12/17/01 Ron Sidwell 1 Run2b Datapath 17 Dec Update Bill Reay, Ron Sidwell, Noel Stanton, Russell Taylor, Kansas State University.

Slides:



Advertisements
Similar presentations
Twisted Pair Cable Dense assembly (OD 5-7 mm) with –Twisted pairs : total 21; 44-pin mm dual row Omnetics connector differential signals single-ended.
Advertisements

Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
I have almost 20 years experience in the components and devices used in industrial control, instrumentation and automation applications. Before I came.
Ecal Connection board and Motherboard design. Connection Board Motherboard.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
LV power cables for iTOP
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
ZTF Interconnecting Scheme Stephen Kaye
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
W. Freeman, D0 PMG 25-Feb-03 1 Run IIb Schedule Status u Schedule Status u Update on near-term equipment expenditures u Budgeting Update u Summary.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
AHCAL Electronics. Status and Outlook Mathias Reinecke AHCAL main Meeting D ESY Hamburg, Dec. 16th, 2014.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Mapping for Silicon Run IIb L. Bagby, A. Nomerotski, E. von Toerne December 2002
Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 1 Workshop  Workshop is to “Move beyond the Technical Design Proposal”  Many.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Oct 29, 2001 Ron Sidwell 1 Purple Card. Oct 29, 2001 Ron Sidwell 2 Purple Card Spec Two channels per printed circuit board Size ~20 sq. in. or best effort,
Questions on IFPAC_SCHEMATIC. Signal Chain Preamplifier Compensation Capacitor should go to –Vs, not GND Where is resistor For compensation Network? Does.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Andrei Nomerotski, Fermilab Silicon Electronics & Readout Silicon Electronics & Readout Andrei Nomerotski, D0/Fermilab April , Temple Review Overview.
1 P. Wilson DAQ Meeting 3/3/99 TDC Full Crate Test l Goal is to test TDCs in environment of full crate of cards äTests at Michigan limited to a few cards/crate.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Twisted Pair Cable A.Nomerotski 12/12/02  Dense assembly (OD 5-7 mm) with u Twisted pairs : total 21; 44-pin mm dual row Omnetics connector s differential.
Status of the Crystal Ball A.Starostin UCLA. Tasks in preparation for the polarized target experiments CB and the “cube” will be movable on rails – all.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
12/10/01 - Cecilia Gerber UIC Slide 1 Testing Card specifications l Will be used in the Run2b SASEQ-based test stands  needed. Build 75, two.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
Ron Sidwell 1 L0 Datapath Ron Sidwell, Noel Stanton, Russ Taylor The Kansas State University.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
Dzero Collaboration Meeting, Sept. 14, M. DemarteauEric Flattum - Fermilab 1 Slide 1 Alice Bean Fermilab/University of Kansas for the D0 Run2b silicon.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Mauro Citterio Milano, PP2/Services - an update - Mauro Citterio INFN Milano Type II cables  Layout in progress  Duplication of VVDC wires.
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
Mauro Citterio - Mi meeting
SVD Electronics Constraints
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
Calorimeter Mu2e Development electronics Front-end Review
Meeting on Services and Power Supplies
HPS Motherboard Electronic Design
ALICE Muon Tracking Upgrade EDR Answers
VeLo Analog Line Status
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
RPC FEE The discriminator boards TDC boards Cost schedule.
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

12/17/01 Ron Sidwell 1 Run2b Datapath 17 Dec Update Bill Reay, Ron Sidwell, Noel Stanton, Russell Taylor, Kansas State University

12/17/01 Ron Sidwell 2 Overall Layout

12/17/01 Ron Sidwell 3 Proposed Baseline(1) New adapter card (AC), with 4 hybrid channels per card. 2 X 37 X 3 cards at ends of calorimeter (222 total), one design for all silicon layers. Need adapter card pairs as in run2a, but ONLY for L0, L1. The 2 nd card is just a HV pass-thru with LEMO connectors. Keep IB for vital functions of clock shaping and PECL conversion, terminations (both ways) for single ended lines), and dvalid shaping and delay. SVX4 power will be routed thru the IB, as in Run 2a.

12/17/01 Ron Sidwell 4 Proposed Baseline(2) AVDD and DVDD are each regulated at the AC. Run the AC voltage (3.3v) directly to the AC, bypass the IB. Leave the clocks and clock cables as is. We know the present signal levels and cables do not perturb the calorimeter. Build a new J1 backplane for interface crates to allow simpler power fanout (bussed across multiple slots). Need to supply 4 voltages: AVDD, DVDD, and +15v and +5v for IB. Could combine AVDD and DVDD at this end. Leave HV on backplane, but only 8 lines instead of 16 (this path only works for L2-5). Retain 1553 connector.

12/17/01 Ron Sidwell 5 Junction Card Status Minor changes have been made in the conceptual layout (1 mm longer). Routing is in progress, expect ORCAD layout by 14 Jan. L2-L5 routing should be done by 2/15. PO target date- if vendor selected by 3/26/02- first articles by May. L0 schedule will trail by ~6 weeks. Critical path item is soldering of small wires into small holes. Propose to build proto board so FNAL techs can practice with twisted pair samples. Will have pads and holes only (no routing!). Need to understand location in experiment, size constraints, and mounting! DRAWINGS!

12/17/01 Ron Sidwell 6 L1 Junction Card Pads

12/17/01 Ron Sidwell 7 Adapter Card Status In LV regulation tests, we still see a 170mV spike when loads are switched. Will try some high value ceramic caps at the JC location next. Also trying to get samples of a surface-mount regulator from ON semiconductor, which has 3A output, and only <0.6v drop, and a control signal. Need $3K to buy a minimum order of Maybe CDF interested? Would cut heat load in half. Power connector needs to be fixed: propose (for 4-channel design) four 6-pin Omnetics type, with HV for L2-L5 using two of these pins, and SVX4 power the other four. HV for L0, L1: use a path independent of the adapter card. Use two-board design for these sensors, due to keep clear space needed at 1KV.

12/17/01 Ron Sidwell 8 Revised Adapter Card 4-chan Layout

12/17/01 Ron Sidwell 9 LV regulation so far (R. Taylor) Current sense scheme, LT1087 regulator. Spike is 244mV p-p. Need another factor of ~2 for safety I think. Work in progress- different caps, ON regulator.

12/17/01 Ron Sidwell 10 Purple card (for test stands) Cecilia has asked for 75 two-channel cards for the test stands. These would be similar in function to the new adapter card, but with different input and output connectors: 50- conductor cable in from SASEQ; and probably jumper cable out. This week- try to establish specification. Do we need to supply analog out for temperature for instance. Do we need a staging card (connector adapter module)? Probably, but this costs another $50K including the cables.