MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.

Slides:



Advertisements
Similar presentations
MICE CM January 2009Jean-Sébastien GraulichSlide 1 DAQ and CAM Summary o Organization o Control and Monitoring o Detector DAQ o Online Monitoring o Front-End.
Advertisements

MAUS Update Adam Dobbs, MICE Project Board, 16 th April 2015.
Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
1 Databases in ALICE L.Betev LCG Database Deployment and Persistency Workshop Geneva, October 17, 2005.
Grid and CDB Janusz Martyniak, Imperial College London MICE CM37 Analysis, Software and Reconstruction.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
Data Quality Assurance Linda R. Coney UCR CM26 Mar 25, 2010.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
1 Configuration Database Review David Forrest University of Glasgow RAL :: 1 st June 2009.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
Y. Karadzhov MICE MICO First EMR Plots 1.EMR detector has been successfully incorporated in the MICE DAQ system. 2.First 3 days of data taking in MICE.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva.
Linda R. Coney – 24th April 2009 Online Monitoring and Reconstruction Linda R. Coney 4 June, 2009.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
Software Summary 1M.Ellis - CM23 - Harbin - 16th January 2009  Four very good presentations that produced a lot of useful discussion: u Online Reconstruction.
SOFTWARE & COMPUTING Durga Rajaram MICE PROJECT BOARD Nov 24, 2014.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
MICE VC June 2009Jean-Sébastien GraulichSlide 1 Feed back from the DAQ review o Facts o Detector DAQ o Important Comments o Bottom line Jean-Sebastien.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
Configuration Database MICE Collaboration Meeting 28, Sofia David Forrest University of Glasgow Antony Wilson Science and Technology Facilities Council.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
Configuration Database Antony Wilson MICE CM February 2011 RAL 1.
MICE CM June 2009Jean-Sebastien GraulichSlide 1 Online Summary o Achievements Since CM23 o Control Room o Controls o Detector DAQ o Open Issues o Summary.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
MOG Aug 2010J.S. GraulichSlide 1 Comments on User Run o All went pretty well but we can always improve Jean-Sebastien Graulich, Geneva.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring Summary of DAQ WS III o General Architecture o RF System C&M o D0 EPICS extensions.
G4MICE Status and Plans 1M.Ellis - CM24 - RAL - 31st May 2009  Firstly, a correction to the agenda:  I failed to spot a mistake in the agenda that I.
Hall-D/GlueX Software Status 12 GeV Software Review III February 11[?], 2015 Mark Ito.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
Technical Validation The Technical Validation is a testing framework of the AUGER offline to monitor the code development process. It is not a validation.
Controls & Monitoring Status Update J. Leaver 05/11/2009.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
Database David Forrest. What database? DBMS: PostgreSQL. Run on dedicated Database server at RAL Need to store information on conditions of detector as.
November 1, 2004 ElizabethGallas -- D0 Luminosity Db 1 D0 Luminosity Database: Checklist for Production Elizabeth Gallas Fermilab Computing Division /
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
MICE Online Group Linda R. Coney UCR MICE CM31 UMiss October 2011.
Coney - CM36 - June Online Overview L. Coney – UCR MICE CM36 – June 2013.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Linda Coney MICO June 6, 2011 MICE Online Report.
MICE Computing and Software
Jean-Sebastien Graulich, Geneva
Offline Software A. Dobbs CM43 30th October 2015.
EUDAQ Status Report Emlyn Corrin, 29 September 2010
Online Software Status
Controls & Monitoring in MICE
Tracker Software Status
Presentation transcript:

MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger System upgrade o Schedule Milestones o Summary Jean-Sebastien Graulich, Geneva

MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 2 Achievements since CM27  DAQ system has been upgraded During user run in July  Progress in DAQ/CAM integration DATE Status used by alarm handler CAM data ready to be included in the data stream  Online Software Unpacking: Exception handling Online Monitoring debugging

DAQ System Upgrade  Happened in mid July Standard Online OS (Centos 5.4) installed New version of DATE New set of PCs (miceacq07, miceacq08, miceraid2a)  Problems Solved  Problems Solved Standard system backup and restoration procedure Compatibility with James Software -> allowed talking with CAM Online Software repository Replacement of the faulty VME/PCI interface causing synchronisation problems MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 3 All user files on miceacq04, miceaq06 and miceraid1a will disappear !

