Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona 12-15 May 2003 1 ASSESSMENT OF PROTECTION SCHEMES: A KEY FACTOR FOR RELIABILITY.

Similar presentations


Presentation on theme: "Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona 12-15 May 2003 1 ASSESSMENT OF PROTECTION SCHEMES: A KEY FACTOR FOR RELIABILITY."— Presentation transcript:

1 Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona 12-15 May 2003 1 ASSESSMENT OF PROTECTION SCHEMES: A KEY FACTOR FOR RELIABILITY Alain SCHENK David ORZAN Fritz GANTENBEIN Markus VON ARX BKW FMB Energy Ltd. Switzerland BE JU BL SO NE

2 Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona 12-15 May 2003 2 Assessement of protection: Why ? Liberalization  Cost reduction  High quality of supply (reliability)  risk management, condition based maintenance  Less security margin  More faults are expected than before New possibilities improve the reliability of protection  Numerical relays (new schemes for specific situations)  Calculation programs  Testing devices

3 Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona 12-15 May 2003 3 Numerous network configurations  Systematic study of main and back up protection reliability  Best compromise for relay settings (selectivity vs. security)  Overview of the protection reliability of the whole system Relay operation check  Relay settings and behaviour check (with transient signals)  Feasibility studies (simulation of different configurations)  Better understanding Case Studies  Simulation for a multiterminal line  Dynamic Relay testing with a fault recorder event  Fault between 16 Hz 2/3 and 50 Hz systems Assessement of protection: How ? Tools  Event of fault recorders  Periodic relay testing  Calculation programs  Dynamic relay testing

4 Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona 12-15 May 2003 4 Simulation for a mutliterminal line Problems  Relatively short line (15 km)  selectivity  High short circuit currents and quite well interconnected network  No signalling equipment  Inhomogeneous lines  Industrial plants  own generation capabilities or supply by other networks T A B

5 Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona 12-15 May 2003 5 T A B C T A B C Simulation for a mutliterminal line With embedded generator (Industry customer) Without embedded generator (Industry customer)

6 Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona 12-15 May 2003 6 Transient simulations results Problem Dynamic relay testing Fault recorder events  Incorrect relay operation  Did the relay maloperate or were the settings incorrect ?  check of relay behaviour  check of relay settings

7 Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona 12-15 May 2003 7 Dynamic relay testing Current Voltage (faulted phase) Voltage (healthy phase)  Unstable operation of the relay could be confirmed Earth fault in an isolated neutral network (50 kV)

8 Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona 12-15 May 2003 8 Dynamic relay testing 50 Hz 16 Hz 2/3  50 Hz and 16 Hz 2/3 on the same tower  Does the relay trip when a short circuit occurs between the two systems ? Transient simulations results  simulation of events  check of relay settings Problem

9 Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona 12-15 May 2003 9 Dynamic relay testing 0.000.050.100.150.200.250.30 [s] -30 -20 -10 0 10 20 30 [kA] Earth contact  Tripping unreliable without earth contact  teleprotection 0.000.050.100.150.200.250.30 [s] -30 -20 -10 0 10 20 30 [kA]

10 Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona 12-15 May 2003 10 Conclusion Situation  Protection assessment is necessary because of the reduced security margin due to cost pressure  Protection assessment can be significantly improved through simulations and dynamic testing Advantages of the proposed approach  Reduced investigation time  low cost  Consideration of all scenario and aspects  high quality  Study of complicated situations  deep understanding


Download ppt "Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona 12-15 May 2003 1 ASSESSMENT OF PROTECTION SCHEMES: A KEY FACTOR FOR RELIABILITY."

Similar presentations


Ads by Google