Jim Hill Nuclear Management Company Nuclear Plant Operation under NRC Reactor Oversight Program.

Slides:



Advertisements
Similar presentations
1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009.
Advertisements

Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Why a safety culture matters (Attributes and Issues) Michael Corradini Nuclear Engr. & Engr. Physics University of Wisconsin, Madison WI.
The 2002 Davis Besse Event and Safety Culture Policy at the U.S. Nuclear Regulatory Commission Stephanie Morrow, Ph.D. Safety Culture Program Manager Office.
ANS RESPONSE TO FUKUSHIMA LESSONS LEARNED Presented to: NESCC November 29, 2012 Washington D.C. Donald J. Spellman, Chair ANS Standards Board American.
Nuclear Energy Institute Overview Susan Perkins-Grew Director, Emergency Preparedness March 30, 2010.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
US NRC Protective Action Recommendation Study National Radiological Emergency Preparedness Conference April 10, 2008 Las Vegas, NV Randy Sullivan, CHP.
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
Cumulative Impacts James Slider November 7, 2013.
Licensing of Nuclear Power Plants in Pakistan
1 10 CFR Part 26 Subpart I Managing Fatigue Kamishan Martin Human Factors Engineering June 23, 2010 HPRCT conference.
TRP Chapter Chapter 4.2 Waste minimisation.
Industry Nuclear Safety Culture* Process Thomas C. Houghton Director, Safety Focused Regulation Nuclear Energy Institute March 12, 2009 *Nuclear Safety.
Status of the U.S. Nuclear Regulatory Commission’s Initiatives on the Use of Cesium-137 Chloride Sources March 10, 2009 Regulatory Information Conference.
Rated # 1 “BEST PLACES TO WORK IN THE FEDERAL GOVERNMENT” Dale A. Powers US Nuclear Regulatory Commission.
Jim Hill Director, NMC Performance Assessment NEI SNPM Working Group ASQ Nuclear Power Production Committee Nuclear Power Fleet Operation Perspective.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
NEXT Lessons Learned from Integrated Regulatory Review Service (IRRS) 22 nd and 23 rd January 2014, Brussels Fernando Franco, Spanish Nuclear.
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Commissioner William C. Ostendorff FR/SSO/FS Workshop U.S.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
1 A Dialogue to Raise Awareness of Operating Nuclear Power Plant Issues RIC 2009 Regional Breakout Session A Dialogue to Raise Awareness of Operating Nuclear.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
1 Information Management Process for Electricity Distribution at NERSA.
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
Nuclear Power Plants Emission-Free Stability in a Volatile Market LSU Energy Conference October 21-22, 2004 Adrian Heymer, NEI, ,
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
1 American Society of Quality September 20, 2005 Presented by Linda Smith USNRC Region IV.
Groundwater Protection Initiative And Other Issues Of Interest George Oliver RETS/REMP Conference Charlotte, NC June 23, 2008.
Update MRL Matrix to address STE/SIE Validation Steve Watts AMRDEC Sep 15.
Sustained Reliability U.S. Nuclear Plant Average Capacity Factor 91.1% in % in % in % in % in % in %
1 RIC 2009 Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation George Wilson NRR/ADES/DE/EEEB March 11, 2009.
REGULATORY PERSPECTIVE ON USING OPERATIONAL EXPERIENCE Thomas E. Murley Former Director of Nuclear Reactor Regulation USNRC Conference on Improving Nuclear.
Evaluating Impacts of MSP Grants Hilary Rhodes, PhD Ellen Bobronnikov February 22, 2010 Common Issues and Recommendations.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
1 Emerging Issues: Materials and Mechanical Michele G. Evans, Session Chair 2009 RIC.
The Reactor Oversight Process: Development and Results Tom Houghton Nuclear Energy Institute September 20, 2005.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
ISM at the Savannah River Site
RIC 2009 Construction Inspection Program: Industry Perspectives Russ Bell Director, New Plant Licensing March 11, 2009.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
NRC Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2008 NRC Region I Joint Exercise Scheduling.
1 RIC 2009 NUCLEAR SECURITY Garmon West, Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Pilot Component Design Basis Inspection (CDBI) and Equipment Qualification (EQ) Program Inspection Feedback CONFIGURATION MANAGEMENT BENCHMARKING GROUP.
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
“ SISC ” Integrated System for NPP´s Supervision-Spanish Reactor Oversight Process Teresa Labarta, Olvido Guzmán, (CSN) Beatriz Gómez-Argüello (TECNATOM)
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
FY 2012 Budget Press Briefing February 14, NRC FY 2012 Budget NRC Mission: License and regulate the Nation’s civilian use of byproduct, source,
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
Prescriptive vs Performance-Based Regulatory Approaches
Sistema Integrado de Supervision de Centrales Nucleares
Operating Experience - New to Licensee EP
Branch Chief, Concerns Resolution Branch
Offerings for design safety from harmonization
NRC Cyber Security Regulatory Overview
Robert Kahler Branch Chief
Research and Test Reactor Safety: The Regulatory Perspective
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
Anna Bradford, Deputy Director Division of New Reactor Licensing
TRTR Briefing September 2013
Presentation transcript:

Jim Hill Nuclear Management Company Nuclear Plant Operation under NRC Reactor Oversight Program

Prairie Island Nuclear Generating Plant Safe – Reliable – Predictable – Leader

Adapted from: EED Recommendations for the Implementation of Selected Leading Indicators of Performance at Nuclear Power Production Plants, ASQ, 1999

Recognition of Need to Improve NRC performance determination previously implemented by Systematic Assessment of Licensee Performance (SALP) In late 1994 NRC conducted in-depth review of SALP process. Issues noted: –Lagging…consequences initiated late, sometimes after performance decline had already been turned –Inconsistent regulatory response –Determination sometimes driven by upper management bias with incomplete data Bottom Line: The process the NRC used to determine licensee performance needed to be more effective

Developed with input from plant owners/operators, facilitated by NEI Baseline Inspection –Finding Significance Determination Process (Green Red) Performance Measures –Performance thresholds established (Green Red) –Reported on a quarterly basis Measures “rolled up” with inspection results for periodic performance assessment Regulatory Response matrix –Additional and more intrusive Inspection –Continued degradation in performance leads to shut down Piloted at 8 nuclear plants prior to full industry use Revised Reactor Oversight Process

Positive Results Industry Performance in areas measured has improved Rigorous process for performance measures –Ensure current measures are adequate and provide value Predictable Regulator Action –Data Driven Accuracy of performance data has improved –Problems found early on in data reporting –NRC cannot accomplish performance-based oversight without accurate data…poor reporting is serious issue Periodic review and improvement to ROP is ongoing. –Moving to a new set of equipment performance measures –Adequacy of Security and facility protection from external threat continues to be a priority

Example – Hypothetical Nuclear Site NRC ROP Indicators – 2nd Quarter 2005