Key Customer ChallengesCustomer Pain Points How You can Help the CustomerProductsSolutionsServices Increasing Density Difficult to maintain 300 cfm per.

Slides:



Advertisements
Similar presentations
Assess > Plan > Deliver > Sustainon365.co.uk. Assess > Plan > Deliver > Sustainon365.co.uk Electrical Review PowerOn Briefing You cant save money until.
Advertisements

1© Copyright 2014 EMC Corporation. All rights reserved. Results Lower operating costs Expect savings of $500K over three years Foundation laid for Software-Defined.
Zycko’s data centre proposition The very best products and technologies Focus on what your customers need Turning products into solutions Wide range of.
Large Data Centers Small & Medium Data Centers Computer Rooms & Closets Network-Critical Physical Infrastructure Presented by Ian P. de la Rosa Enterprise.
Cooling Product Positioning
Introduction to Unitas Global Managed IT Infrastructure Service Provider February 2012 North America Los Angeles, USA
Application Delivery to the Enterprise Jeremy Holt Director of Information Services.
Achieving Data Center Availability along with Efficiency by Management Systems Shimon Katz, Data Center Project Manager ELECTRICITY 2012 – Eilat, Israel.
Overcoming the challenge of virtual blindness Colin Richardson on365 Ltd.
Green Cloud Computing Hadi Salimi Distributed Systems Lab, School of Computer Engineering, Iran University of Science and Technology,
1 © 2009 Cisco | EMC | VMware. All rights reserved. Virtual Computing Environment Accelerating Deployment of the Private Cloud Cisco and EMC, together.
VMware Virtualization Last Update Copyright Kenneth M. Chipps Ph.D.
Virtualizing Enterprises: Challenges Harrick M. Vin Vice President and Chief Scientist Tata Research Development and Design Centre, Tata Consultancy Services.
Session Agenda Introducing the Serverquarium for 2013.
Data Centre World Expo 2009 Designing, building and operating high density data centres Kevin Sell Head of Technical Facilities, Telstra International.
Copyright 2009 FUJITSU TECHNOLOGY SOLUTIONS PRIMERGY Servers and Windows Server® 2008 R2 Benefit from an efficient, high performance and flexible platform.
Whiteboard Message for Cloud Computing Answering End user questions in 5 minutes with a white board 1.What is Cloud Computing? 2.How does Cloud computing.
Commonwealth of Massachusetts Statewide Strategic IT Consolidation (ITC) Initiative ITD Virtualization and Shared Services Executive Briefing Presentation.
Schneider Electric IT Business North America Advancing Date Centers around Life Cycle Management. May 2011.
T HE M ETHOD AND T OOL OF C OST A NALYSIS FOR C LOUD C OMPUTING X INHUI L I Y ING L I T IANCHENG L IU J IE Q IU F ENGCHUN W ANG Presented By Sneha Arvind.
1 AFCOM 2011 studyAFCOM 2011 study 2 Information Week 2011 surveyInformation Week 2011 survey 3 Worldwide Executive Council 2011 survey on 100 CIOsWorldwide.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens.
All content in this presentation is protected – © 2010 American Power Conversion Corporation InfraStruxure ™ Management Software Eduard Bodor Senior System.
A Connected World in transformation NICE – DATACENTRES 2012 May 23 rd 2012 Paul-François CATTIER Global Data Centre Solution VP.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
© 2012 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1 Cisco CloudVerse for Government: Helping Agencies Reduce Costs and Respond.
Data Center Consolidation & Energy Efficiency in Federal Facilities
CSG Panel – May 10, 2006 Key Lessons for New Data Centers Project overview Requirements Lessons learned Going Forward.
Extreme Networks Confidential and Proprietary. © 2010 Extreme Networks Inc. All rights reserved.
MANIT WEB HOSTING SERVICES Presented by - Sandeep Jain & Devesh Lal CRISP, Bhopal.
Cisco Confidential 1 © 2010 Cisco and/or its affiliates. All rights reserved. Data Center Solutions Marketing Data Center Business Advantage Customer Proof.
Schneider Electric 1 Foundational BUSINESS OVERVIEW Rev 2 Virtualization and physical infrastructure – Integrations with Microsoft and VMware.
Copyright 2009 Fujitsu America, Inc. 0 Fujitsu PRIMERGY Servers “Next Generation HPC and Cloud Architecture” PRIMERGY CX1000 Tom Donnelly April
Lets agree that an Optimized Data Center is not yet a Cloud +=
Designing the Building of the Future Practical Experience in IT Deployment Collaborate to Accelerate.
System Management for Virtualization and Automation in a Dynamic Data Center SVM’08 Munich Karsten Beins, Sen. Director Infrastructure Technology.
Energy Usage in Cloud Part2 Salih Safa BACANLI. Cooling Virtualization Energy Proportional System Conclusion.
MDC-B350: Part 1 Room: You are in it Time: Now What we introduced in SP1 recap How to setup your datacenter networking from scratch What’s new in R2.
© 2014 VMware Inc. All rights reserved. vSphere Optimization Assessment Presenter Name.
©2013 – JouleX Enterprise Energy Management Quickly identify energy waste Reduce energy usage and costs Lower carbon emissions Agentless, network-based.
VMware View built on FlexPod Flexible IT Infrastructure for Desktop Virtualization.
Lets agree that an Optimized Data Center is not yet a Cloud +=
Jon Walton Director of Technology Bay Area Technology Forum November 5, 2009 Technology Consolidation: Fact or Fiction.
LegendCorp What is System Center Virtual Machine Manager (SCVMM)? SCVMM at a glance Features and Benefits Components / Topology /
Cloud Strategy made Simple David G. Fletcher. 2 Hybrid Cloud Approach Utah is building a private cloud to provision services from its virtualized infrastructure.
Accounting for Load Variation in Energy-Efficient Data Centers
Optimizing Power and Data Center Resources Jim Sweeney Enterprise Solutions Consultant, GTSI.
Ulrich (Uli) Homann Chief Architect, WW Enterprise Services Microsoft Corporation SESSION CODE: ARC305.
Hello Cloud… Mike Benkovich
All content in this presentation is protected – © 2008 American Power Conversion Corporation Row Cooling.
1 EIT 2.2 Is your company missing out on the cost-savings opportunities offered by data center consolidations? Andy Abbas Co-Founder and Vice President.
1 Implementing a Virtualized Dynamic Data Center Solution Jim Sweeney, Principal Solutions Architect, GTSI.
Monitoreo y Administración de Infraestructura Fisica (DCIM). StruxureWare for Data Centers 2.0 Arturo Maqueo Business Development Data Centers LAM.
InfraStruXure Systems Alex Tavakalov
Why Dell Servers Customer-inspired design, industry-leading innovation.
CCI BUSINESS James W. Yates, MBA Regional Solutions Engineering Manager.
© 2013 VCE Company, LLC. All rights reserved. Nigel Moulton : Office of the CTO EMEA Focus on Business not infrastructure.
FusionCube At-a-Glance. 1 Application Scenarios Enterprise Cloud Data Centers Desktop Cloud Database Application Acceleration Midrange Computer Substitution.
Extreme Scale Infrastructure
READ ME FIRST Use this template to create your Partner datasheet for Azure Stack Foundation. The intent is that this document can be saved to PDF and provided.
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
DC Market Trends and the key focus areas within
UnixBench System Score
Greening Your Information Systems
CCNET Managed Services
Modular Edge-connected data centers
Modular Edge-connected data centers
Modular Edge-connected data centers
Presentation transcript:

