Generic Revenue Driver Methodology

Similar presentations


Presentation on theme: "Generic Revenue Driver Methodology"— Presentation transcript:

1 Generic Revenue Driver Methodology
May 2013

2 Overview We are required to have submitted a Generic Revenue Driver Methodology by 1st September 2013 following the RIIO-T1 outcome and Licence changes A draft GRDM was consulted on in October 2012 with the intention to update following final proposals Required changes; Removal of references to pipeline build complexity as this is no longer a factor in pipeline unit costs Clarification of the trigger point for calculating RDs The following slide represents a high level plan for the re-consultation to deliver this obligation.

3 Draft Plan Activity Detail Dates/Time Development
Update methodology based on initial consultation responses and accepted final proposals May Examples Identify examples and apply methodology May/June (4 weeks) UNC Tx Workgroup Notify industry of intention to consult at June Tx Workgroup. Reminder and Q&A opportunity at July Tx Workgroup. June & July Consultation Industry consultation June/July (28 days) Revisions Update based on consultation responses July Submission Submit to Ofgem for approval July/ August Decision Authority decision September/ October Effective GRDM becomes effective – publish on NG website 1st November


Download ppt "Generic Revenue Driver Methodology"

Similar presentations


Ads by Google