CJK IMT 28 Xi’an, China 2-3 Jun. 2011 CJK IMT 28, Xi’an, China 1/4 CJK-IMT28-006 Results of 10 th Meeting of WP 5D in Are ~ WG Spectrum Aspects ~ TANNO,

Slides:



Advertisements
Similar presentations
ITU-R activities related to TDR Colin Langtry Counsellor Radiocommunication Study Group 8 Workshop on Telecommunications for Disaster Relief, February.
Advertisements

WRC–12 Industry Debrief 23 April 2012 Agenda item 1.5 – Electronic News Gathering Presenter: Andrew King on behalf of Roger Bunch.
Doc.: Submission November 2012 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Closing Report Notice: This document has been prepared.
Doc.: 18-11/58r0 Submission July 2011 John Notor, Notor ResearchSlide 1 Summary of ITU-R Documents Notice: This document has been prepared to assist IEEE.
11 ITU-R Liaison Group Report - Session #82 Closing Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: Gdoc Date.
1 HAP Spectrum Sharing Studies in the 28/31 GHz Band Y.H. Kang.
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/4 CJK-IMT Possible contribution for Revision of Rec. ITU-R M.1580/1581 ATARASHI,
01/06/2015 ITU-R Studies in GRSC high interest subjects Progress Report F. Leite, ITU-R 1GSC-9, Seoul SOURCE:ITU-R TITLE:ITU-R Studies in GRSC HIS - Progress.
Review of ITU-R Study Group Activities Kevin A. Hughes Radiocommunication Bureau.
SE35presentation.ppt France Telecom R&D CEPT ERC SE35 activities on compatibility between radio services and PLT (Power Line Telecommunications) Dubrovnik,
WRC-15 Agenda Item 1.3 Broadband Public Protection & Disaster Relief (PPDR) XXV MEETING OF CITEL PCC.II February 23-27, 2015 Medellin, Colombia - For Information.
Broadband over Power Line ARRL Statement Paul L Rinaldo Chief Technology Officer American Radio Relay League Tel: , Fax:
LSA in the 2.3 – 2.4 GHz band Bruno ESPINOSA, ECO Trial LSA workshop, Helsinki, 3rd September.
GSC-19 Meeting, July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery.
Coexistence challenges in the UHF band Bruno ESPINOSA European Communications Office (ECO) Overview of CEPT/ECC actions.
1 9 th CJK NID WG, Beijing, China Status report on USN related activities in ITU-T Q.25/16 Document number Beijing, China July 2009 Hyoung Jun KIM,
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.8 – Fixed services in bands between 71–238 GHz Presenter: Paul Hettrick.
WMO Workshop on Radio Frequencies for Meteorology Meteorological Satellite Services David F. McGinnis U.S. Dept. of Commerce, NOAA 7 October 2002 Geneva,
GSC: Standardization Advancing Global Communications Review of GRSC3 meeting SOURCE:ETSI TITLE:Review of GRSC3 AGENDA ITEM:GRSC4 3 CONTACT:Karl Heinz Rosenbrock.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04r1 Source:
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:
1 CJK9, Zhangjiajie, China (CJK B3G #20) Summary of AWF-6 (31 st March – 3 rd April, Danang, Vietnam Zhangjiajia, China 8-10 April 2009 Juyeon Song
Doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
ITU-R Liaison Group Report - Session #73 Closing Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0029 Date.
Sg-whitespace SubmissionRashid A. Saeed, Telekom MalaysiaSlide 1 February 2009 Slide 1 Work in the ITU: Focus on how 802 can best leverage.
CJK IMT 28 Xi’an, China 2-3 June /n CJK IMT 28, Xi’an, China CJK-IMT Summary of AWG-10 HIROIKE, Akira
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
1/6 CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China CJK-IMT Possible Contribution to 11 th Meeting of WP5D ~ Related to Report ITU-R.
7 th ITU-R WP5D Meeting Summary February 17-24, 2010 Orlett W. Pearson March 2010.
Detection and the impact of man-made interference on EES (passive) operations Thomas vonDeak NASA Spectrum Management Office 28-October-2004 “Active Protection.
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/7 CJK-IMT Way forward on Chapter 4 of CJK White Paper by SIG-Future IMT ATARASHI,
Nairobi, Kenya September 2007 Preparations for WRC-07 Overview of Regional and National proposals as of 13 September 2007 Presented by Robert Witzen.
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.2 – Future WRC Agendas.
20 th EMC WP / TCAM EG 5 – CENELEC Standardization Report Publication of recast EMCD, LVD and RED CLC/TC 65X (Industrial Wireless Automation) 800 MHz Decision.
Agenda Item: 1.3 Title: “to review and revise Resolution 646 (Rev.WRC ‑ 12) for broadband public protection and disaster relief (PPDR), in accordance with.
Role of World Radiocommunications Conference and European preparations for WRC Stella Lyubchenko 4 th CEPT Workshop on European Spectrum Management and.
AI MHz MHz ECC DEC (15)01 + CEPT report 53 ECC-FCC-IC Liaison Meeting Maisons Alfort, May 2015 Didier Chauveau ECC PT1 Chairman.
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/4 CJK-IMT Possible Contribution to 11th Meeting of WP5D ~ Related to Updating of.
Agenda Item: 1.8 Title: to review the provisions relating to earth stations located on board vessels (ESVs), based on studies conducted in accordance with.
Decisions of RA-15 and WRC-15 with Special Relevance to Developing Countries Решения AR-15 и ВКР-15 в особенности касающиеся развивающихся стран Иштван.
Realizing Green ICT Dream with TTA Review of General WG activities at ITU-R WP5D#10 CJK IMT 28 Xi’an (西安), China June 2 ~ 3, 2011 SONG, Juyeon Samsung.
Use of Spectrum Bands Above 24 GHz For Mobile Radio Services ‘5G’…
Agenda Item: 1.12 Title: Extension of current worldwide allocation to the Earth exploration–satellite (active) service in the frequency band 9300– 9900.
7 th ITU-R WP5D Meeting Summary February 17-24, 2010 Orlett W. Pearson March 2010 Copyright Statement. Alcatel-Lucent grants a free, irrevocable license.
Delivering the standards and spectrum to fuel 5G
ITU-R activities on WRC-19 AI 1.12
Cindy Cook Chairman, TG 5/1 November 2, 2016
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
GSC IMT Task Force Report
SADC WRC-15 Preparatory Meeting
Coexistence challenges in the UHF band
Challenges and opportunities for CEPT
Studies on 5 GHz extension bands for WAS/RLANs
ITS-Related Work Items in ITU-R Study Group 5, Working Party 5A
January 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Liaison Report on for January 2017]
European 5G regulatory developments
RSPG 34th Plenary Meeting
IMT-2020 Process Presentation to the IEEE 5G group (24 June 2016)
EU-US-JP ITS Steering Group Annual Meeting 2018
ITU Radio Issues in 2003 Progress Report ITU-R GSC /01/2019
GSC IMT Task Force Report
SADC WRC-15 Preparatory Meeting
Sergio Buonomo Counselor ITU-R Study Group 5
COSPAR SA 2008, E110 IUCAF session
Status report from ITU-R WP 5A on ITS activities
Possible Future Agenda Items
Inmarsat Position on WRC-19 Agenda Item 9.1 Issue 9.1.1
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
Presentation transcript:

CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/4 CJK-IMT Results of 10 th Meeting of WP 5D in Are ~ WG Spectrum Aspects ~ TANNO, Motohiro

2/4 CJK IMT 28, Xi’an, China Sharing Studies (1) (1) PDNR ITU-R M.[IMT.MITIGATION]  The PDNR ITU-T M.[IMT.MITIGATION] was further updated.  Mitigation techniques of use of low power cellular indoor coverage and additional filtering were newly included.  A liaison statement was developed to WP 4A to inform the progress on the document.  A liaison statement was developed to WP 3K and WP 3M to ask for guidance on the usage of buildings information with the propagation model in Recommendation ITU-R P.452. (2) UHF Sharing Studies  The working document towards a PDN Report was updated, which addresses sharing and compatibility studies in the UHF band relevant to Resolution 224 (Rev. WRC-07) and not addressed by JTG 5-6.  A liaison statement was developed to WP 5A to ask for advise and information regarding a) the PPDR system parameters and b) the question whether the document should be broadened to also include the protection of PPDR systems.

3/4 CJK IMT 28, Xi’an, China Sharing Studies (2) (3) Isolation for antennas of base stations  This work addresses isolation for antennas of base stations in the land mobile service including IMT.  The PDN Report was further updated, and it was decided to elevate its status to DN Report.  A liaison statement was developed to ITU-T SG5 (copied to WP 1A and WP 5A) to keep them informed of the completion of the work. (4) Other liaison statements  Liaison statement to WP 6A to answer the questions on LTE system and signal characteristics for sharing studies between IMT and DTTB.  Liaison statement to WP 1A to inform IMT characteristics, deployment scenarios, and criterion to protect IMT for the study of interference caused by ISM equipment  Liaison statement to ITU-T SG5 to inform that WP 5D will provide further comments on the working document on possible disturbance between IMT and broadband cable and TV networks as appropriate.  Liaison statement to WP 1A to inform that WP 5D has a concern about PLT emissions.  Liaison statement to WP 5C to recommends that WP 5C not consider the bands identified for IMT as potential tuning ranges for ENG.

4/4 CJK IMT 28, Xi’an, China Frequency Arrangements (1) (1) Revision of Recommendation ITU-R M.1036  The work aims to includes additional frequency arrangements to reflect the results of WRC-07.  The preliminary draft revision of Recommendation ITU-R M was further updated.  It was agreed to continue the work until the 12 th meeting of WP 5D.  The remaining issue is the frequency arrangement for the GHz band.