Presentation is loading. Please wait.

Presentation is loading. Please wait.

Operating Experience - New to Licensee EP

Similar presentations


Presentation on theme: "Operating Experience - New to Licensee EP"— Presentation transcript:

1 Operating Experience - New to Licensee EP
Steve Barr Manager - Emergency Preparedness PSEG Nuclear LLC (office) (cell)

2 Presenter’s Background (proof that he is new to licensee EP)
OE – New to Licensee EP Presenter’s Background (proof that he is new to licensee EP) : US Navy Nuclear Submarine Service : Boeing Helicopters Design Engineer : USNRC, Region I 5 years – Resident Inspector 10 years – Operations Examiner 12 years – Senior EP Inspector 2017–Present: Manager – EP, PSEG Nuclear (Salem-Hope Creek)

3 What am I new to? To What Am I New? My Company INPO
OE – New to Licensee EP What am I new to? To What Am I New? My Company INPO The NRC (as an inspectee, not as an inspector)

4 My Company My staff (I have a staff?!) My boss
OE – New to Licensee EP My Company My staff (I have a staff?!) My boss (yes, I have at least one boss!) What am I? SME ORO Liaison Reg Affairs part timer INPO POC Cheerleader

5 INPO How important is INPO? Continuous monitoring WANO Evaluations
OE – New to Licensee EP INPO How important is INPO? Continuous monitoring Get to know and converse with your DSPOC (continuously!) Be sensitive to your PML You may never see it, but know what’s in your IPSR WANO Evaluations EMPE Understand/use INPO tools WIIFM

6 OE – New to Licensee EP BREAK

7 The NRC Three levels: Resident Inspectors Regional EP Inspectors
OE – New to Licensee EP The NRC Three levels: Resident Inspectors Regional EP Inspectors Office of Nuclear Security and Incident Response (NSIR)

8 OE – New to Licensee EP The NRC Regulatory Framework:

9 The NRC Inspection Types: ROP Baseline Supplemental Reactive
OE – New to Licensee EP The NRC Inspection Types: ROP Baseline Resident - Quarterly Regional EP Inspection – Biennial Exercise Evaluation EP Program Supplemental Reactive Special Augmented Incident Investigation

10 The NRC Inspection Procedures OE – New to Licensee EP
Resident: , Drill Evaluation EP Inspector Exercise: , Exercise Evaluation , Exercise Evaluation – Hostile Action (HA) Event , Exercise Evaluation – Scenario Review Program: , Alert and Notification System Testing , ERO Staffing and Augmentation System , EAL and Emergency Plan Changes , Maintenance of Emergency Preparedness Supplemental: 95001, 95002, 95003 Reactive: 93812, 93800, NUREG 1303

11 OE – New to Licensee EP The NRC Reactor Oversight Process (ROP)

12 OE – New to Licensee EP The NRC Issue Screening (IMC 0612)

13 OE – New to Licensee EP The NRC ROP Action Matrix

14 The NRC OE – New to Licensee EP NRC Assessment
IMC0305, Operating Reactor Assessment Program IMC0308, Reactor Oversight Process Basis Document IMC0308, Att 3, App B, Technical Basis for EP SDP IMC0309, Reactive Inspection Decision Basis for Reactors IMC0609, Significance Determination Process IMC0609, Att 1, Significance and Enforcement Review Panel (SERP) Process IMC0609, App B, EP SDP IMC0612, Issue Screening IMC 2515, Light-Water Reactor Inspection Program

15 The NRC OE – New to Licensee EP Where do I find all this stuff?

16 OE – New to Licensee EP The NRC

17 OE – New to Licensee EP The NRC

18 OE – New to Licensee EP The NRC

19 OE – New to Licensee EP The NRC

20 The NRC How do I work with the NRC? Communication is key:
OE – New to Licensee EP The NRC How do I work with the NRC? Communication is key: Get to know your resident inspectors Stay in touch with the regional EP inspectors Stay in touch with industry peer groups

21 The NRC If an issue develops: Get your story straight
OE – New to Licensee EP The NRC If an issue develops: Get your story straight Make sure everyone else’s (Ops, RP, Reg Affairs, etc.) story agrees Benchmark (Operating experience, RUG, NEI, other peers, etc) Communicate as early and thouroghly as possible with the NRC Stay on message!

22 The NRC OE – New to Licensee EP Examples: Drill critique conversation
EAL conservative GE error Toxic containment atmosphere Mode 6 RCS water level operating band

23 The NRC OE – New to Licensee EP
Mode 6 RCS water level operating band example UNPLANNED: A parameter change or an event that is not the result of an intended evolution and requires corrective or mitigative actions.

24 OE – New to Licensee EP QUESTIONS?


Download ppt "Operating Experience - New to Licensee EP"

Similar presentations


Ads by Google