Summary of SGIP PAP2 2011 Activities since October 2011 Mingxi Fan TR-45.5 Liaison to SGIP PAP2 858-845-3609 December 5 th, 2011 ©2011.

Slides:



Advertisements
Similar presentations
Doc.: IEEE r2 Submission November 2009 Bruce Kraemer, MarvellSlide 1 Wireless Characterization for NIST PAP#2 Date: Authors:
Advertisements

GSC-13 Presentation TR-45.5 Spread Spectrum Digital Technology -- Mobile and Personal Communications Standards.
Fostering worldwide interoperabilityGeneva, July 2009 GSC-14 Presentation Source: TIA TR-45.8 Core Networks - Mobile and Personal Communications.
Fostering worldwide interoperabilityGeneva, July 2009 Global Standards Collaboration (GSC) 14 DOCUMENT #:GSC14-GTSC7-005R1 FOR:Presentation SOURCE:TIA.
DOCUMENT #:GSC16-PLEN-xx FOR:Presentation SOURCE:TIA AGENDA ITEM:OPENING PLEN X.1 CONTACT(S): Fran O’Brien Mark Epstein.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Continuing Cooperation on IMT Standardization Mark Epstein Senior Vice President Qualcomm Document.
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC Closing Report– January 2012 Date: 19 January 2012 Discussion topics.
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– January 2012 Date: 18 Janaury 2012 Discussion topics during November.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Gale Lightfoot, Senior Staff Program Manager, Office of the CTO, SPB Cisco ATIS and the Smart Grid.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
© 2005 Global Grid Forum The information contained herein is subject to change without notice Leading the pervasive adoption of grid computing for research.
Report – SeON WG GISFI #8 GISFI # 08, Mar 26-28, 2012, Patna Chair: Parag Pruthi (NIKSUN) Chair-Delegate: Ashutosh Dutta (NIKSUN) Vice-Chair: Debabrata.
Smart Grid Interoperability Panel & ISO / RTO Council Smart Grid Projects David Forfia SGIP Governing Board Member – Stakeholder Category 21 ISO/RTO Sponsor.
Summary of SGIP PAP2 Activities since April 2012 Mingxi Fan, Alex Gogic, Jing Sun TR-45.5 Liaison to SGIP PAP June 11 th,
SMART GRID INTEROPERABILITY PANEL PRIORITY ACTION PLAN 2 WIRELESS COMMUNICATIONS DEC 6, :00 AM MOUNTAIN FACE-TO-FACE PHOENIX, AZ ROOM 162 WEBINAR.
Doc.: IEEE /1542r0 Submission November 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– November 2011 Date: 08 November 2011 Discussion topics.
Doc.: IEEE /1112r0 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 10 August 2011 Discussions during.
DOCUMENT #:GSC15-XXXX-nn FOR:Presentation or Information SOURCE:TIA AGENDA ITEM: CONTACT(S): Fran O’Brien
1 ITU-R Liaison Group Report - Session #67 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0046.
1 ITU-R Liaison Group Report - Session #66 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0030r1.
Cellular TDD in TIA Eric Jacks LinkAir Communications TIA TR45 Meeting Ft. Lauderdale, FL March 5, 2003 Notices: The contributor grants.
DOCUMENT #:GSC16-PLEN-xx FOR:Presentation SOURCE:TIA AGENDA ITEM:OPENING PLEN X.1 CONTACT(S): Fran O’Brien Mark Epstein.
Jeju, 13 – 16 May 2013Standards for Shared ICT TIA TR-50 M2M-Smart Device Communications Dr. Jeffery Smith Chief Innovation and Technology Officer/EVP.
GSC-14 Presentation TIA TR-45.5 Spread Spectrum Digital Technology -- Mobile and Personal Communications Standards.
Fostering worldwide interoperability Emergency Communications TIA DEL DOCUMENT #:GSC14-PLEN-007 TIA Emergency Communications FOR:Presentation GSC-14 SOURCE:TIA.
Doc.: IEEE /1340r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC–Closing Report- September 2011 Date: 22 September 2011.
TSG-S Project Coordination Recommendations Nick Yamasaki TSG-S Chair ABSTRACT: This document presents TSG-S recommendations for improved coordination of.
Doc.: IEEE /1112r2 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 17 August 2011 Discussions during.
Advanced Metering Implementation Team (AMIT) Update to RMS Presented by Christine Wright September 21, 2011
Summary of SGIP PAP Activities since October 2011 Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP April 16 th, 2012.
IEEE 802 Smart Grid Adhoc. SGIP SGIP formed in 2009 by NIST – Provide support to meet requirements of Energy Independence and Security Act of 2007 (EISA)
ITU-R Liaison Group Report - Session #64 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127 Date.
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
Machine-to-Machine(M2M) Communication for cdma2000 Systems Orlett W. Pearson, 3GPP2 Liaison Report to TR-50 August 2012.
DOCUMENT #:GSC15-PLEN-52 FOR:Presentation SOURCE:ATIS AGENDA ITEM:PLEN 6.11 CONTACT(S):Maria Estefania ATIS and.
ProjectIEEE Working Group on Mobile Broadband Wireless Access TitleLiaison relationships with external organizations.
Doc.: IEEE /0004r0 Submission Jan 2016 Andrew Myles, CiscoSlide 1 Next steps for IEEE as an IMT-2020 technology? 18 Jan 2015 Authors: NameCompanyPhone .
C Title: Next Steps for Femtocells Date: 03 December 2007 Source: Airvana, Alcatel-Lucent, Nortel Abstract:The contribution addresses.
0 Peter J MacLaren 6Sep2001 & 5Dec2002 Recommended Action Plan for endorsement by WCD Noting prior recommendations to:  Support the international process,
Fostering worldwide interoperabilityGeneva, July 2009 GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration.
Jeju, 13 – 16 May 2013Standards for Shared ICT Telecommunications Standards for Smart Grids David Su National Institute of Standards and Technology Document.
1July 12th, 2002 S00VISION Update of Vision Issues in ITU-R WP 8F Christine Di Lapi Motorola Inc. Global Government Relations PH:
Jeju, 13 – 16 May 2013Standards for Shared ICT Update from TR-45.5 on IMT Standardization Dr. Francis O’Brien Senior Director Alcatel-Lucent Document No:
Jeju, 13 – 16 May 2013Standards for Shared ICT Dr. Farrokh Khatibi Director of Engineering Qualcomm ATIS and the Smart Grid Document No: GSC17-PLEN-63.
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
Summary of SGIP PAP2 Activities Update as of August 2012 Alex Gogic, Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): Smart Grid Standardization Activities TIA TR-45.5 Input Smart.
Continuing Cooperation on IMT Standardization
TIA M2M Standards Update TR-50 Smart Device Communications
HIS Smart Grid – Summary (1)
Update from TR-45.5 on IMT Standardization
Standards for Shared ICT
Wireless Characterization for NIST PAP#2
NIST Framework and Roadmap for 5
Smart Grid SC– January – NIST PAP2 Name Company Address Phone
TIA Liaison Report January 2006
Wireless Characterization for NIST PAP#2
Smart Grid SC–Closing Report- September 2011
Smart Grid ad hoc – July – SGIP 2 - NIST PAP2 3- ITU Liaison
ITU-R Liaison Group Report - Session #65 Opening Plenary
Global Standards Collaboration (GSC) GSC-15
TIA TR-50 M2M-Smart Device Communications
ITU-R Liaison Group Report - Session #65 Opening Plenary
GSC IMT Task Force Report
Continuing Cooperation on IMT Standardization
Continuing Cooperation on IMT Standardization
Telecommunications Standards for Smart Grids
NIST Framework and Roadmap for 5
Presentation transcript:

