1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.

Slides:



Advertisements
Similar presentations
Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
Advertisements

1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
GlueX Collaboration Meeting, Newport News, October 25-27, 2007 GlueX Simulations Status Report Richard Jones GlueX Collaboration Meeting, Newport News,
Progress on Photon Beam and Simulation Part 1: active collimator Part 2: physics simulations Richard Jones, University of Connecticut GlueX collaboration.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
Experiment HUGS 2011 – Jefferson Laboratory Hussein Al Ghoul Department Of Physics Florida State University ᵠ.
20 October, 2004GlueX Detector Review 1 The GlueX Detector Curtis A. Meyer This talk Next talk.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
Software Overview David Lawrence, JLab Oct. 26, 2007 David Lawrence, JLab Oct. 26, 2007.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
SoLID EC Update Zhiwen Zhao 2012/05/22. Beam test update Coverage for PVDIS Road map.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
GlueX electronics Collaboration Meeting May, 2004 Paul Smith.
The GlueX Detector 5/29/091CIPANP The GlueX Detector -- David Lawrence (JLab) David Lawrence (JLab) Electron beam accelerator continuous-wave (1497MHz,
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
Mu2e WGM R. Ray Mu2e Project Manager Sept. 14, 2012.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Hall D Electronics Review (July 23-24) Elton Smith Hall D Collaboration Meeting August 4-6.
Opening Remarks Alex Dzierba GlueX/Hall D Collaboration meeting - Jlab - Dec 11-13, 2003.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
Curtis A. Meyer 20 May, 2004 GlueX Detector Infrastructure The issue of infrastructure includes details of how we assemble the detector as a whole. How.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Budget Status and FY03 Requests Elton Smith Hall D Collaboration Meeting Sep 12-14, 2002.
Curtis A. Meyer 13 December, 2003 The Detector Review Review the tracking and calorimeter elements Vertex Detector Straw Tube Chamber Forward Tracker Barrel.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
Results From the Radphi LGD Dan Krop 12/11/03. The Radphi Experiment Radphi Experiment Took Data in Jlab Hall B From May to July Hours Of Beam.
Status of E14 G.Y.Lim IPNS, KEK. E14 Experiment Step-by-step approach to precise measurement of Br( K L    ) KEK-PS E391a J-PARC E14 (Step-1) J-PARC.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
960 fadc tdc 2500 fadc 3240 fadc 168 fadc tdc 192 fadc tdc 2900 tdc fadc 40 fadc start 40 fadc tdc upv 21 fadc 5 Kbytes/event x 200 KHz level 1 =
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Status of the MICE Construction Project
Technical Design for the Mu3e Detector
East Hall under construction
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Preparations for a Lehman Review
Status, Misc Elton Smith Feb 21, 2003.
Preparation of the CLAS12 First Experiment Status and Time-Line
CLAS12 Timing Calibration
Electronics and DAQ Summary
X-Ray Endstations Update
JLEIC Engineering Status
Presentation transcript:

1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004

2 Focus on the following questions from the charge  Does the collaboration have a plausible plan for assembly and maintenance of the detector? Is the collaboration properly addressing issues of subsystem integration?  Does the collaboration have a sensible plan for management and are their estimates of manpower needs realistic? Also, does the collaboration have realistic milestones as they prepare for the CD-1 “Lehman” review and beyond to construction?

3 Matrioshka (Russian nesting dolls) site building electronics magnet detectors If you build them all separately, will they fit? If they fit, can they make music together?

4 Schematic layout

5

6 Civil construction timeline CD-0 CD-1 CD-2A, CD-3A CD-2B CD-3B Site Preparation Hall D Tagger building Tunnel

7 Interface issues  Mechanical  Detectors must fit together  Electrical  Grounding, power consumption, E&M waves  Environmental  Heat production, settling over time  Magnetic  Fringe field from solenoid, magnetic shielding effect on other detectors  Physics  Production of backgrounds

8

9 Space allocation for detectors  Some regions are more tightly constrained than others  In allocating space for each subsystem, we have grouped the detector into four regions, mostly independent  Upstream region – backwards veto  Target region – start counter, target  Inside magnet – Bcal, FDC and CDC  Downstream – Cherenkov, TOF and LGD

10 GlueX detector side view

11 3 Rollers Bolted to the Ring-girder Two concepts for Bcal installation Assembly outside of magnet Assembly in place Attached to yoke using ring-girders Details by Ravi Anumagalla

12 Chamber cabling and extraction  We need to maintain the relative alignment of tracking packages at the 100  level.  We need a system that verifies the alignment. (Note that in zero- field, the chamber calibrations will be significantly different than in full field.)  Details still need to be worked out!

13 Location of readout electronics Pb, CC, TOF FDC CDC Bcal, vertex 31 racks of readout electronics and auxiliary systems

14 Guidelines for maintenance  Identify and mitigate failure scenarios that require difficult access  Allow access to all systems without uncabling  Goal is to allow access to all systems in less than one day * All Sub Systems are separated by 1m

15 Signal interfaces SiPMs pre-amp post-amp / shaper cable Readout FADC or Disc, TDC source amplifier in base cable shaper Need interface documents for each detector detector electronics Example:

16 Critical paths CD-2A, CD-3A CD-2B CD-3B Site Preparation Hall D Solenoid installation Barrel construction Barrel installation Electronics

17 Manpower  GlueX collaboration is well organized and welcoming new members  Manpower at JLab  Plans for a Hall D group is under discussion at the highest levels  Support groups at the lab contribute substantial resources  Data-acquisition  Fast electronics  Computing center  Detector  Target

18 Staffing for Hall D FY05

19 Near term schedule Oct20-22GlueX detector review Oct2912-GeV project cost/schedule update DecInterim assessment of solenoid magnet JanUpdated GlueX Design Report Mar29Submission of CDR to DOE MayInternal cost/schedule/scope review Jun27Documents to Lehman Review Jul11-14Lehman review Note: DOE review of 12 GeV science program unscheduled

20 List of milestones?  Short term  Long term

21 Summary  Conservative technology choices for all systems – no showstoppers  Detector definition is (almost) complete  Space for Cherenkov detector allocated, but no final decisions on technology  Each aspect of the experiment is being reviewed in turn (electronics, detectors, magnet, …)  Budget profile for 12-GeV project is required as input to schedules and staffing plan  Progress will likely be limited by the budget profile

22 Extras

23 Charge to the committe  Is the GlueX detector design sound? Are there any special areas of concern that deserve special study?  Does the collaboration have a sensible plan for management and are their estimates of manpower needs realistic? Also, does the collaboration have realistic milestones as they prepare for the CD-1 “Lehman” review and beyond to construction?  Are there design studies and/or prototyping efforts that, if undertaken in a timely manner, could strengthen the estimates of performance and cost of the planned experiment? Are each of the studies currently in progress given the appropriate priority at this stage?  Does the collaboration have a plausible plan for assembly and maintenance of the detector? Is the collaboration properly addressing issues of subsystem integration?  Are there technologies or developments which we have overlooked that may allow cost savings and/or improved technical performance?

24 Preliminary cost estimates CD-0CD-1CD-2CD-3CD-4TotalConstr Civil Construction Beamline Solenoid Detector Tracking Start Counter Barrel Calorimeter Cerenkov Counter Forward Calorimeter Time-of-Flight Wall Computing Electronics Hydrogen Target Photon Tagger Assembly Total

25 Civil construction timeline

26 Critical Paths

27 Electronics TDCs, ADCs timeline *** Electronics Review Estimate ***