Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

1 Project Nexus Analysis of impacts and next steps Cesar Coelho Ofgem Project Nexus UNC Workgroup 03 April 2012.
Review of industry code governance 26 March 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Code Governance Review Initial Proposals Industry Codes and Licensing Ofgem.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
Structure of Charges: Update and next steps DCMF 10 September 2008.
Industry Dialogue on xoserve Services 14 th September 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Design and buildTestShadowGo live Oct 15Nov 15Dec 15Jan 16Feb 16Mar 16Apr 16May 16Jun 16Jul 16Aug 16Sep 16Oct 16Nov 16Dec 16Jan 17Feb 17Mar 17Apr 17 Oct.
European Developments Transmission Workgroup 3 rd May 2012.

EU Implementation Programme
Grid Code What is the Standard Modification Process? Panel
Transmission Planning Code – Draft Document
Code Governance Review UNC Modification Proposals
Grid Code Review Panel 16th August 2017
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
UNC Trader User – Licence obligations


NTS Entry Charging Review Update
UNC Mod 273 – Governance of Feasibility Studies
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
CSS Update for CoMC 19th September 2018
Exit Capacity Substitution and Revision
Proposer: Malcolm Montgomery Panel Date: 20/10/16
Transmission Planning Code Review
Proposer: Transporter /
PARCA Timeline.
Revised Tender Timescale for DN Interruption Arrangements
Gas Customer Forum DN Interruption Update - Introduction
Mark Freeman 29th January 2007
Modification 0448 – European Driven Change Process Flow Diagram
Options for the Development of a Demand Side Response Mechanism
Generic Revenue Driver Methodology
Transmission Workstream DN Interruption Update - Introduction
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Gas Customer Forum 28 July 2008
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Development of a Demand Side Response Mechanism UNC Panel Meeting 19 June 2014

Customer Engagement so far  DSR concept 121s held through April & June with various industry parties to gain initial understanding of their:  Needs,  Opinions  Concerns  Ideas  Outcome of 121s, and Ofgem SCR policy decision consultation responses, provide initial building blocks for DSR Methodology  Continued development of DSR Methodology would now benefit from a more centralised collaborative industry engagement.  Intend to issue a ‘Survey Monkey’ to better understand stakeholder position and appetite for the DSR mechanism

DSR Methodology and Mechanism Timescales Submit a draft Methodology to Ofgem May 2014 – Jan /03/2015 Industry Development of a draft DSR Methodology & DSR Mechanism Industry / workgroup consultation on methodology - Jan 2015 May – Jul Run Trial (subject to Authority Direction) Sep - Dec Complete Final Modification and consult Implement methodology & mechanism 01/10/2016 Submit report on trial to Ofgem ??? Ofgem decision ? Feb - Sep System Design, Build, Test & Implementation ? Summer 2014 Stat consultation on Licence changes Stage one Stage two

DSR proposed plan and timescales