Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators on behalf.

Slides:



Advertisements
Similar presentations
CDR Feb 2006Mar 2008Dec 2009 Mar Design Study Preparatory Phase TDR tendering construction data taking governance legal entity pre-production.
Advertisements

Introduction to Structural Design
Trigger issues for KM3NeT the large scale underwater neutrino telescope the project objectives design aspects from the KM3NeT TDR trigger issues outlook.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
WP F/L Development of the Dom support and rope- and cable management for KM3-Net. KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef Edward Berbee.
Rope & Cable management A vertical electro-optical backbone cable for KM3NeT Gertjan Mul On behalf of the km3net collaboration Nikhef.
Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
C.Sollima INFN - University of Pisa for the KM3NeT Consortium “Quality Assurance and Risk Assessment in the KM3NeT Neutrino Telescope Design Study” Technical.
Kay Graf Physics Institute University of Erlangen TeV Particle Astrophysics II Madison, WI, USA August 28 – 31, 2006 Towards Acoustic Detection of UHE.
P. Sapienza, NOW 2010 The KM3NeT project  Introduction & Main objectives  The KM3NeT Technical Design Report  Telescope physics performance  New developments.
Amsterdam October 2003 M. Sedita VLVnT Installation and Maintenance of the submarine network The Maintenance aspect present some difficult as their.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Antares/KM3NeT M. de Jong. neutrinos  p Scientific motivation: – origin cosmic rays – birth & composition relativistic jets – mechanism of cosmic particle.
Mario MUSUMECI VLV T workshop Mechanics parallel session Critique Of ANTARES MECHANICS, S.CUNEO Analisys of mechanics ideas or NEMO, M.MUSUMECI R. OCCHIPINTI.
Paolo Piattelli - KM3NeTIAPS - Golden, 6-8 may 2008 KM3NeT: a deep-sea neutrino telescope in the Mediterranean Sea Paolo Piattelli - INFN/LNS Catania (Italy)
KM3NeT The Birth of a Giant V. Popa, KM3NeT Collaboration Institute for Space Sciences, Magurele-Bucharest, Romania.
High Sensitivity Smoke Detection
C.DistefanoCRIS 2008 – Salina, September The KM3Net Consortium Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud Towards a km3-scale.
Introduction to Structural Design © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Architecture has recorded the great ideas of the.
WP F/L A mechanical design for a detection unit for a deep- sea neutrino telescope VLVnT11 - Edward Berbee - Nikhef.
Structures and Mechanisms Subsystems AERSP 401A. Introduction to Structural Estimation Primary Structure: load-bearing structure of the spacecraft Secondary.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Maintenance of the ANTARES deep-sea neutrino telescope 1 Marco Circella --- INFN Bari on behalf of the ANTARES Collaboration.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July In this talk Preparation of mass construction (including DOM and DU integration)
KM3NeT Pylos meeting, April, 2007 Some preliminary studies for the positioning calibration of KM3NeT Miguel Ardid Universitat Politècnica de València.
Acoustic Calibration for the KM3NeT Pre-Production Module Alexander Enzenhöfer on behalf of the KM3NeT consortium VLV T 2011 Erlangen, –
M icro A ir V ehicle Wing Deployment System April 7, 2005 MAV erick S olutions Todd Adkins Leroy Cohen Jr. Adam Hollrith Brian Moore Sponsored by: Eglin.
Presented by E.G. Anassontzis University of Athens on behalf of NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Mechanics for “km 3 ” neutrino.
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
VLVnT11 - Erlangen 12-14/10/ Giorgio Cacopardo NEMO Phase2 mechanical design G. Cacopardo on behalf of NEMO collaboration.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Steering committee Mechanics 29/07/ KM3NeT steering committee Edward Berbee - nikhef 2 DU-1 pictures at CPPM.
C.Sollima INFN - University of Pisa for the KM3NeT Consortium “Quality Control Considerations for the KM3NeT Very Large Volume neutrino Telescope” The.
PPM DU Sea Qualification Tests 1.General constraints & requirements 2.Preliminary tests 3.Full mechanical test.
1 Motivations KM3Net VEOC Based on developments on solid cable at NEMO and Antares project and proto cable of Seacon. Optimizing properties like; flexibility.
STATUS AND PHYSICS GOALS OF KM3NET Paolo Piattelli P. Piattelli, ICHEP14 Valencia INFN – LNS, Catania (Italy)
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
KM3NeT-Toulon Infrastructure 22/06/121 NB: focus on latest developments, see February presentation in Catania for details KM3NeT meeting Erlangen,
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
© 2003, Cisco Systems, Inc. All rights reserved. 2-1 Campus Network Design.
Report to the ASC on project organization and critical issues E. Migneco ASC meeting, Amsterdam, march
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
KM3NeT WPF/L NIKHEF- MECABAR 1 A.Cosquer on behalf of the KM3NeT consortium MECABAR PROJECT PLAN 1- Context 2- 3D views and responsibilities 3-
Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators.
S.BEURTHEY CPPM/IN2P3 anémone ανεμώνη anemone Preliminary Development plan A ntares NEMO NE stor CATANIA 12 of March 2008.
Status report Els de Wolf Annual Meeting 2011, Nikhef.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
The PPM project. The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model.
The electro-optical cabling system for the NEMO Phase-2 tower Antonio D’Amico INFN - LNS.
Electronic department 5/7 July 2010, KM3NeT meeting at Nikhef - Mar van der Hoek et.al. Status and experiences with oil-filled Pressure Balanced backbone.
Pre-Production Models for KM3NeT
KM3NeT P.Kooijman Universities of Amsterdam & Utrecht for the consortium.
KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef
P.Kooijman, UVA-GRAPPA, UU, Nikhef
Concluding remarks E. Migneco
Status of the Mechanics at Ciemat.
OFFSHORE CONSTRUCTION
Els de Wolf 20 February 2012, Catania
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
Junction Boxes for KM3NeT
KM3NeT: where are we and where do we go
IFR detector mechanics
Introduction to Structural Design
Introduction to Structural Design
Presentation transcript:

Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators on behalf of KM3NeT

Mario MUSUMECI and Riccardo PAPALEO on behalf of KM3NeT KM3NeT Consortium “In March 2008 the Preparatory Phase of KM3NeT infrastructure started, funded by the EU FP7 framework. The primary objective of the KM3NeT Preparatory Phase is to pave the path to political and scientific convergence on the legal, governance, financial engineering and siting aspects of the infrastructure and to prepare rapid and efficient construction once approved” see:

Mario MUSUMECI and Riccardo PAPALEO on behalf of KM3NeT why a Pre-Production Model the Consortium converged to a common idea for the mechanical design by February 2011, starting from this event, a work group, aiming to produce and test a mechanical design of the prototype DU, has been constituted Within the PP, to test the actual capability to perform an efficient and rapid construction, once the financing of the entire project is approved, it has been agreed to design, test and build a prototype of the Detection Unit that will be the core of the future detector the convergence process led to a conceptual design that includes both the best features and “return of experience” of the previous deep see neutrino telescope pilot projects and the results of KM3NeT Design Study

Mario MUSUMECI and Riccardo PAPALEO on behalf of KM3NeT mechanical specifications of the preproduction model - mooring line, anchored to sea bed and tensioned by a top buoy; -Vertical storeys, hosting instrumentation necessary for deep sea water neutrino detection and tracking -storey design compliant (shadowing, lightweight,...) with the Digital Optical Modules, hosting one DOM on each end - DOM horizontal spacing (storey length), 6 m - 20 storey, vertically spaced of 40 meters and rotated alternately by 90°, around the vertical axis -first from the seabed -DU deployable in a compact (stake) configuration, unfurlable from the sea bed 6m 40m

