Presentation is loading. Please wait.

Presentation is loading. Please wait.

FINAL PROJECT CVE 4073 – Construction Cost Engr. Prof. Locurcio 12/04/2014.

Similar presentations


Presentation on theme: "FINAL PROJECT CVE 4073 – Construction Cost Engr. Prof. Locurcio 12/04/2014."— Presentation transcript:

1 FINAL PROJECT CVE 4073 – Construction Cost Engr. Prof. Locurcio 12/04/2014

2 Group Members Aline Franqui Bianca Farias Gabriel Silva (PM) Gilberto Pierozan Julian Miyamoto Junior Badziak Lara Barroso

3 Outline  Introduction  Technical approach  Tasks Responsabilities  Bid Breakdown by major components  Bid Summary

4 Introduction  Since the past to our current age, mankind have always tried to let a legacy behind. In construction, we can make this wish last for ages. But nothing of it would have happened if there were no planning or management skills.  In this project we could taste how the real world is, and how to be prepared to challenges to come.

5 Technical Approach  We divided the work by lottery!  As PM I assumed that since everyone have done all the homeworks, nobody would have problem.  We’ve scheduled meetings twice a month  So, as a group, we could see the progress of our work.  After all the work was done, we revised the work from our collegues, to make sure it was correct

6 Task Responsabilities

7 Concrete

8

9 l Footing l Slab

10

11 l Footing

12 Footing

13 l Footing l Slab

14 Slab and Final Cost

15 #5 Rebars

16 Wood & Plastic

17 Dimensions of the elements used for Wood & Plastic and Thermal & Moisture

18 Studs

19 Headers

20 Blocking / OSB - CDX Total price for Wood & Plastic = $7,084.90

21 Thermal & Moisture

22 Total price for Thermal & Moisture = $1,570.34

23 Plumbing

24

25 VTR – vent tub riser LAV – lavatory WC – water closet TUB – tub shower CO – cleanout adapter KIT SK – kitchen sink

26 Plumbing 8’ 11.5’ 10.5’ 11.5’ 5’ 8’

27 Plumbing Hot water line: pass through tubs, lavatories and kitchen. Cold water line: pass through tubs, lavatories, water closets and kitchen. For tubs and wc: 1” pipe For lavatories and kitchen: ½” pipe

28

29

30 Roof

31 Roof main dimensions Calculate the area on the plane, and then use the following to have the inclined area: 34 54 4 (1+slope 2 ) 0.5

32 Roof Materials

33 Roof Calculation

34 HVAC

35

36 Electrical

37

38

39

40

41

42

43

44

45 Electrical Wiring and Fixtures Take-off

46

47 Openings

48

49 Finishes

50 Finishes Calculation

51

52 Bid Summary

53 Summary Sheet Description Material cost Equip. Cost Labor cost Total Cost Earthwork $3,737.52 $4,439.94 $3,826.49 $12,003.95 Concrete (Foundation) $6,017.25 $14.18 $2,260.39 $8,291.82 Wood, plastics and composites $2,716.42 $446.72 $2,595.58 $5,758.72 Openings $2,016.19 $- $546.00 $2,562.19 Plumbing and fixtures $299.05 $- $1,445.78 $1,744.82 Roof (with truss package on total cost) $5,020.98 $- $3,228.39 $11,249.37 HVAC System $4,159.46 $- $851.21 $5,010.67 Electrical $6,803.22 $- $8,392.86 $15,196.08 Fire Suppression $52.00 $- $29.00 $81.00 Thermal, moistures protection $757.61 $- $812.73 $1,570.34 Finishes $11,408.05 $8,094.97 $19,503.03 Specialties $2,500.00 Documentation $2,000.00 Labor Taxes (25%) $8,020.85 Sales Taxes (6%) $2,729.26 Subtotal $98,222.11 O&P (10%) $9,822.21 TOTAL COST $108,044.32

54 Questions?


Download ppt "FINAL PROJECT CVE 4073 – Construction Cost Engr. Prof. Locurcio 12/04/2014."

Similar presentations


Ads by Google