Helios Critical Design Review Calder Lane, Courtney Ballard, Ian Thom, Thomas Green, Matt Cirbo, Janelle Montoya 10-6-11 Fall 2011 Rev A 8-2-11.

Slides:



Advertisements
Similar presentations
Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Advertisements

Space Debris Conceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth
Clean Air Project: Team Big Green SpaceGasm Launch Readiness Review Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin.
Team Six-Pack Launch Readiness Review Calder Lane, Courtney Ballard, Ian Thom, Thomas Green, Matt Cirbo, Janelle Montoya 11/29/11 Fall 2011 Rev A
Team Space Jam Conceptual Design Review Ben Azlein, Bridget Chase, Paul Guerrie, Taylor King, Shane Meikle, Megan Scheele, Jamie Usherwood 09/16/10 Fall.
Thomas Buck, Kyle Garner, Alexandra Jung, Quinn Mcgehan, Mark Sakaguchi, and Scott Taylor Team Solkraft Critical Design Review 10/7/2010.
DYNAMO TEAM 2 CAREFUL HARRY CONCEPTUAL DESIGN REVIEW GLENDA ALVARENGA J.J. BUSSE EMILY EGGERS ADAM KEMP GABRIELLE MASSONE DALTON SMITH COREY WILSON SEPTEMBER.
TEAM kkkkk Conceptual Design Review Saad Alqahtani, Charles MacCraiger, Alexa Warly, Connor Jacobson, Kyle Skjerven, Matt Busby 09/19/11 Fall 2011 Rev.
Team R3D3 Critical Design Review Kate Kennedy Greg McQuie Nicole Ela Henk Wolda Marisa Antuna Devon Campbell Tyler Smith 10/04/11.
Team 2 Careful Harry Glenda Alvarenga J.J. Busse Emily Eggers Adam Kemp Gabrielle Massone Dalton Smith Corey Wilson Dynamo Critical Design Review.
Team Six-Pack Launch Readiness Review Calder Lane, Courtney Ballard, Ian Thom, Thomas Green, Matt Cirbo, Janelle Montoya 11/1/11 Fall 2011 Rev A
The Wright Stuff Conceptual Design Review Colton Hall, Brendan Lee, David Thomas, Zak Collins, Eli Nelson, Devin Bazata September 20th 2011 Fall 2011 Rev.
Brynn Larson Trey Karsten Terek Campbell Marcus Flores Marcell Smalley Shunsuke Miyazaki 2015/6/10 Team Ochocinco.
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Khufu’s Starship Jennifer Nill Chelsea Donaldson Graham Risch Henry Shennan Jonathan Lumpkin Jennifer Nill Chelsea Donaldson Graham Risch Henry Shennan.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Team Zephyr Critical Design Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright October 14, 2008.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.
Carnivorous Ninja Warriors Critical Design Review Cameron Comeau, Katie Brissenden, Kat Bryant, Arley Hendrick, Aram Podolski, Hannah Williams 06OCT2009.
Team Thumbs Up Launch Readiness Review Nick Lenk Eddie Cyrus Brian Inglis Chase Prichett Greg Nelson Jake Varey 11/11/08.
Chouinard, John Getz, Jennifer Hewitt, Lisa Kim, Elise Salmons, Patrick Silva-Ortiz, Carlos.
Space Debris Critical Design Review Cole Bostrom Corey Godwin Jonathon Kirchmaier Emily Logan Sean Murphy Seanna Renworth October 14, 2008 Fall 2008 Rev.
Garlic Armageddon BioSat Lauren Persons, Ryder Whitmire, Lenny Komow, Kirstyn Johnson, Jon Pfohl, Dave Borncamp October 6 th 2009.
Panoramic Rays Conceptual Design Review Brian Gonzales, Kaia Jerde, Harrison McLean, Anirudh Sarsam, Brett Traub, Matt Capron September 20, 2007.
Skillz That Killz Team 3 Conceptual Design Review Travis Dowdy, Jocelyn Mulkey, Hunter Hoopes, Taylor Smith, Kaitlyn Zimmitti, Jess Davidoff September.
Colton Hall, Brendan Lee, David Thomas, Zak Collins, Eli Nelson, Devin Bazata October 6, 2011 The Wright Stuff Conceptual Design Review.
Team Dionysus Critical Design Review Alijah Smith, Chris Koncilja, Elise Kowalski, Josh Tiras, Mike Beach, Becca Seigel 10/06/09.
Team R3D3 Conceptual Design Review Henk Wolda Kate Kennedy Greg McQuie Nicole Ela Marisa Antuna Devon Campbell Tyler Smith 9/20/2011.