Key Customer ChallengesCustomer Pain Points How You can Help the CustomerProductsSolutionsServices Increasing Density Difficult to maintain 300 cfm per floor tile required for most Blade Chassis I will optimize Datacenter Cooling PerformanceClose Coupled AC Active Response Cooling Controls with DCIM tools EMS STEP 1 and 2 Blade Chassis require different plug types and amperage I will maximize Power availability and TCO Outlet Metered Rack PDUs, Modular PDU Real time monitoring and trending of consumption by outlet or branch circuit EMS STEP 1 and 2 "Brute-force" perimeter cooling strategy will eat into CAPEX quickly I will optimize your Datacenter ArchitectureClose Coupled AC Active Response Cooling Controls DCIM tools (Airflow calculations) EMS STEP 1 and 2 Adding Branch circuits will require additional breakers, different PDUs, and down time I will provide a scalability strategy Modular PDU Outlet Metered Rack PDUs. Sporadic hot-spots concurrent with server loading events I always support dynamic environments easilyClose Coupled AC, NMC Server vendors are introducing higher supply voltages I have Market research and Analysis data to foresee the trends UL Listed 415V/240Y equipment Datacenter hardware weight gains require floor loading analysis I leverage Engineering and Design resources the competitors do not have Tradeoff tools, EDG, ISX Designer PEC execution services Dynamic Power and Cooling Must manage server power by use of power-capping, implemented by the VM or DCIM I offer the only Vendor Neutral DCIM suiteCapacity Manager VM manager needs data on on power, cooling and physical space I offer the only open architecture DCIM suiteNMC, Capacity manager Real time VM, power, cooling and physical space metering VM manager needs to make decisions about where to place or move VMs. I offer the only Vendor Neutral DCIM suite VMM integrated Capacity Manager Real time availability, capacity, and redundancy data for the datacenter Dynamic data centers now require dynamic capacity I provide dynamic data standard on my offerNMC, Capacity Manager Dynamic cooling response controls based on in-situ and trended usage in the data center

Key Customer ChallengesCustomer Pain Points How You can Help the CustomerProductsSolutionsServices Rapid Scalability is Business Critical Speed of provisioning physical and virtualized servers is super fast I provide DC Growth and scalability strategy Symmetra, Modular PDU, Close Coupled AC, ISX Capacity growth at the speed of their business I can get a server in a day, it can take weeks add power and cooling I provide accelerated speed of deployment Symmetra, Close Coupled AC, racks, ISX Data center location is based on power, fiber, and talent availability and cost I leverage Solution architects, Partners and Vendors owned ServiceAPC Partner Program Elite Data Center Partners, Employee Service operations team. Design build project services Hosted and MTDC facilities may not have vacancy in my preferred location I leverage relationships with Hosting and cloud providers that competitors cannot Cloud and hosting testimonials Availability Architecture Changes Cloud Computing moves redundancy to the software, but requires better DCIM I provide the only integrated DCIM and DCFM suite Struxtureware for Datacenters Redundancy via the cloud moves management tasks from the facility to the SLA My portfolio of products solutions and services are what the Cloud providers use. Struxtureware for Datacenters Infrastructure management has decreased, but reliance on effective DCIM management tools becomes critical I will help you mitigate risks for software and machine redundancy architecture design Struxtureware for Datacenters DCIM and DCFM suite of tools balanced with the highest level of uptime availability at the lowest total cost of ownership. Will a cloud provider pass the Cost, footprint, and OPEX savings from 2N to N+1 to me? I offer the same capacity monitoring and metering solutions the cloud and hosting providers use Struxtureware for Datacenters Physical servers are now a capacity element just like power and cooling I ensure oversizing of useful capacity or stranding power, cooling or floor space is optimized to your business needs. ISX, Symmetra, NMC, Struxtureware for Datacenters.