ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007.

Slides:



Advertisements
Similar presentations
Introduction to Switchgear
Advertisements

Copyright© Voltimum Experts – not to be reproduced without prior consent of Voltimum UK Voltimum Expert Topic – Power Harmonics.
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
QUALITY AND TECHNOLOGY
Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
Understanding electrical networks to enhance their protection ? Situate the protection relay Ask the customer the right questions Duration: 43:35 min Expert:
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
WATERLOO ELECTRICAL AND COMPUTER ENGINEERING 60s: Power Engineering 1 WATERLOO ELECTRICAL AND COMPUTER ENGINEERING 60s Power Engineering Department of.
Mississippi State University Intro to Electrical & Computer Engineering P ower S ystem Application Laboratory (PSAL) September 25, 2003 Schweitzer Engineering.
Long shutdown 2013: Electrical distribution activities 09/03/2012 IEFC 2012 Workshop F. Duval on Behalf of EN/EL group.
CIGRE 7-10 September 2009, Moscow
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
Generator Protection. Amount of Protection Rated power of the generator Ratio of its capacity to the total capacity of the system Configuration of the.
1 PCA2 On-load Protection Condition Analyser. 2 PCA2 online testing concept Concept introduction: PCA2 is a new system test approach intended to save.
Basic Electricity.
Electrical power distribution in experiments W.Iwanski.
Electro-Pneumatics Module 1
Preliminary Studies of the Electric Power Distribution for CLIC
1 Some Issues about Big Data in Power Grid Gary Quan.
BLACKOUT POWER OUTAGE By Masih Madayeni Class 3/6 English Presentation.
Adaptive Protection of Distribution Feeders Alexander Apostolov, Benton Vandiver.
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
POWER SYSTEM PROTECTION. Power system Generators Transformers Transmission lines »Underground cables »Overhead lines Distribution systems.
Electrical Distribution Training
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
112/09/2013. Summary  Events on the network  Incidents  Network reconfigurations  Network operation  Update on activities  Tests  Projects and.
Electrical Distribution Training
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Voltimum Expert Topic – Power Harmonics. What are Harmonics? They are waveforms with frequencies that are multiples of the fundamental frequency (Typically.
NSTX Centerstack Upgrade: initial discussions of the Machine Protection System (MPS) Robert Woolley 4 November 2009.
Need for protection Power system must be kept in operation continuously without major breakdowns This can be achieved in two ways: 1.Implement a system.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
EE 445 Course Presentation Power System Protection
Electromagnetic Compatibility Test for CMS Experiment. Authors C. Rivetta– Fermilab F. Arteche, F. Szoncso, - CERN.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
Protection & Switchgear
Power Plant Construction and QA/QC Section 4.3 – Electrical Interconnections Engineering Technology Division.
Distribution network fault on LHC1 10/07/2011 F Duval, G Cumer on behalf of EN/EL 10/07/11.
What is POWERGRID??? The Power Grid Corporation of India Limited (POWERGRID), is an Indian state-owned electric utilities company headquartered in Gurgaon,
Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona May ASSESSMENT OF PROTECTION SCHEMES: A KEY FACTOR FOR RELIABILITY.
Cheng-Ting Hsu Presenter: Cheng-Ting Hsu Cogeneration System Design for a High-Tech Science-Based Industrial Park Department of Electrical Engineering.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Power Quality Karsten KAHLE Electric Power Converter Group (TE-EPC) High Power Converter Section Review of CERN’s Electrical Power Network October.
A common 400 Hz AC Power Supply Distribution System for CMS FEE. Authors C. Rivetta– Fermilab. F. Arteche, F. Szoncso, - CERN.
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
A second Thyristor Controlled Static Var Compensator for SPS
Sub-Synchronous Frequency Detection Using SEL OGIC ® Control Equations SSF Relay ERCOT Workshop NPRR562 Subsynchronous Resonance Larry Gross.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
POWER QUALITY AND NETWORK DISTURBANCES in CERN’s electrical network K. KAHLE, TS-EL Diploma students R. Sternberger, M. Neubert 1 st TS Workshop Archamps,
Frankfurt (Germany), 6-9 June 2011 Romanens – CH – S3 – 0220 Impact of Distributed Generation on Grid Protection BKW FMB Energie AG Switzerland Florian.
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
1 PEBB-based Power Electronic Systems to Support MVDC Studies Herbert L. Ginn III, Mississippi State University.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
Design a protection System of 220/33kV Grid Station United Arab Emirates University College of Engineering Saif Mohammed AL Aryani Ahmed Soruor.
YETS & LS2 Works EN-EL / Power distribution
Session 1: Major Events in 2006
Situation of the Static Var Compensators at CERN.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
YETS & LS2 Works EN-El on LHC / Power distribution
Background B513 built in early 1970’s for mainframe era.
the high-voltage network of CERN ToMORROW
the CERN Electrical network protection system
TCM PS – SPS Thyratron Power Trigger Consolidation
YETS & LS2 Works EN-EL / Power distribution
F Duval, on behalf of EN/EL
POWER SYSTEM ANALYSIS INTRODUCTION.
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Presentation transcript:

ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007

 Introduction  Selectivity  CERN HV electrical  29 th July 2006  Selectivity at CERN  Project Planning José Carlos GASCON ATC/ABOC Days Prepared by José Carlos GASCON ATC/ABOC Days 22 January 2007 Summary

