End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.

Slides:



Advertisements
Similar presentations
WP7 ATLAS ID Barrel End Services T.J.FRASER UCL Aim: Using experience gained from work on the current ATLAS SCT Barrel, attempt an improved design and.
Advertisements

Barrel services minimum space allocation in Z ‘Strawman’ layout and Spider… layout WARM and COLD GAP versions Services envelope in Z: In order to reserve.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
US Bracket Support for Stave D. Lynn (BNL), LBNL Mechanical Meeting, Sep
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
CO 2 return pressure drop budget and pipes from PP2 to tracker Georg Viehhauser.
2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts 2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN  The objectives  Module positioning.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
HEP GROUP MEETING work on the ATLAS UPGRADE T.J.Fraser.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Progress on staves – mechanical & thermal. Core and materials.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
SCT Barrel 6 Support Bearing A full-scale model of the barrel 6 support bearing has been machined at UCL (drawing G.Barbier ) It was tried out on both.
S Temple CLRC1 End-cap Mechanics FDR Power Tapes and Optical Fibres Steve Temple, RAL 1 November 2001.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
Stave 130 Envelope Peter Sutcliffe Strip Mechanics 20 th February Lancaster.
Stave Core Thermo-mechanical and Electrical Performance Requirements (Tim) 10/07/2013Liverpool WP4 Meeting (11/7/13)1.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Comments on Engineering talk by A. Catinaccio at Inner Tracker Engineering Meeting CERN ) Fixed length barrel layout drawing by C. Bault (Strawman.
15th January 2014 WP4 Meeting Oxford1 EoS PCB Mike Dawson University of Oxford.
1 David Santoyo sLHC OXFORD 17/06/2010 EC Structure Review ? ? ? ? ? ? IFIC-Valencia.
PACKAGE FABRICATION TECHNOLOGY Submitted By: Prashant singh.
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
ATLAS Internal ID Service Integration
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Update of MVD services and requests
Hybrid Pixel R&D and Interconnect Technologies
? ENDCAP: Mechanics IFIC-Valencia.
Mechanics: (Tim).
Services Layout – Update
HPS Motherboard Electronic Design
Equipment for Assembly – UK Experiences
First of all we will remind some numbers:
SIT AND FTD DESIGN FOR ILD
OCP Mezz 3.0 Mechanical Recommendations
Pixel Detector System (Barrel & Forward)
After service guide for changing PCB
Presentation transcript:

End-of-stave region

2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277 Edge of stave is given by number of traces which need to get routed around last module –Probably requires one HV per stave side Then interlinks and service gap (incl. space for bends and tooling) Then insertion clearance (here 20mm) Then envelope of first disk –Driven by EOP card (optoconverter) Need to optimize all of these This needs to be 1415 Lacking 45mm Current best estimates:

3 Services Goal is to prevent external loads on stave –During installation –During operation (mostly thermal) –Support from interlink or endflange Electrical (LV, HV, DCS): –1 connector per side –Preferred solution: flex-rigid (trace layer from EOS card extended flexibly, ending on another PCB for connector) –Connector PCB supported by interlink or endflange Cooling pipes –Fully clamped from interlink or endflange –But not overconstraining stave position… Optical –1 Optoconverter per side –Fibres (single fibres in furcation tubing) will drive how far back optos will sit.

4 Cooling pipe add-ons Ground connection close to EOS –Clamp, connected to EOS with braid? –Could maybe be included into clamping to interlink/endflange Electrical break –Having it close to stave would make management of type I pipes easier –Also could help insulating stave electronics for orbital welding –Placing break before clamp would nicely protect it mechanically But it would require more z-space, and Requires separate ground connection clamp Transition to larger (smaller) diameter and wall? –This could simplify final stave connection –Could be part of the insulating break design DCS interlock sensors –Would like to avoid separate clamps (like in barrel SCT) –Either place it as SMD on end of tape Compact, no dangling wires, just trace to EOS, but requires z-space –Or integrate into mechanical clamping to interlink/endflange

5 Interlinks I prefer continuous interlinks –I don’t think we will find 2 slices per quadrant where we can bring out the interlink without being on top of services – that means that interliks would take additional z-space –I suspect continuous interlinks give higher torsional stiffness between cylinders (weak modes) If we do continuous, when do we mount interlink? –Before insertion: Have good access, but insertion tooling needs to provide space –After insertion