CTF3-CLEX meeting June 12, 2006page 1 choice of architecture : 1 photo-injector 3 LIL sections: 1 for compression and 2 for acceleration 1 beamline with.

Slides:



Advertisements
Similar presentations
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Advertisements

Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
AWAKE electron source New Electron Source WP at CERN
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Steve LidiaICFA Workshop, Chia LagunaJuly, 2002 Flat Beam Photoinjectors for Ultrafast Synchrotron Radiation Sources Steve Lidia Lawrence Berkeley National.
Low Emittance RF Gun Developments for PAL-XFEL
~ gun3.9 GHz cavity Bunch compressor 3 ILC cryomodules 45 deg. spectro injector main linac user area disp. area transport line Overview of.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
Measurements of the X-ray/pump laser pulse timing Valery Dolgashev, David Fritz, Yiping Feng, Gordon Bowden SLAC 48th ICFA Advanced Beam Dynamics Workshop.
G5 Design Review, April 24, 2009 Gun to 5cell Cavity Test: Overview Dmitry Kayran G5 test Design Review April,
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
17th July 2008#4-CTF3 Committee1 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG 0225CA.SNG.
People Xavier Stragier Marnix van der Wiel (AccTec) Willem op ‘t Root Jom Luiten Walter van Dijk Seth Brussaard Walter Knulst (TUDelft) Fred Kiewiet Eddy.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
16/01/12DITANET Topical Workshop on Beam Position Monitors Reentrant Beam Position Monitors DITANET Topical Workshop on Beam Position Monitors 16 th –
F. Peauger19th June #3-CTF3 Committee1 CALIFES STATUS CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
Areal RF Station A. Vardanyan
Phil Oxford , june 18 Photoinjector at.
Linac beam dynamics Linac dynamics : C. Bruni, S. Chancé, L. Garolfi,
Status and progress of the CTF3 probe beam
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
An X-band system for phase space linearisation on CLARA
CLEX* Status and Plans CTF3 complex CLEX
Have a chance to operate your own beam at CERN
Timing and synchronization at SPARC
12 GHz High Power RF components requirements for CEA activities
9/10/2018 News on operation Second commissioning phase from 30th of March to 9th of April Aline Curtoni, Claire Simon, Franck Peauger, Wilfrid Farabolini.
Thermal emittance measurement Gun Spectrometer
Injector Performance Requirements Conventional Facilities Update
LCLS Injector: Introduction D. H
LCLS Gun Commissioning Status & Plans David H
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
Linac/BC1 Commissioning P
Compact linear accelerator FLUTE: status update
CLIC Feasibility Demonstration at CTF3
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Linac Diagnostics Commissioning Experience
LCLS Injector System Overview D. H
Breakout Session SC3 – Undulator
Presentation transcript:

CTF3-CLEX meeting June 12, 2006page 1 choice of architecture : 1 photo-injector 3 LIL sections: 1 for compression and 2 for acceleration 1 beamline with diagnostics (leading to 2-beam teststand) Probe beam status and schedule January MV/m compression 17 MV/m acceleration 17 MV/m acceleration LIL sections beam dump focusing coils K quadrupoles Laser RF pulse compression 2 x 45 MW profile monitor position monitor steerer rf gun cavityspect. magnetRF deflector C A L I F E S

CTF3-CLEX meeting June 12, 2006page 2 RF gun status R. Roux July, 7 th Drawings, overview 2.What is under way? 3.Open questions, ask for info 4.Problems, risks

CTF3-CLEX meeting June 12, 2006page 3 1.Studies finished 2.Drawings finished 3.List of components: - gun with a measurement loop - 2 tapered waveguides - 2 LIL flanges - 2 solenoids - 1 steerer - vacuum chamber (tubes, valve, bellow) - 2 gauges - 1 ionic pump - 1 pneumatic valve - 1 translation trolley for the preparation chamber (additional request from CERN) - NEG coating on the vacuum chamber (agreed with CERN people) 1. Overview solenoids RF input steerer valve photocathode vacuum pump

CTF3-CLEX meeting June 12, 2006page 4 2. What’s under way? Gun: new supplier, the coupler cell should arrive between 17th-21th July if everything OK, order the rest of the gun, all pieces in September then, RF measurements, mechanical adjustments and brazing at LAL (thanks to Eric Chevallay for the 316LN stainless steel, we will soon refunded) Magnetism: coils and steerer are ordered, should arrive in the beginning of September power supplies will be bought by CERN (offer of R. Losito) Vacuum: gauges and valve are received, ionic pump at the end of July power supply will be bought by CERN (offer of R. Losito) Mechanics: vacuum chamber and supports are under construction in LAL workshop it should be finished in September but risks of overlap with PHIN gun machining  PHIN gun has the priority !