Summary of SGIP PAP Activities since October 2011 Mingxi Fan TR-45.5 Liaison to SGIP PAP December 5 th, 2011 ©2011 Third Generation Partnership Project Two (3GPP2).All rights reserved. Permission is granted for copying, reproducing, or duplicating this document only for the legitimate purposes of 3GPP2 and its organizational partners. No other copying, reproduction, or distribution is permitted. Kona, HIC

PAGE 2 General Background: PAP2 in SGIP Smart Grid Interoperability Panel Priority Action Plan 2 works on wireless technologies for smart gridSmart Grid Interoperability PanelPriority Action Plan 2 In January 2011, PAP2 approved a document summarizing its work in 2010, “Guidelines for Assessing Wireless Standards for Smart Grid Applications.”Guidelines for Assessing Wireless Standards for Smart Grid Applications –Guidelines’ main content is a discussion of wireless air interface modeling –Specific technology performance in that document is from the respective SDOs in the Annex A through E: Wi-Fi, LTE, HSPA, cdma2000, and WiMAX In 2011, PAP has been focusing on the evaluation of wireless technologies –In the SGIP Catalog of Standards, none of the cellular standards have been “identified.” cdma2000 1x and HRPD are listed under the “under review” section.Catalog of Standards 2 C

PAGE 3 Wireless Technology Evaluation in PAP2: Wireless SDOs The PAP2 SDO subcommittee, consisting of representatives from IEEE , ATIS, TIA TR45.5, and WiMAX Forum, continues to develop technology assessment methodology –The group meets every Monday 9:00 to 10:30 a.m. PST –The goal of this group is to update the NIST IR 7761 Guidelines for Assessing Wireless Standards for Smart Grid Applications, with a focus on the wireless communication aspects –SDO subcommittee reports progress to PAP2 during biweekly PAP2 calls Recent focus of the PAP2 SDO subcommittee is to complete chapters 4, 5, and 6 of the guideline document –Chapter 4: wireless technology descriptions correspond to “Wireless Functionality and Characteristic Matrix for the Identification of Smart Grid Domain Applications”“Wireless Functionality and Characteristic Matrix for the Identification of Smart Grid Domain Applications” –Chapter 5: wireless technology evaluation method that includes an initial screening and refinements to the screening using a combination of analysis, simulation, and/or testbed in the field. –Chapter 6: Performance metric and associated considerations 3 C

PAGE 4 Status of Guideline Development Chapter 4 –90+% complete –Pending final review of the text by the group –No plan for resubmitting the matrix Chapter 5 –It has gone through several updates but still needs detailed review –Estimated at 50% completion –Target to be completed by end of 2011 but expected to be delayed Chapter 6 –Preliminary stage –Due to the need for alignment with Chapters 5 and the Annexes, its update has been delayed –Additional details on the spectrum allocation and options in the US is considered The modeling tool is awaiting completion of Chapters 4 and 5. C

PAGE 5 Smart Grid Modeling Tool Interface under Development 5 C