DAQ System upgrade (2)  Problems Caused  End of Run script don’t work -> automated move file for storage won’t work Alternatives exist All Online Reconstruction applications broken !!! The data source was hardcoded The procedure to edit and recompile the code was not documented  About ½ day of beam time lost but a lot of lessons taken from that crisis MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 4

MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 5 CAM/DAQ integration (1)  DATE talks to EPICS There is an EPICS Process Variable dedicated to DAQ status DATE uses James’ library to write its status: TAKING_DATA, RUN_COMPLETE, IDLE or ERROR  Necessary for Automatic filling of CDB DAQ alarm handling (Pierrick Hanlet) DAQ alarms implemented so far: - Particle trigger mismatch (event building error - now very rare) - Particle trigger rate drops to 0 (ISIS trip) - Particle trigger rate larger than 150/spill (event too big for monitoring)  Drawback Run Time Dependency DAQ won’t start if the DATE Status EPICS server is not running

MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 6 CAM/DAQ integration (2)  EPICS talks to DAQ DATE is able to read any EPICS Process Variable at the end of the spill and insert it in the data stream  Necessary for Access to Magnet currents in offline and online analysis  Drawback Unpacking backward compatibility in case (very likely) the list of variables changes Reminder: Configuration Database contains SET values (and some meta data) EPICS Archiver stores READ values but it is not synchronized with the Spill A subset of critical READ values, necessary for analysis, are included in the data file so that the analysis doesn’t require a connection to the CDB

MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 7 FAQ  Why not getting the magnet currents from the CDB ? Because the CDB contains the set value and you want to know the real field the particle has seen to reconstruct its trajectory  But the alarm handler checks that the currents are close enough to the set values We don’t know a priory if the alarm handler limits on those variables are valid  What if I want to check that the read value is close enough to the set value ? Online, this is done by the alarm handler Offline, if you have doubt, you can connect to the CDB to get the set values and then loop over the spill to do your checks

MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 8 Online Software  Bug fixed in Online Monitoring:  Data format exception (invalid event) One fADC board (used by CKOV) is producing corrupted data header : event size information is wrong Data unpacking was crashing Now, the spill is skipped  TDC errors (unexpected word) A damaged cable was causing a large number of hits in TDC05 (used for KL tags) TDC overflow word in the data flow was not recognized by the unpacking -> error message  Run transition Online Monitoring GUI had to be deactivated at the end of each run, otherwise it was frozen and had to be restarted

MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 9 Online Software (2)  Main open issues:  Online Monitoring should run from files Using the very same analysis code ! Also true for online reconstruction applications Up to now, we maintained two codes differing by only a few lines File version of Online Monitoring is broken -> We can’t reproduce online plots !  Tracker DAQ and unpacking Code exists but is not compatible with the existing framework -> David Adey  Unpacking of EPICS data Nobody can use it if it’s not unpacked

MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 10 Schedule Milestones  From CM27  CAM data in Online Data Stream ready but not yet used  DAQ System upgradeJuly 10  DAQ in alarm handler (audible alarm)July 10  Unpacking and Monitoring software releaseAugust 10  Tracker integrated in DAQ and OLMJuly 10 -> Nov 10  Trigger System upgrade (+documentation)August 10 -> Dec 10  TOF TDC Clock SynchronizationDec 10 Do we really need it ?  Burst Gate Signal in the Trigger System  Burst Gate Signal in the Trigger System Need support here  New Milestones  Unpacking of EPICS data Nov 10  New Online Software release (OLM from files)Dec 10  EMR integrated in DAQ and OLMMarch 11

Summary  DAQ System upgrade done  DAQ in Alarm handler  Online Software debugging  Integration of Tracker DAQ has started MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 11