1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,

Slides:



Advertisements
Similar presentations
On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
Advertisements

TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
Motor Control Lab Using Altera Nano FPGA
ESODAC Study for a new ESO Detector Array Controller.
A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
Y. Gao & P. Gay FCPPL FEE for ILC Calorimeter Development 1 Front-End-Electronics for ILC Calorimeter Development G. Blanchard, P. Gay,
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
D EVELOPMENT & T ESTING : ADC BOARD FOR THE P ROMETEO T EST - BENCH MATTHEW SPOOR University of the Witwatersrand HEPP 2015.
Conversion Between Video Compression Protocols Performed by: Dmitry Sezganov, Vitaly Spector Instructor: Stas Lapchev, Artyom Borzin Cooperated with:
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France LHCb upgrade meeting Tests tools Status for Analog and Digital parts  Tools to test.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France LHCb upgrade meeting Tests tools for Analog and Digital parts  Typical acquisition sequence.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
FPGA IRRADIATION and TESTING PLANS (Update) Ray Mountain, Marina Artuso, Bin Gui Syracuse University OUTLINE: 1.Core 2.Peripheral 3.Testing Procedures.
David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Introduction to FPGA Created & Presented By Ali Masoudi For Advanced Digital Communication Lab (ADC-Lab) At Isfahan University Of technology (IUT) Department.
An Unobtrusive Debugging Methodology for Actel AX and RTAX-S FPGAs Jonathan Alexander Applications Consulting Manager Actel Corporation MAPLD 2004.
SPD Control Board 16th February SPD Control Board (VFE control and SPD multiplicity) VFE’s control (I2C communication: SDA,SCL; clock; reset/trigger.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Low Voltage Power Supplies I.Placement II.Size III.Power consumption IV.Cabling V.Regulators board blocs VI.Component selection VII.Schematics VIII.Firmware.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Status of NA62 straw electronics Webs Covers Services Readout.
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
Beam diagnostics developments at LAPP: Digital part CTF3 Collaboration Meeting Louis Bellier, Richard Hermel, Yannis Karyotakis, Jean Tassan,
AFE Meeting June 5, 2001 SIFT UPGRADE Marvin Johnson.
LHCb Calorimeter Upgrade Meeting – 10th September 2012 – CERN LHCb Calorimeter Upgrade Electronics: ASIC solution status E. Picatoste, D. Gascon Universitat.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 SysCore for N-XYTER Status Report Talk by Dirk Gottschalk Kirchhoff Institut für Physik Universität Heidelberg.
LHCb Calorimeter Meeting – 2 nd December 2015 Calorimeter upgrade update Universitat de Barcelona, Institut de Ciències del Cosmos ICC-UB Laboratoirede.
High Speed Digital Systems Lab Spring/Winter 2010 Project definition Instructor: Rolf Hilgendorf Students: Elad Mor, Ilya Zavolsky Integration of an A/D.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
LHCb – Calo Upgrade Meeting – 20th October 2013 – CERN Upgrade Calo FE Review Comments: Analog D. Gascon for the LHCb calo group Universitat de Barcelona.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Standard electronics for CLIC module. Sébastien Vilalte CTC
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Olivier Duarte December th 2009 LHCb upgrade meeting Tests Front-end Status  Necessity.
Calorimeter CROC PRR CERN Calorimeter ReadOut Card PRR Tests of the CROC Calo CROC PRR – Tuesday 19 December 06.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
J.Maalmi, D.Breton – SuperB Workshop – Frascati – September 2010 Electronics for the two-bar test. D.Breton & J.Maalmi (LAL Orsay)
Summary of the Barcelona Meeting March 10 th and 11 st, 2009 Calorimeter Upgrade Meeting Frédéric Machefert On behalf of the Barcelona and Orsay Groups.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
Relative crate phase measurement Olivier Deschamps Jacques Lefrançois Frédéric Machefert Stéphane T'Jampens Frédéric Machefert – Calorimeter Meeting.
ASICs1 Drain Current Digitizer Chip (DCD) Status and Future Plans.
1 ECAL/HCAL FEB and CROC. FEB serialisers Serialiser tests GANIL Irradiation test. CROC bit flip error modifications and tests Calorimeter Detector/Electronics.
Giovanna Lehmann Miotto CERN EP/DT-DI On behalf of the DAQ team
Introduction LOI Hardware activities and GBT Simulations
Update on CSC Endcap Muon Port Card
Christophe Beigbeder PID meeting
DCH FEE 28 chs DCH prototype FEE &
Ongoing R&D in Orsay/Saclay on ps time measurement: a USB-powered 2-channel 3.2GS/s 12-bit digitizer D.Breton (LAL Orsay), E.Delagnes (CEA/IRFU) Séminaire.
Calorimeter Upgrade Session : News
Front-end digital Status
Calorimeter Upgrade Meeting - News
University of California Los Angeles
Tests Front-end card Status
PID meeting Mechanical implementation Electronics architecture
First thoughts on DIF functionality
The QUIET ADC Implementation
Course Code 114 Introduction to Computer Science
Presentation transcript:

1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st, 2009

2 Frédéric Machefert - Calorimeter Commissioning Meeting FPGA : AX or PA3 ? (I)‏ Two problems have been observed with the APA FPGA When two many bits flip altogether and quickly, the signals seen after the input buffers of the FPGA are corrupted. This is hardly documented by the manufacturers and the acceptable limits (number of bits flipping, average rate) depend on the implementation. When sending several bits on the FPGA inputs, the internal sampling of the signals by a unique external clock (and in spite of the usage of a dedicated clock tree) seems to be done with phase shifted clocks among the registers. This makes « synchronized » sampling of fast signals more difficult. It seems that we need to perform our own tests in order to find and be persuaded of the “good” solution. Two ways of testing the FPGA have been thought of : Having a prototype dedicated specifically to that problem, Using the FE-prototype to test the FPGA capabilities. It appeared that the second way is not favoured as it would increase the complexity of the design of the FE-prototype both in term of PCB and firmware.

3 Frédéric Machefert - Calorimeter Commissioning Meeting FPGA : AX or PA3 ? (I)‏ Hence, we think that two prototypes have to be made. A first prototype to study the performances of the components. The second prototype would integrate a digital readout of the analog signals and be the FE-prototype. This means that the latter would be delayed in time as the first conclusions on the former need to be obtained. ProAsic3 seems to be easier to use (reprogrammable) and would be the baseline. Still, we may imagine that it cannot cope the signals exchanged. The AX would be the backup solution. But, we also have to prove that the AX may work. On the present front-end board we benefited a lot from the Silicon Explorer to debug the firmware. This does not exist on the APA. It seems that something similar exists on the ProAsic3 (Olivier). The following questions were raised : Price of this system, Resources needed to make it work.

4 Frédéric Machefert - Calorimeter Commissioning Meeting First Prototype (I)‏ The first prototype would include A ProAsic3 A socket to receive an AX The possibility to exchange data Between the AX and the APA From an FPGA to itself A SPECS mezzanine connector A digital readout connector : the possibility to perform a readout of the digital implementation was thought of at this level. We imagined to have a connector on our prototype and be able to connect a mezzanine having the analog part up to after the ADC. This would help in checking that the readout may be performed with the FPGA chosen and may help in having an early and simple readout for Barcelona. The GBT standard is not well adapted to the FPGA outputs. We have to design a system to make the FPGA and GBT compatible. This system should be tested on this first prototype. If the FPGA-GBT link is mono-polar, a simple tension divisor was imagined (Jacques) but this would increase the overall consumption (back of the envelop calculation ~ 1A/80 outputs). The problem is more acute if we want to have differential outputs (and use the high speed capabilities of the GBT). NB : the FPGA bit flip problem was linked to the I/O current.

5 Frédéric Machefert - Calorimeter Commissioning Meeting First Prototype (I) – Second Prototype We probably have to plan an interface with the analog mezzanine if this capability is confirmed : clock, SPECS, etc... ? Two reception areas for two delay chips. Only one would be connected at a time but we would have the possibility to solder either a Delay25 (CERN) or a LAL delay chip. This board would be used « on the table », powered with test bench power supplies. The difficulties experienced with the i 2 c and FPGAs lead to the test of the transactions with the FPGA on the prototype already. Despite of the usage of more links, a parallel bus seems simpler, safer, faster. The possibility to use the first prototype for irradiation tests was mentioned. But the conditions and purpose of those tests have to be defined precisely. The second Prototype would use : The components tested with the first one No component testing with this board The futur trigger implementation was supposed to be identical to the present one. This has to be confirmed but seemed clear to us. The question of integrating it to the second prototype was raised.