8:30am: start of activities in clean room: sticking foam pads to SX covers.

Slides:



Advertisements
Similar presentations
Latent Prints Forensic Science T. Trimpe
Advertisements

Starter Solenoid Contacts Replacement Sherco Automotive Supply
LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
How to install the Insert Alpha Q Tutorial Bert Hull Feb 8, 2005.
Mr. Jody Hannan Automotive Technology.  Topic- This presentation will give students knowledge of emergency car repair. We will explore how to change.
1 Second Safety Council Meeting Tucson, AZ April 10-11, 2014 Name of Meeting Location Date - Change in Slide Master The Dome Project Bill Gressler Telescope.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
TCC2-TDC2 working group Handling means for the TAX repairs JL GRENARD EN-HE 21th September 2011.
Topless. Temp sensor Remove the “Tank skin” Remove the top of the airbox cover by “unclipping” the 6 clips, and the 1 clip at the front of the airbox.
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
How to Install A Pop-n-Lock system on F-150 SVT Raptor By: Jacques DuBois.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
Chapter 11, Section 3. Interior Installation Installing a curtain rod Mounting Venetian blinds Mounting a window shade Hanging a picture.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
GST™ Leaching System Installation Manufactured under one or more of the following U.S. Patents; 7,374,670, 7,351,005, 7,309,434, 7,157,011, 6,969,464,
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
LBT Q Engineering and Software Review ENGG Engineering General.
Candle Soot & Filtration Soil. Where Will I See Filtration Soil? Most often on white or light colored carpet Most often on white or light colored carpet.
Microscopes are tools used to enlarge images of small objects so as they can be studied.
8am: start testing the corner cube mounts on DX cells.
By Juliet May Golden.  to get ready we were first split into groups. All the groups were given a recipe to follow and told to use fractions to make our.
SEVIRI Scan Mirror M. Lampton UCB SSL Oct SEVIRI Spinning Enhanced Visible IR Imager Main instrument aboard MSG-1 (Meteosat Second Generation) Zerodur.
LTI 011 Crushed Finger 13/May/2001 Crew were removing earth from bund wall area using a large metal skip. Position of skip had to be changed to help filling.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
Specialized Surgical Instruments & Techniques Endoscopy and Laparoscopy CTVT Objective: Properly identify specialized instruments and all of.
THIS IS MY HOUSE 4. IN MY LAUNDRY ROOM WASHING MACHINE.
E. Richards EE Chamber installation. Summary Position Of the EE chambers General view of EEL chambers EEL5 chamber Installation of other chambers ex.
September 2013 Updates: Art Attack term 3. I volunteered to help put up the new Lewers Learning Centre exhibition, so I spent a few very pleasant hours.
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
ICARUS Collaboration Meeting Dec A. Scaramelli.
Problem The teacher’s table is full of papers and stationary and it looks messy, it is very difficult to find stationery that we are looking for.
F/5 telescope work Secondary mirror polishing (SOML) Secondary mount support controls Active optics controls Flat field screen & lamps Telescope baffles.
tto see the reflection of your finger tip  small mirror  Clean washing up bowl  Water  Blue tack.
201 Mhz Cavity Installation. Removing Old 201 Cavity Came in through door with fork lift Will go out through labyrinth Requires new 3 ton Gantry crane.
Image from
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Faris Dabbour F.S.D, Inc Al-Hejrah, Al-Madinah, Saudi Arabia.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
The reading is 7.38 mm. The reading is 7.72 mm.
DECAM LN2 PUMP REMOVAL - CHECKLIST
Procedure for MCM rework on tray MID 070
Specialized Surgical Instruments & Techniques Endoscopy and Laparoscopy CTVT pages Objective: Properly identify specialized instruments and all.
SX1 manipulation VERSION 1 Version
VELO-installation meeting CERN, January 17, 2006
Crush while transporting and unloading steel frame structure
Status of straw production straw module assembling
SUPER - T6 (Short slide version)
TAS at IP1 Present situation and plans
Integration Plan for the
Specimen Preparation Bio 498/698.
Camera to Top End Assembly Integration Travis Lange Camera I&T M. E
Dial | How to fix HP Printer Error Code E8
Call to Fix Dell Printer Error Code
Why the Brake Caliper of your Car Sticking?
T400 Motor Replacement.
بسم الله الرحمن الرحيم الموضوع:الوضوء صفته وفرائضه وسننه
Lathe Flow Diagram Isolate power Isolate power Isolate power
Latent Prints Forensic Science T. Trimpe
VELO-meeting January 25, 2007 Sub-projects: SX & SX
Pembrey at war – Lesson 4.
Protective Grounding Three Phase Tangent
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Laboratory: A Typical Evaporation Process
Around the room Orders of operations.
Assembling the new bearing
BEST QUALITY & LOWEST COST PHOTO CANVAS PRINTS FROM THE BRAND THAT SAYS IT ALL; CANVASPRINTS.COM.NEXT DAY SHIPPING ON ALL ORDERS.
Goodman Acquisition Camera
MICROSCOPES.
Presentation transcript:

8:30am: start of activities in clean room: sticking foam pads to SX covers

9am: SX mount moved to high bay

9:20am: SX mount hanged to crane

9:30am: mount in dome

9:40am: crew ready for installation

9:45am: mount fixed to instrument gallery

Counterweight retracted and handling tool freed

9:50am: handling tool removed

10am: basket ready

Pulling back fold mirror

10:15am: removing covers from DX

10:20am: LUCI1 cal unit deployed -> ok. Taking measurements of clearence

23mm from AGW cover to dichroic cart

11:20am: DX covers reinstalled after putting foam

Taking 500mm clearence while in parking position (still to be measured on image)

Pork skin™ effects on unprepared foreign