Introduction Switchgear Protectedarea Protectiverelay Measurement Order SensorSource  Protection system in the electrical network   Switchgear: in charge of clearing faults   Sensors: providing measurements to detect faults   Protective relays: processing measurements and ordering to clear faults

 Why protection system is needed   Personnel safety against electrical hazards   Avoid equipment stress: thermal, electrical and mechanical damages   Assure network stability   Clear electrical faults and maintain service continuity  Features of protection system   Fast   Reliable   Selective José Carlos GASCON ATC/ABOC Days Prepared by José Carlos GASCON ATC/ABOC Days 22 January 2007 Introduction

 Definition   Discrimination between protection systems, isolating a faulty area of the electrical network as quickly as possible and leaving all the fault-free areas energized  How to do   Time based discrimination   Current based discrimination   Logic discrimination   Directional protection discrimination   Differential protection discrimination   Combined José Carlos GASCON ATC/ABOC Days Prepared by José Carlos GASCON ATC/ABOC Days 22 January 2007 Selectivity

 Parameters   The complexity and size of the electrical network   Network architecture   Existing sources and their response in the event of a fault   Operating time of each protection system   Backup time   Compromise continuity of service vs. degree of protection José Carlos GASCON ATC/ABOC Days Prepared by José Carlos GASCON ATC/ABOC Days 22 January 2007 Selectivity

Selectivity: examples ! ! ! ! ! ! ! !! !! ! ! ! ! ! ! Radial distribution Loop distribution (ex.: SPS)

 Complexity   Voltage levels: 400kV, 130kV, 66kV, 20kV, 18kV and 3,3kV   94 HV substations: 38 LHC, 26 SPS and 30 Meyrin   4 sources : EDF (400kV & 20kV), EOS and Diesel Generators   3 different interconnected networks by site: o o LHC: Machine, General Services and Safety (Assured) o o SPS: Pulsed, Stable and Safety (Assured) o o Meyrin: Pulsed, General Services and Safety (Assured)   Sites interconnected by 18kV links   Power flow direction depending on the configuration   About 1,000 protective relays and switchgears   Compensators and harmonic filters   Diversity of loads: pumps, converters, dipoles, transformers, compressors José Carlos GASCON ATC/ABOC Days Prepared by José Carlos GASCON ATC/ABOC Days 22 January 2007 CERN HV Electrical Network

 Protection system   Switchgears from all ages: specific clearing time for each generation   Different technologies in protective relays 40% digital, 40% electronics and 20% electromechanical José Carlos GASCON ATC/ABOC Days Prepared by José Carlos GASCON ATC/ABOC Days 22 January 2007 CERN HV Electrical Network

  1 ph. fault detected in neutral reactance   3 ph. detected by all prot. but blocked José Carlos GASCON ATC/ABOC Days Prepared by José Carlos GASCON ATC/ABOC Days 22 January th July 2006 (I) ! ! ! ! ! 1 st fault events   Protections trip 66kV and 130kV sources

  3 ph. detected by all prot. but blocked José Carlos GASCON ATC/ABOC Days Prepared by José Carlos GASCON ATC/ABOC Days 22 January th July 2006 (II) ! ! !! 2 nd fault after “autotransfer system”   Protection trips at 66kV source ! ! !

 Power cuts   LHC General Services   SPS Stable loop   North Area Stable loop   Meyrin site: West Area and PS, ISOLDE and Administrative loops  After analyse of the event   Difficult selectivity between 66kV and 18kV levels   Backup time not adapted for this scenario   If selectivity, power cut reduced to the Meyrin site and lower reestablishment time José Carlos GASCON ATC/ABOC Days Prepared by José Carlos GASCON ATC/ABOC Days 22 January th July 2006: consequences

José Carlos GASCON ATC/ABOC Days Prepared by José Carlos GASCON ATC/ABOC Days 22 January th July 2006: selective ! !! ! !

José Carlos GASCON ATC/ABOC Days Prepared by José Carlos GASCON ATC/ABOC Days 22 January 2007 Selectivity at CERN  Implemented selectivity   400kV backup agreed with EDF   LHC General Services and Machine   SPS pulsed and stable loops   PS, ISOLDE and Administrative loops  Non-selective areas (tripping 66 kV)   Autotransfert system (BE9, SEM12 and ME9 substations)   West Area   North Area   LHC-1 and LHC-5 (in project)

José Carlos GASCON ATC/ABOC Days Prepared by José Carlos GASCON ATC/ABOC Days 22 January 2007 Planning (I)  Activities in progress   Catalogue of protective relays: 60% completed   Short circuit calculations: under approval  Selectivity Phase 1 (April 2007)   Selectivity study for the non-selective areas   Data base for all protective relays installed   Provisional solution for the non-selective areas

José Carlos GASCON ATC/ABOC Days Prepared by José Carlos GASCON ATC/ABOC Days 22 January 2007 Planning (II)  Selectivity Phase 2 (January 2008)   Definitive solution for non-selective areas   Complete selectivity map for main substations and configurations   Implementation   Commissioning  Selectivity Phase 3 (in the course of 2008)   Selectivity map for the whole CERN HV network   Transient simulations for main substations (BE, BE9, ME10, ME9, SEM12)

ABOC/ATC days Electrical Network: Selectivity and Protection Plan José Carlos GASCON TS–EL Group 22 January 2007 Questions?