CTF3-CLEX meeting June 12, 2006page 5 3. Open questions, ask for info Girder: if we can reuse the LIL 2300 mm girder, we need the drawings open question: RF gun assembly on girder at LAL or at CERN ? Cabling: Who does the cabling between the photo-injector and the racks? -cables for solenoids and steerer (electric and cooling) -cable for RF loop -cables for gauges and power supply -on which side of the linac set the connectors of the solenoids? Possible overlap between the solenoid connectors and RF network pumps? (happened on PHIN, solenoids sent back to the supplier to modify connectors) Cooling: tuning cooling loop from frozen water (20°C) the gun will be mechanically deformed in such a way that the right tuning frequency achieved at  30°C

CTF3-CLEX meeting June 12, 2006page 6 3. Problems, risks - New supplier for the gun, if not good  delay - Money: 70 k€ received this year not enough to order the power supplies and gun cooling loop I hope to get the totality of the required budget next year in March But up to now, RF gun construction proceeds well

CTF3-CLEX meeting June 12, 2006page 7 Signal taken from the Drive Beam Laser 2 main distinct tasks: 1.extraction & manipulation of laser beam (windowing, x4 frequency multiplication, doubling of the pulse frequency 1.5  3 GHz) 2.transport of the laser beam over 80 m as far as the photo-cathode Subcontractor : LILM (Laser Matter Interaction Lab) from CEA-Saclay Study of the 2 tasks till the end of 2006 mechanical design and realization follow-up by Dapnia Pb : delay of the DB laser  1st tests with real laser will be very late Laser system

CTF3-CLEX meeting June 12, 2006page 8 Time-schedule

CTF3-CLEX meeting June 12, 2006page 9 Beam dynamics calculations nearly complete... single bunch is fine multibunch operation due to beam-loading, bunch charge should be linearly reduced to meet energy & phase requirements (1% and 1deg) Qb < 5nC/N still to be done: effect of laser spot misalignment estimation of the emittance measurement accuracy

CTF3-CLEX meeting June 12, 2006page 10 Time-schedule

CTF3-CLEX meeting June 12, 2006page 11 Califes Drawings Drawings nearly complete...

CTF3-CLEX meeting June 12, 2006page 12 injector (LAL Orsay) Injection beamline laser beam laser table LIL section input BPM screen vacuum pump

CTF3-CLEX meeting June 12, 2006page 13 inter-section BPM steerer

CTF3-CLEX meeting June 12, 2006page 14 diagnostics beamline screen RF deflectorQL3 TripletDipoleDumpvac. pump total length (cathode plane to output valve) = m

CTF3-CLEX meeting June 12, 2006page 15 RF system klystron, RF pulse compression, RF network : supplied by CERN Modulator : includes a high voltage pulsed power supply with negative polarity three electromagnet power supplies a filament heater power supply an ion pump power supply a hydraulic network a X-ray shielding a control-command system some racks containing the materiel offers from vendors received on 1st of July realization time months vendor choice at end of July

CTF3-CLEX meeting June 12, 2006page 16 RF network defined in March power phase-shifter has to be developed (fine tuning of the compression section)

CTF3-CLEX meeting June 12, 2006page 17 Phase-shifter 3 GHz scaling from a SLAC model at 11.4 GHz by Alexej Grudiev sliding circular guide + mode converter tolerances and mechanical study made at Saclay fabrication will start end of september power tests at CERN

