CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Meeting 04/09/2015.

Slides:



Advertisements
Similar presentations
3nd KEK-CEA Workshop on Superconducting magnets and cryogenics for accelerator frontier - 24/03/2009 Ceramic insulation for Nb3Sn accelerator magnets F.Rondeaux.
Advertisements

EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
October 30 th Advances in Heat Transfer in High Field Accelerator Magnet B. Baudouy CEA/Saclay - Dapnia/SACM Annual meeting CARE October.
TASK Conductor Studies First Proposal CERN – 09 th July 2015 EuroCirCol Meeting – WP5.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
WP10.2 – where do we stand ? L. Bottura, C. Senatore Graphics by courtesy of A. Kario, KIT.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
Eucard-WP7-HFM 10 th Collaboration Meeting at LASA Milano Status on SMC & RMC Models J.C Perez on behalf of SMC/RMC collaboration team.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP-10 Status.
CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Pré-Kick-off meeting 03/07/2014.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Plans for EuCARD-2 cable manufacturing A. Kario, A. Kling, J. Brand, W. Goldacker Institute for Technical Physics, Karlsruhe Institute of Technology.
Quality assurance of the QXF- Q2 Nb 3 Sn cable mass production C. Scheuerlein, 6 November 2014 HL-LHC/LARP International Review of the Superconducting.
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
G.A.Kirby 4th Nov.08 High Field Magnet Fresca 2 Introduction Existing strand designs, PIT and OST’s RRP are being used in the conceptual designs for two.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
Wound Conductor Test Facilities (TASK 2) (Short status…) Friedrich Lackner 2 nd of September 2015 FUTURE CIRCULAR COLLIDER MAGNETS TECHNOLOGIES.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
ECC Clément Lorin – Maria Durante Acknowledgements: Fresca2 team.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
Fresca2 Technical meeting, 9 th june 2015, Gdr, relevance for FCC 1 Relevance of SMC/RMC/Fresca2/Inserts for FCC Gijs de Rijk 9 th June 2015 CEA Saclay.
EuCARD WP 7 – High Field Magnets Task 7.2 Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2 Status report EuCARD HFM collaboration.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
QXF cable insulation at CERN Paolo Ferracin, Jorge Munoz Garcia, Laura Garcia Fajardo, Jacky Mazet Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA.
WPO – ITN management & HR Seamus Hegarty HR-RPM 12-month review,
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Lessons learnt from CERN experience
QXF Coil Fabrication & Tooling Reaction / Impregnation
MQXF cable with RRP wires for Q2
EuCARD2 WP10.2 main results and open issues
11 T Dipole Integration & Plans M. Karppinen
CSP 25th November 2010 Technical agreement number 3: overview
ESAC Review February 2013 CEA Saclay
FCC 16 T dipole 4578 dipoles + 5 % spares : 4807 dipole magnets
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Mechanical stability and QXF coil winding
EuCARD2 WP 10.2 HTS Conductor
MQXF cable with RRP wires for Q2
QXF schedule and milestones
February 2007 Note: Source:.
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Meeting 04/09/2015

Content Mechanical characterization Dilatation tests – reduced scale Next steps Milestones 09/06/2015 FRESCA2 Expert meeting - Cable behavior duriong reaction 2

Tests campaign on reacted bare ten stacks confirmed thickness increase factor of 4% taken into account for tool dimensions Mechanical characterization 09/06/2015 FRESCA2 Expert meeting - Cable behavior duriong reaction 3

Mechanical characterization First insulated reacted ten stack (cable H11EC0146A - RUN 103A) sent at CERN beginning of April to be tested first with its insulation, then bare SPITN01 : reacted insulated PIT cable SPNTN05 : reacted bare cable to be used as the reference for PIT cable. 2 reacted stacks (cable H11EC0146A - RUN 103A) at Saclay waiting for impregnation SPITI01 and SPITI02 To be tested under full compression cycles at CERN 09/06/2015 FRESCA2 Expert meeting - Cable behavior duriong reaction 4

Mechanical characterization A dummy impregnation has been done end of July to validate FRESCA2 samples insert and procedure Modification of a part of the insert is needed to improve demounting process Few parts modification and new Teflon coating to be done 09/06/2015 FRESCA2 Expert meeting - Cable behavior duriong reaction 5 Impregnation test on an insulated Roebel dummy cable made at the same time

Mechanical characterization – Saclay tests Modification of the tooling for mechanical test at Saclay to be started this month Antoine Bonelli arrived on September 1st, temporary technician contract for 12-months. He will work on mechanical tests. 6 FRESCA2 Expert meeting - Cable behavior duriong reaction 09/06/2015

Dilatation tests – reduced scale First tests with insulated cable Cable end fixed to the tooling Cable end Free  Tooling modification New fixing system, to the mandrel  2 tests with the new tooling, PIT cable, ongoing 2 tests with the new tooling, RRP cable, foreseen for beginning of October (between CR3401 and CR1202) Report under work One Paper accepted for MT24 09/06/2015 FRESCA2 Expert meeting - Cable behavior duriong reaction 7

Next steps Cable dilatation campaign to be completed Test procedure validation Complete test campaign on PIT and RRP FRESCA2 cables Bare cable, new tools  compare with previous tests on bare cable Heat treatment steps More than one turn Longer SS Tests campaign (2-3 tests each) on QXF and 11T cables Mechanical characterization Impregnation of first two PIT ten stacks (this month) for tests at CERN Preparation and test of 2 more impregnated PIT samples for tests at Saclay Preparation of 4 impregnated RRP samples for test at CERN and at Saclay Mechanical tests at Saclay 8 FRESCA2 Expert meeting - Cable behavior duriong reaction 09/06/2015

Milestones N°Description Kick off meeting Today 4.1Mechanical test facilities designSeptember 2014Sept/Oct Mechanical test facilities readyDecember 2014December Dilatation tests report – preliminaryJuly 2014September Dilatation tests report - finalDecember 2014December Report on Mechanical tests at SaclayDecember 2015T /06/2015 FRESCA2 Expert meeting - Cable behavior duriong reaction 9