GloboGym Fighting Cobras Conceptual Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards September 21, 2006 Project.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Team Zephyr Launch Readiness Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright November 11, 2008.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
Design Review Corinne Desroches Saad Alqahtani Charles MacCraiger Alexa Warly Connor Jacobson Kyle Skjerven Matt Busby.
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Thomas Jeffries, Anthony Anglin, Dylan Cooper, Dustin Fishelman, Colin Harkins, Joao Mansur, Starteya Pais, Andrew Trujillo 10/2/2012.
SPIRIT of the Koala Project VOLT Critical Design Review Anthony Anglin, Colin Harkins, Dylan Cooper, Thomas Jefferies, Starteya Pais, Joao Mansur, Andrew.
Team Andromeda Lucas Ibarra Alexis Sutker Evan Long Jack Oblack Jaevyn Faulk Dylan Anderson Devon Connor Eric Hardwick 2 October 2012.
Hang Seven Launch Readiness Review Lucas Migliorini, Becca Lidvall, Paul Smith Chase Goodman, Ethan Hollenbach, Nikhil Desai, Abby Caballero, Sierra Williams.
Team Lightning Rod Critical Design Review Fall 2010 Rev A Trevor Luke Chris Bennett Matt Holmes Sushia Rahimizadeh Alex Shelanski Matthew Dickinson.
Hang Seven Critical Design Review Sierra Williams, Lucas Migliorini, Abby Caballero, Chase Goodman, Paul Smith, Becca Lidvall, Ethan Hollenbach, Nikhil.
Team Muon Critical Design Review Jennifer Nill Chelsea Donaldson Graham Risch Jonathan Lumpkin Henry Shennan October 5, 2010 Fall 2010 Rev A/B
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams September 23, 2008 Fall 2008 Rev A
Chelsea Welch Tully Baetz Colin Nugen Elisabeth Moger Charles Hartman Anthony Cangelosi.
Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney September 23, 2008.
Zachary Cuseo, Sydni Smith, Andrew Fruge’, Tyler Knappe, Christopher Nie, and Shweta Maurya 8 October 2009.
Team Magnaritaville Conceptual Design Review Zachary Cuseo, Andrew Fruge, Shweta Maurya, Sydni Smith, Christopher Nie, Tyler Knappe 9/22/09 Fall 2009 Rev.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Critical Design Review The University of Northern Colorado GoGreenSAT Jessica Gage, Max Woods, Brent Hill, Ryan Marshall, Zach Sears Feb
Victor Taberski, Ryan Walker, Allen Marshall, Matt Kerwin, Andrew Winthrop, Steven Ramm October 14, 2008 UANIOOU – (Upper Atmosphere Near-Infrared Optical.
Team Hubble Jr. Critical Design Review Ryan Del Gizzi, Evan Levy, Kyle Norman, Chris Everhart, Holly Zaepfel, Rachel Small October 17, 2006.
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
Skillz That Killz Critical Design Review Jocelyn Mulkey, Jess Davidoff, Kaitlyn Zimmitti, Taylor Smith, Travis Dowdy, Hunter Hoopes October 8, 2009.
Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong 05 October 2010.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Colorado State University Paul Scholz, Tyler Faucett, Abby Wilbourn, Michael Somers June
Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung Fall 2011 Rev A/B
O2n Cloud Nine Critical Design Review
Mission Statement... The Space Wolverines will;
Brandi Casey Lee Wilson
Skillz That Killz Team 3 Final Presentation
Team Go Go Gadgets Launch Readiness Review
S^3 Launch Readiness Review
Clean Air Project: Team Big Green SpaceGasm Conceptual Design Review
Space Debris Critical Design Review
Team Solkraft Conceptual Design Review
Team Mate Conceptual Design Review
Team Munchies Conceptual Design Review
Proposal Team 8: Grant Fritz, Jessica Brown, Stephanie Jalovec, Jennifer McGraw, Brian Roth, Evan Townsend.
Panoramic Rays Critical Design Review
Presentation transcript:

