budget & Researched Community Needs? 1.A cool leisure pool is the number one stated need; 2.Including tots area in this and Learn to Swim water; 3.Next is a lap pool; 4.Moving water for kids (water-jet area); 5.Solar heating and shade for year-round water temperature control 6.Cafe, shade trees, grassy areas for relaxation, BBQ 7.On the wish list among other things are a movie screen and a dedicated LTS pool

What Changes Do We Recommend To Concept 2 Design To Achieve The Best $3.5m And Widest Possible Use Of The Facilities? 1.Add a leisure pool triangle (180m 2 area) on south side of lap pool; 2.Include tots area in this and use this pool for LTS; 3.Replace current old style tots pool with modern water-jets area; 4.Make shade cover the water area more; 5.Add solar heating for year-round pool temp control to maximise usage; 6.Magnesium water treatment plant; 7.Save up to $815,000 on Concept 2 to pay for the above spec.

Have Your Say Read “Aquatic 2010” a discussion paper available from MBARC or from the MBCA website before you do and have a say by ing MBARC with your ideas: Or write to us at MBCA Box 285 MB 4852

Thankyou for your interest Ken Gray & Coralie Kemp MBARC March 2010