Mario MUSUMECI and Riccardo PAPALEO on behalf of KM3NeT Designing an effective bracket to support the Digital Optical Module, due to its large active area, is a non trivial job. the system has, simultaneously to respect specifications for: maximum shadowing (less than 2%) accommodating glass sphere contraction due to the environmental pressure ( bar) Variants presently under study: A first prototype was built and tested last September and a further release is scheduled to be ready for testing within few weeks DOM’s brackets

Mario MUSUMECI and Riccardo PAPALEO on behalf of KM3NeT once decided to design an unfurlable slender mooring line, to find out a way to store the ropes in a safe and efficient manner is fundamental for the reliability of the system both during the unfurling and the entire lifespan of the Detection Unit at the same time, also the backbone has to be stored and maintained in position during the DU’s life ropes management system at the moment, the concept under testing is: to wind the 4 ropes of each storey around reels (2 on each storey’s side) and to arrange the 2 curled backbones around 2 of them (see Gertjan MUL, Nikhef, talk in this conference)

Mario MUSUMECI and Riccardo PAPALEO on behalf of KM3NeT the storey the storey design fits with the following specifications: maintain the DOMs at the assigned horizontal spacing host the ropes management system and the backbone keep the ropes system in the correct configuration minimize the drag stand to the stresses imposed by the surrounding environment and by the deployment minimize the shadowing on the DOMs (less than 2%) the storey are made of slender tubes (40mm OD) welded to made a lattice girder: sea water resistant alluminum alloy (5000 series, peralluman) chosen for the tubes 6m two further simplified and non instrumented beams, called “separators”, will be installed between the anchor and the first storey to guarantee to the DU stiffness against torsion around the vertical axis 6m The tapered shape of the beam aims to: minimize the shadowing on the PMTs maximize the strength of the girder maintain the centre of buoyancy above the centre of gravity the yellow bricks, made of syntactic foam, arranged in the middle of the storey are used to distribute the buoyancy over the DU, in accordance with the KM3NeT TDR, in order to avoid that a top buoy’s failure could have destructive effects.

Mario MUSUMECI and Riccardo PAPALEO on behalf of KM3NeT the storey design fits with the following specifications: maintain the storeys in the packaging configuration during the assembly and deployment phase to host the tool necessary to unfurl the DU after the connection with the secondary JB to permit the safe unfurling of the storey (protection of the DOM) to host the top buoys to maintain the DU in stable position after the unfurling phase First prototype built at CPPM the anchor

Mario MUSUMECI and Riccardo PAPALEO on behalf of KM3NeT assembly meeting, September 2011 mid September: the first so called “assembly meeting” was organized meeting aimed at verifying the interfaces between the single sub components, by using a full scale mock-up mock-up of the anchor used to assembly the storeys, the ropes management system, the backbone and the DOM’s brackets notes/remarks made on all the subsystems: currently engineers are working on improvements to optimize the design

Mario MUSUMECI and Riccardo PAPALEO on behalf of KM3NeT further dry tests/construction - a further assembly meeting to be organized within the next two weeks - construction of a mini-DU made by: - anchor - base - 2 separators - 8 storeys - cables and ropes management system - top and storey buoys will be completed before the end of 2011, in order to allow to perform sea qualification tests

Mario MUSUMECI and Riccardo PAPALEO on behalf of KM3NeT sea qualification test the sea qualification test of the mechanical structure (with the oil filled backbone) will be performed through different steps program of work: to qualify each sub item (the most critical) in a dedicated deployment test. So that the complexity of the system under testing will be eased, in order to simplify the fault finding process the qualification tests will be focused on three phases: - anchor item’s - DU bottom item’s (anchor + base + separators) - unfurling phase between 2 columns (5 storeys – 1 full column + 1 storey in the second column) at the end of these three phases, if the concept idea would be qualified, the group will organize a full mechanical test with a complete DU made up of - anchor - base + 2 separators - 20 storeys fully equipped with dummy DOMs, dummy backbones and storey buoyancy - top buoy

Mario MUSUMECI and Riccardo PAPALEO on behalf of KM3NeT conclusions the current mechanical project fits the KM3NeT requirements the project is running in order to conclude the sea qualification test before march 2012.