September 14, 2015 Transportation Board of Directors John M. Terry Assistant Director- Engineering SR-160 from SR-159 to Mountain Springs Phase 2 Final.

Slides:



Advertisements
Similar presentations
Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
US 52 Corridor Study Public Meeting November 15, 2010.
Public Scoping Meetings September 26, 2011 and September 29, 2011 Cajalco Road Widening and Safety Enhancement Project.
US 101 Corridor Mobility Master Plan Agenda Item B-1 San Luis Obispo Council of Governments Board Meeting August 6, 2014 – B-1.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
Environmental Assessment Public Meeting
Narcoossee Roadway Corridor Analysis Osceola County Board of County Commissioners Meeting December 4, 2006
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 7, 2014 MODERNIZATION PROJECTS EXPANSION PROJECTS PROPOSED HIGHWAY.
Presented by Public Works Department Traffic Engineering Division Board of County Commissioners September 9, 2014 Red Light Camera Update.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Miller Road Feasibility Study & Reconstruction Project Information and Kick-off Meeting Presented by: The Corradino Group of Michigan, Inc. ROWE INC. Genesee.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Washington State Transportation Improvement Board U RBAN F UNDING P ROGRAMS 2012.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Southern Bridge Project Brown County Executive
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
High Desert Corridor -New State Route 138/E-220 Agency coordination Meeting March 2011 “We’re here to get you there!”
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
ZOM A request for a minor amendment to the existing South Pointe PD (Planned Development) 110 acres West Newberry Road.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Metro Highway Program Presentation to CMAA Abdollah Ansari
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
HAMILTON COUNTY SR-317 (Bonny Oaks Drive) Widening From SR-17 to I-75 January 21, 2016 Robert Rodgers - C.E. Manager 2 TDOT Region 2 Project Development.
SUCCESSFUL APPLICATION FOR HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) GRANTS Presented By: Patrick V. DeChellis Deputy Director Los Angeles County Department.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Visit Our Website at: Click to edit Master title style.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Pioneer Road Relocation and Reconstruction Project
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Request #2 Request #1 Segment built by LCPS.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Citrus Park Drive Extension
Issaquah-Fall City Road
Lyle Parkway to SR 540 (Winter Lake Road)
Geometric Design: General Concept CE331 Transportation Engineering.
Southern Bridge Project Brown County Executive
Signal Operational Review Performance Monitor *
Parks Highway Reconstruction: Lucas Road to Big Lake Road
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
East Selmon Capacity Project PD&E Study Industry Forum
Presentation transcript:

September 14, 2015 Transportation Board of Directors John M. Terry Assistant Director- Engineering SR-160 from SR-159 to Mountain Springs Phase 2 Final Design Services

Project Background The Pahrump Valley has experienced substantial growth  SR 160 is the main artery servicing this area  Due to traffic growth, the road’s ability to operate safely at an acceptable level of service has and will continue to deteriorate This project is one of 8 projects along SR 160 NDOT has either completed or proposed from just east of I- 15 to Pahrump to address safety and capacity needs RTC’s Transportation Plan recommends expanding SR 160 to 4 lanes within the study area

Project Location SR160/SR159 Intersection Mountain Springs Community Las Vegas Valley End Project Red Rock Rec. Area To Pahrump Begin Project

Full Project Limits

Phase 2 Project Limits 11 22

Environmental Process Purpose and Need for the SR 160 project consists of:  Safety Enhancements Improved Driver Comfort Ingress – Egress within Mountain Springs Area SR-159 Intersection Improvements and Aesthetics Guardrail Median (Reduce Crossover Crashes) Possibility of Wild Animal Crossings Bike Lanes  Traffic Demand Increase Capacity Reduce Trip Times  Route Continuity  Regional Planning

Purpose & Need: Traffic 2010 Actual Count - 7,800 AADT (Average Annual Daily Traffic) – In 2008, the actual count was 8,100 AADT Forecast 2012 volumes – 8,195 AADT – 2012 volumes represent existing traffic Forecast 2032 volumes – 14,098 AADT – There is a 72% increase in traffic since 2012

Final Design Phase 2 (West Segment) Roadway Improvements Widen existing roadway to 2 lanes in each direction along SR-160 Improve ingress and egress in Mountain Springs by providing protected left‐turn pockets for the various driveways Lighted intersections for added safety and visibility Improve roadway geometry throughout project limits Eliminate unpermitted access points

West Segment Typical Section

Project Schedule MilestonesAnticipated Completion Date Notice to ProceedSeptember 14, 2015 Preliminary Design ActivitiesNovember 16, 2015 Develop Intermediate (60%) SubmittalMarch 25, 2016 Develop QA (90%) SubmittalMay 20, 2016 Develop PS&E SubmittalJuly 11, 2016 Document DateAugust 29, 2016 Advertising DateSeptember 14, 2016 Begin ConstructionFirst Quarter 2017

Procurement History RFP Issued - July 2011 RFP included option for Final Design CA Group selected - August 2011 Project Initiated - November 2011 Environmental Completed 2014 Phase 1 Construction Bid – August 2015

Board Action Recommendation to Board Approval of Amendment in Agenda Item

Questions? SR-160 from SR-159 to Mountain Springs Phase 2 Final Design S ervices