 Determine the waterline components needed to complete the water supply for the bathroom shown in figures 13-6 and 13-7.

Slides:



Advertisements
Similar presentations
Plumbing.
Advertisements

Typical Plumbing System
The idea evolved from two different contractor customers who shared with us a better way to perform hydrostatic testing of DWV piping system. Two different,
Contents Section 1—Introduction to Plumbing Section 2—Plumbing Systems
CON 4003 Construction Estimating Prof R. V. Locurcio.
 Nov 4 - regular class  Electrical text  Openings text  Nov 6 – no class  Nov 11 – no class – Veteran’s Day  Be sure to hug a Veteran (women only)
Lesson Working with Copper Tubing. Interest Approach n Why is copper tubing only used for water and fuel lines?
Household Waste Drainage Systems
STUDOR ® STUDOR ® AUSTRALIA Presents The Introduction & Installation Course for the STUDOR ® Mini-Vent  Air Admittance Valve (AAV)
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Plumbing for Kitchens & Baths
Technology in Architecture Lecture 15 Waste & Vent Systems Waste & Vent Sizing Procedure Bathroom Design Lecture 15 Waste & Vent Systems Waste & Vent Sizing.
Understanding and Designing Plumbing Systems
Understanding and Designing Plumbing Systems
Plumbing Systems CNST 305 Environmental Systems 1 Dr. Berryman
 Determine the waterline components needed to complete the water supply for the bathroom shown in figures 13-6 and 13-7.
Piping Materials Plumbing Systems CNST 305 Environmental Systems 1 Dr. Berryman 1bIntroduction – MaterialsChapter 1, 3; Appendix D (Wentz) and
PLUMBING FIXTURES INTRODUCTION CLASSIFICATION WATER DEMAND TRAPS
Keeping them Straight October 11,  Piping components come in two categories  Building Piping Components  Underground Piping Components.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Warm-up 4/6/15 What type of water do you have at your house? Objective:
Foundations of Real Estate Management BOMA International ® Module 3: Building Operations I Domestic Water ®
Pipe Sizing Sizing Gas Pipe for Low-Pressure Systems
King James Cost Estimation
King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye.
CH. 7 HW 13 Plumbing Presented By: Ken Coutain Jr.
SEWER PIPING DESIGN Sewer piping differs from water piping, in that sewer pipes are not under pressure. The function that takes place inside sewer pipes.
FINAL PROJECT CVE 4073 – Construction Cost Engr. Prof. Locurcio 12/04/2014.
Andrew Franks. A large bowl for urinating or defecating into, typically plumbed into a sewage system and with a flushing mechanism Vent distance- 10’
1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
Chapter 18 Plumbing Plans.
Residential Construction Unit 5 Energy Efficiencies and Mechanicals Mr. Todzia.
Plumbing Prints Unit 15.
Architectural Graphics UNT in partnership with TEA. Copyright ©. All rights reserved.
Construction Math This presentation gives examples of scenarios one would use math in construction situations.
HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Plumbing Unit.
Copyright © Texas Education Agency, All rights reserved. Architectural Graphics.
HVACR116 – Trade Skills Pipe Sizing Sizing Gas Pipe for Low-Pressure Systems.
Plumbing Tools ˚ Pipe Elbow 45˚ Pipe Elbow Making a 45 degree turn with a pipe.
Bellwork Fill out your KWL sheet about plumbing Fill out your KWL sheet about plumbing What do you K now about plumbing? What do you K now about plumbing?
Technology in Architecture Lecture 14 Upfeed Systems Pipe Sizing Procedure Pipe Sizing Example Lecture 14 Upfeed Systems Pipe Sizing Procedure Pipe Sizing.
PLUMBING VENTS A vent is simply described as a device that can take unwanted air from one place and deposit it somewhere else, usually outside. A plumbing.
CON 4003/CVE 4073/CVE 5073 Construction Estimating Prof R. V. Locurcio.
IDENTIFYING AND SELECTING PLUMBING MATERIALS AND FITTINGS Original Power Point Created by Von Peavy Modified by the Georgia Agriculture Education Curriculum.
“My Room” Project The Massachusetts Code Book and the rules that apply.
Plumbing Tools And Fittings (With Names) Adapted to PowerPoint.
Technology in Architecture
Drafting 2 (Arch) Quiz Review #4 Quiz Review. 1. What is the difference between a pier and column? Bearing capacity Soil impact Concrete block Reinforcing.
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Manitoba Building Officials Conference
Heating Ventilation and Air Conditioning
RESIDENTIAL PLUMBING SYSTEMS (WASTEWATER)
HVAC SYSTEM DESIGN ALMAQASED HOSPITAL
Plumbing.
Heating Ventilation and Air Conditioning
Typical Plumbing System
ME444 ENGINEERING PIPING SYSTEM DESIGN
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Technology in Architecture
Trinity Square Field Report
Technology in Architecture
Heating Ventilation and Air Conditioning
Technology in Architecture
Technology in Architecture
Technology in Architecture
Technology in Architecture
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Scale factor, scale, area, perimeter, and redrawing figures
Presentation transcript:

 Determine the waterline components needed to complete the water supply for the bathroom shown in figures 13-6 and 13-7

 Starting with the hot water line: Approximately 10 feet of ½-inch pipe and 3 feet of ¾- inch pipe are needed.  Beginning with the left side of the bathroom, the following fittings will be needed:  One ¾” x ½” x ½” tee  Three ½” tees  Four ½” x 6” stub out fittings (one at each lavatory)  One ½” 90-degree elbow (near the air chamber)  One ½” x 12” air chamber

 The cold water line servicing the lavatories will require the same components as the hot water line.  The cold water line servicing the water closets and urinals will require:  Approximately 20 feet of 1-inch pipe 7 feet of ¾-inch pipe.  Three ½-inch risers are needed for the water closets (allow 18 inches each)  Two ½-inch risers are needed for the urinals (allow 30 inches) for a total of 9.5 feet of ½- inch pipe.

Beginning in the lower left corner, the following fittings will be needed:  One 1” x ¾” x 1” tee  One 1” 90-degree elbow  Two 1” x 1” x ½” tees  One 1” x ¾” x ½” tee  Two ¾” x ¾” x ½” tees  One ¾” x ½” 90-degree elbow (near the air chamber)  One ½” x 12” air chamber  Five ½” x ½” 90-degree elbows (one per riser)  Five ½” x 6” stub out fittings (one at each fixture).

 Determine the DWV components needed to complete the DWV system for the bathroom shown in figures 13-8 and The horizontal waste piping is 2 feet below the finished floor, the horizontal vent piping is 9 feet above the finished floor, and the vent terminates 14 feet above the finished floor.

 The DWV piping will be taken off in three steps: the main(horizontal) waste, the vertical waste servicing the fixtures, and the vent.  Beginning with the cleanout near the lavatories, the lengths of the pipe and fittings needed for the main waste line servicing the lavatories are as follows:  4 feet of 2-inch pipe run vertically,  5 feet of 2-inch pipe run horizontally,  15 feet of 3-inch pipe, one 2” cleanout plug,  one 2” cleanout adapter,  two 2” 90-degree elbows,  one 2” sanitary tee,  one 3” x 2” x 2” sanitary tee,  two 3” x 3” x 2” sanitary tees,  one 3” 45-degree sanitary elbow,  one 3” x 4” busing and  one 4” sanitary wye.

 Beginning with the cleanout near the urinals, the lengths of pipe and fittings needed for the main waste line servicing the water closets and urinals are as follows:  4 feet of 2-inch pipe run vertically  5 feet of 2-inch pipe run horizontally  6 feet of 3-inch pipe  6 feet of 2-inch pipe (for the floor drain)  12 feet of 4-inch pipe  one 2” cleanout plug  one 2” cleanout adapter  two 2” 90-degree elbows  one 2” sanitary tee  one 3” x 2” x 2” sanitary tee  one 3” sanitary tee  one 3” x 3” x 2” sanitary tee  one 4” x 3” x 3” sanitary tee  one 4” x 4” x 3” sanitary tee  one 3” 45-degree sanitary elbow  A floor drain is also needed.

 Each of the lavatory risers will require:  4 feet of 2-inch pipe  one 2” sanitary tee  one 6 inch long piece of 2-inch pipe  one male adapter  The riser for each water closet requires:  1 foot of 3-inch pipe  one 3” x 2” x 3” sanitary tee  two feet of 3-inch pipe  3” 90-degree elbow servicing the water closet  one 3” toilet flange.  The riser for each urinal will require:  * 5 feet of 2-inch pipe  * one 2” sanitary tee  * six inches of 2-inch pipe.

 For the vertical venting pipe:  Four 7-foot-long 2-inch pipes (lavatories)  Two 8-foot-long 2-inch pipe (urinals)  Four 10-foot-long 2-inch pipes (water closets and floor drain) will be needed.  For the vertical vent pipe:  Thirty-four feet of 2-inch pipe  Six feet of 3” pipe ill be needed for the vertical vent stack through the roof.  The following fittings are needed for the vent pipe:  Four 2: 90-degree elbows  Eight 2” tees  One 3” tee  Two 3” x 2” bushings.  Additionally:  Nine 2” test caps  Four 3” test caps (water closets and roof vent)  One 3” thermoplastic roof flashing  Two decorative cleanout covers will be needed.

 Bids are firm fixed price  No sub-contracts allowed  Groups must have a PM  PM presents group solution & bid summary  Present written “bid package”  Estimates in CSI Division order  Excel for each Division w/ student name  Truss package = $3000 house or $4000 office  All in group receive same grade