Helios Critical Design Review Calder Lane, Courtney Ballard, Ian Thom, Thomas Green, Matt Cirbo, Janelle Montoya Fall 2011 Rev A

Mission Overview Objective: To send a BalloonSat capable of wireless energy transmission to an altitude of 100,000 feet and record data on the efficiency of transmission. Purpose: To evaluate the efficiency of wireless energy transfer at high altitudes for possible application on a larger scale. Hypothesis: The BalloonSat will transmit energy at a moderate efficiency to another satellite and provide it with electricity. Wireless energy transfer would negate several of the problems with photovoltaic arrays today. Weather, atmosphere and other events that block electromagnetic radiation render solar panels on the ground totally useless. However, in space, in the correct orbit, a solar cell bearing satellite could provide and endless stream of energy to Earth through any condition. With several receiving stations, or a high power microwave generator, energy could be produced constantly and consistently.

Requirement Flow Down 1Final flown weight of BalloonSat Helios shall not exceed 850 grams aLightweight materials shall be utilized in lieu of heavier selections. However, such materials shall be durable enough to ensure the satellite remains intact during launch and descent. bAll electrical components shall be designed and arranged in such a manner as to minimize the size of the external structure to reduce weight and increase durability without additional structure where possible. 2A maximum of $250 provided by the class shall be used in purchasing necessary components. aResearch shall be done to identify and purchase quality components for low prices. bWhere possible, components shall be made and/or assemble by the team to eliminate costs of pre-fabrication. For example, the circuit board for transferring power from the solar panels to the laser shall be etched on campus instead of ordered. 3BalloonSat Helios shall be able to record 90 minutes of data during its ascent to 30 km and remain intact during the following descent. aDurable materials that can withstand the shock experienced during burst and the continuous motion during all other points of the flight shall be used. bA carbon-fiber rod shall be used to maintain alignment between the two satellite structures, and the entire structure shall be tested to ensure it maintains its integrity during ascent and does not harm itself during descent. cFoam shall be used to ensure all electrical components are insulated from shock due to motion of the BalloonSat. dAll electrical components shall be able to continue their proscribed tasks at temperatures down to -10 o C, and shall have little to no drop in performance due to temperature where possible. eAn active heating system shall be fabricated and utilized to maintain a temperature of more than -10 o C in the top structure. fA radiating heating system shall be utilized in the bottom box to keep the microcontroller functioning and recording data. gInsulating foam shall be used to maintain a temperature above -10 o C in the upper box and in an appropriate range for the effective use of all electrical components. 4BalloonSat Helios shall record data on the efficiency of transfer of energy with lasers. aA system of six solar panels on the top of the first structure shall gather energy from the sun during ascent. The gathered energy shall then be run through a system designed and built by the team to provide energy to a 50mW laser. bA 50mW laser shall be emitting light from the bottom of the first structure toward a filtered solar panel on the top of the second structure. cThe energy collected by the solar panel on the second structure shall be measure with a volt and ammeter to provide the necessary data for the calculation of watts. dUpon retrieval, the data shall be collected and analyzed. The watts received by the lower panel shall be compared to the known and tested emissions from the laser. This data will also be compared to testing done on the ground to compare the change in efficiency. 5During the fight, a HOBO data logger shall collect internal and external temperature data. aThe HOBO shall be preprogrammed and placed in the top structure of BalloonSat Helios with a temperature probe within and a second sticking out of the structure about 1-2 cm. 6During flight, a Canon SD780 shall take pictures of the exterior environment. aThe Canon SD780 firmware shall be hacked to allow the camera to record images at 10 second intervals during the entire flight.

Design (Proposal Requirements Met) Testing efficiency of laser transfer of Energy Solar panels (both structures) Laser diode Volt-ammeter Satellite shall not exceed 850 grams Lightweight, sturdy materials (i.e. carbon fiber) Effective use of space in structures Data collected during ascent and descent HOBO, temperature cable Canon SD780 (also lightweight) Heater to maintain internal temp (make testing possible) Satellite will remain intact Durable materials Foam for insulation and to avoid shock

Design (Structure) Helios will integrate two separate boxes One box will be used for energy transmission (Sat 1) Sat 1 will be a 15cm cube One will be used to receive energy (Sat 2) Sat 2 will be 9x9x5cm rectangle Sat's 1 and 2 will be connected on the flight string and with two carbon fiber tubes to ensure energy transmission.

Design (Power) Power will be provided by 9 solar cells Solar cells will feed a 3.7 volt 2600mah lithium battery A 3-6 volt 650nm 50 mw red laser will transfer power, wirelessly between the two satellites. Sat 2 will receive power using a 10 th solar cell and route it through a Microprocessor and Volt/Ammeter PCV board A red light filter will be incorporated into Sat 2 for ambient light filtration

Design (Thermal) Three 9 volt batteries in Sat 1 will power a heater Internal Infrared insulation and ambient heat will be used to heat both satellites Sat 2 will integrate extra internal infrared insulation and “waste” heat from the microprocessors. Both satellites will use external insulation as well.

