Presentation is loading. Please wait.

Presentation is loading. Please wait.

GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery.

Similar presentations


Presentation on theme: "GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery."— Presentation transcript:

1 GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR) -ITU-R: Disaster prediction, detection, mitigation, relief Dr Leo Lehmann, Chairman ITU-T Study Group 13, former vice-chairman ITU-T FG- DR&NRR Colin Langtry, Chief, ITU-R Study Group Department Document No:GSC-19_109 Source:ITU Contact:Dr Leo Lehmann, Colin Langtry Agenda Item:3.9

2 GSC-19 Meeting, 15-16 July 2015, Geneva FG DR&NRR deliverables http://www.itu.int/en/ITU-T/focusgroups/drnrr/Pages/default.aspx DeliverabalesTitleTransferred SGs Relevant SGs (Information sharing) FG-Overview Overview of disaster relief systems, network resilience and recovery Continue to be examined by ITU-T SG2 ITU-T SG13, SG16, SG17, JCA-AHF, ITU-D Q5/2, ITU-R SG5 FG-Frame Disaster Relief Systems, Network Resilience and Recovery (DR&NRR): Promising technologies and use cases FG-Gap Gap Analysis of Disaster Relief Systems, Network Resilience and Recovery FG-Term Terms and Definitions for disaster relief systems, network resilience and recovery Transferred to ITU-T SG2 with the aim of making new Recommendations FG-DRRequirements for disaster relief systems FG-NRRRequirements for network resilience and Recovery Transferred to ITU-T SG15 with the aim of making new Recommendations FG-MDRU Requirements on the improvement of network resilience and recovery with movable and deployable ICT resource units (MRDU) FG-TR Technical report on telecommunications and disaster mitigation Transferred to SG2 Note: all the deliverables above are published at http://www.itu.int/pub/T-FG/ehttp://www.itu.int/pub/T-FG/e

3 GSC-19 Meeting, 15-16 July 2015, Geneva Arising activities in ITU-T Study Group 2  Requirements for Disaster Relief Mobile Message Service (text/voice)  Requirements for Disaster Relief Systems (draft E.RDR, under study)  Terms and definitions for DR&NRR (draft E.TD-DR, under study)  Requirements for Safety Confirmation and Broadcast Message Service for Disaster Relief (draft E.RDR-SCBM under study) Determined E.108

4 GSC-19 Meeting, 15-16 July 2015, Geneva Arising activities in ITU-T Study Group 15  Disaster management for improving network resilience and recovery with movable and deployable ICT resource units (L.dm-nrr-mdru under study)  Framework of disaster management for network resilience and recovery (L.nrr-frm under study)

5 GSC-19 Meeting, 15-16 July 2015, Geneva Disaster phases Major radiocommunication services involved Major tasks of radiocommunication services Studies carried out by Radiocommunica tion Prediction & Detection Meteorological services (meteorological aids and meteorological-satellite service) Earth exploration-satellite service Weather and climate prediction. Detection and tracking of earthquakes, tsunamis hurricanes, typhoons, forest fires, oil leaks etc. Providing warning information Study Group 7 Alerting Amateur servicesReceiving and distributing alert messagesStudy Group 5 Broadcasting services terrestrial and satellite (radio, television, etc.) Disseminating alert messages and advice to large sections of the public Study Group 6 Fixed services terrestrial and satelliteDelivering alert messages and instructions to telecommunication centres for further dissemination to public Study Group 5 Study Group 4 Mobile services (land, satellite, maritime services, etc.) Distributing alert messages and advice to individualsStudy Group 5 Study Group 4 Relief Amateur servicesAssisting in organizing relief operations in areas (especially when other services are still not operational) Study Group 5 Broadcasting services terrestrial and satellite (radio, television, etc.) Coordination of relief activities by disseminating information from relief planning teams to population Study Group 6 Earth exploration-satellite serviceAssessment of damage and providing information for planning relief activities Study Group 7 Fixed services terrestrial and satelliteExchange of information between different teams/groups for planning and coordination relief activities Study Group 5 Study Group 4 Mobile services (land, satellite, maritime services, etc.) Exchange of information between individuals and/or groups of people involved in relief activities Study Group 5 Study Group 4 Overview of work in ITU-R Study Groups

6 GSC-19 Meeting, 15-16 July 2015, Geneva Current activities in Working Party 5A Land Mobile Systems above 30 MHz*(excluding IMT); wireless access in the fixed service; amateur and amateur-satellite services Draft New Report M.[PPDR] “Public protection and disaster relief communications”. This report addresses: the categorization of technical and operational requirements relating to PPDR; the current use of narrow and wide-band PPDR; the mobile broadband PPDR services and applications including further developments and the evolution of PPDR through advances in technology; the needs of developing countries. The Report is expected to be finalized and approved by ITU-R Study Group 5 on 21 July 2015

7 GSC-19 Meeting, 15-16 July 2015, Geneva Backup

8 GSC-19 Meeting, 15-16 July 2015, Geneva Disaster relief by ITU ITU contributes to disaster prevention and response from the telecommunication/ICT aspect since many years Disaster relief activities include preparation for possible disasters, early detection, rescue, evacuation assistance, safety confirmation, recovery assistance, etc. ITU and it’s partners deploy satellite terminals and other emergency telecommunication equipment to affected countries within the first 24 to 48 hours aftermath a disaster to help restore vital communication links.

9 GSC-19 Meeting, 15-16 July 2015, Geneva Mission of the Focus Group Disaster relief for individuals (notify damage situation from victims) disaster relief guidance (show victims the routes to evacuation shelters, home) Network resilience and recovery capability of infrastructure to cope better with disasters

10 GSC-19 Meeting, 15-16 July 2015, Geneva Integrated view of networks supporting disaster relief services

11 GSC-19 Meeting, 15-16 July 2015, Geneva Radiocommunications Assembly 2007 (RA-07) approved Resolutions ITU-R 53 and ITU-R 55 instructing all ITU-R Study Groups to carry out studies on the use of radiocommunications in disaster prediction, detection, mitigation and relief.ITU-R 53ITU-R 55 In 2012 RA-12 revised and confirmed those Resolutions WRC-12 agreed upon Agenda Item 1.3 for WRC-15: “to review and revise Resolution 646 (Rev.WRC 12) for broadband public protection and disaster relief (PPDR), in accordance with Resolution 648 (WRC-12)”. In addition, WRC-12 revised Resolutions 644, 646, and 647. Nearly every Study Group within the ITU-R has a role to play in Disaster Relief ITU-R focus on disaster prediction, detection, mitigation and relief


Download ppt "GSC-19 Meeting, 15-16 July 2015, Geneva Standardization activities in ITU: -ITU-T Focus Group on Disaster Relief Systems, Network Resilience and Recovery."

Similar presentations


Ads by Google