CTF3-CLEX meeting June 12, 2006page 18 Time-schedule

CTF3-CLEX meeting June 12, 2006page 19 Vacuum adaptation and laser miror Compression LIL section Accelerating LIL section Diagnostic line RF Gun Sector 1 Sector 2 Sector 3 IZ 120 IZ 270 Vacuum Vacuum system defined 2 LIL sections tested under vacuum at Cern 3 valves 6 ion pumps for LIL sections 2 ion pumps for input and output beamlines power supplies, gauges hardware provided by CERN primary pumping group

CTF3-CLEX meeting June 12, 2006page 20 steerer H+Vsolenoidsearth field correction quadrupolesdipole 52 x 173 x 231 order before August CERN provision call for tender (5) before August CERN provision delivery Nov delivery May Magnets QL3 BHZ36

CTF3-CLEX meeting June 12, 2006page 21 # of power supplies typeIntensity (A)Voltage (V) Steerers12Bipolar± 10± 5 Solenoids2Unipolar12020 Quadrupoles3Unipolar20010 Dipole1 Unipolar with degauss capability Earth field compensation 2Unipolar53 Power supplies requirements Specifications of Power supplies have been done and conveyed to CERN

CTF3-CLEX meeting June 12, 2006page 22 Time-schedule

CTF3-CLEX meeting June 12, 2006page 23 MeasureRequirementschosen solutions CurrentResolution ≤ 1% Precision ≤ 3% Bandwidth > 250 MHz Single shot, non destructive BPM (after calibration) PositionResolution ≤ 20µm Precision ±100µm Bandwidth >50 MHz Range ±10 mm Single shot, non destructive BPM Screen + CCD camera ProfileResolution ≤ 20µmRange 10x10mmScreen + CCD camera EmittanceError < 20%Quad scan + Screen + CCD camera Central energy Resolution DP/P ≤1 % Precision ≤ 2% Bandwidth >250 MHz Single shot15° bending magnet + BPM Energy spread Resolution DP/P≤0.5% Time resolution is desirable 15° bending magnet + Screen + CCD camera; possible future... Streak Camera, segmented photomultiplier, segmented beam dump … for time resolution Bunchlength Resolution ≤0.5ps rms Variation of bunch length along the train Deflecting cavity + Screen + CCD camera; possible future... RF pick-up ( GHz) during operations Diagnostics

CTF3-CLEX meeting June 12, 2006page 24 BPM Specifications : single bunch & multi-bunch operation 3 GHz) 0.5 nC coaxial reentrant cavity, original design from R. Bossard (CERN) proposed and developed for TTF (M. Luong, C. Simon - DAPNIA) prototype for technology validation : OK pre-serie (2 units) : under fabrication

CTF3-CLEX meeting June 12, 2006page 25 Beam profile monitors 3 profiler systems to different locations: injector output, behind the triplet, behind the dipole 2 main sub-systems: 1.the vacuum tank with devices (screen, actuator, viewport, lighting) 2.the optics system (lenses, CCD camera, filter wheel, shielding…) Screen holder Insertion mecanism Tank study has started...

CTF3-CLEX meeting June 12, 2006page 26 TTF2CTF3 SOLEIL optics design (various magnifications) + CCD camera (with Cern MTV interface)  examples of optics design with different levels of integration Califes : will start next September Optics system

CTF3-CLEX meeting June 12, 2006page 27 Time-schedule

CTF3-CLEX meeting June 12, 2006page 28 Beam Graphite Lead Polyéthylène 500 Beam Dump Derived from SOLEIL (100 MeV, 0.5 to 8 nC, 3 Hz) Adaptation for CALIFES in progress (200 MeV, 1.5 A, 21 ns, 5 Hz)

CTF3-CLEX meeting June 12, 2006page m 22 m CLEX building CALIFES should fit into CLEX building... the last dipole could include 3 branches: straight to 2-beam teststand 15° to Beam Dump 30° to Instrumentation Test Beam

CTF3-CLEX meeting June 12, 2006page 30 Time-schedule

CTF3-CLEX meeting June 12, 2006page 31 Can we have a closed area for Califes ? Which girders can we re-use from CERN ? Who does the cabling between the Califes components and the racks ? Alignment: studied by Michel Fontaine from Dapnia who is the CERN contact person ? Questions List

CTF3-CLEX meeting June 12, 2006page 32 Cooling needs