Design (Data Storage) Data will be stored on a 2 Gigabyte micro SD card. Card will be contained within an Arduino card shield Data will be measured by a PCB board with both volt and amp analog outputs. Data will be processed using an Arduino Uno microprocessor. These parts will all be contained within Sat 2

Design Renderings

Box Diagram Volt/Ammeter PCB Board Switch Arduino Uno and Micro SD card Onboard Heater Switch Rechargeable Battery 3x9V Batteries mw Laser Diode Photovoltaic Panel Rechargeable Battery Camera Solar Cells Switch 3.7 Volt lithium battery 2600 mah 2 Gigabyte SD card HOBO Thermometer Barometer Hygrometer Switch

Parts Used Arduino Uno: Arrived 10/3 AttoPilot Sense Breakout 180: Arrived 10/3 MircoSD Shield: Arrived 10/3 3.7 Volt 2600 mAh LG Li-Ion Battery with PCB and Wires Ordered and expected to arrive 10/6-10/7 Solar Cells: Ordered and expected to arrive 10/5-10/7 50mW 650nm laser: Ordered and expected to arrive 10/12 Carbon Tubing: Ordered and expected to arrive 10/5-10/7

Testing We will conduct the drop test, roll test, whip test, and cold test (roll, drop, and whip all on 10/13 and cold on 10/20) We will test the efficiency of the solar cells (10/11) We will test the filter by emitting it to the sun and testing to see how much energy is being produced by just the light from the sun (10/11) We will test to make sure that the solar panel is able to generate energy using the laser (10/20) We will test the alignment of the laser and the solar cell by using the vibration table in the ITLL (10/20)

NameContact InfoMain PositionSecondary Position Calder Lane Team Leader Structure Science Courtney Ballard ThermalElectrical Thomas Green ElectricalProgramming Ian Thom ScienceSafety Matt Cirbo ProgrammingThermal Janelle Montoya Management and Budget Structure Team Organization Chart

Schedule DateTask:Due Fri 9/9-HW 03 Sun 9/11-Project decision - Distribution of proposal responsibilities Tues 9/13-Unification and editing of proposal rough draft -Proposal questions -Discuss date for ITLL shop certification Th 9/15-Finalization of project proposal for turn-in, Assign specializations -HW 04, CoDR Slides Fri 9/16-Turn in project proposal to Prof. KoehlerProposal Fri9/6-Unification of CoDR Presentation Final Draft. -Assign presentation speaker order/run through pres. Th 9/22-Finalize HW 04 -HW 06 Tues 9/27-Meet with Prof. Koehler to order hardware and turn in HW 04 -Distribute responsibilities for CoDR after appointment HW 06 (Before class) HW 04 (At appt.) Th 9/29-HW 05 (Due 10/11) -DD Rev A/B -Begin Construction on structures and electronics Tues 10/4-Pre-Critical Design Review (pCDR)DD Rev A/B

Th 10/6-pCDR Th 10/6-Construction (cont.) Sun 10/9-Have all components to assemble -Construction (cont.) -Ground test laser and solar panels Th 10/13-Complete prototyping design -DD Rev C Th 10/20-Complete cold test -LRR Presentation Tues 10/25-Pre-Launch Inspection (Bring all hardware) Th 10/27-In-Class Mission Simulation Test (Bring BalloonSat) Th 10/27-Finish LRR Presentation Tues 11/1-Launch Readiness Review (LRR)LRR Pres. and DD Rev C 7AM Th 11/3-Design Review -LRR Cards Fri 11/4-Final Weigh-in and Turn In BalloonSatBalloonSat DLC 270A & LRR Cards Sat 11/5-LAUNCH DAY Th 11/10-Data Analysis, Begin DD Rev D Th 11/17-Final Presentation, Assign speaking roles Th 11/24-Finalize Final Presentation/run through pres. -Finish DD Rev D Tues 11/29 & Th 12/1 -Final presentations and reportsFinal Pres 7 AM) Sat 12/3-Design ExpoDD Rev D, Team Vids Tues 12/6-Hardware Turn-In

Budget

Expected Results We expect the satellite to receive low amounts of power in the form of laser radiation and convert it back into useable electricity. This will then be measured in real time and stored for later analysis.

Biggest Worries The laser doesn’t transfer the energy to the solar panel. The carbon tubes are not stable enough to keep the laser pointed to the solar panel. Making the programing compatible to all the components.