CMS Tracker Week, CERN, 24-28 Oct 2005 26 Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

CMS Week, CERN, Sep Sep 2003Tracker Week - Bonding WGSalvatore Costa - Catania Working Group Business.
CMS Week, CERN, June Jun 2004CMS Week - Bonding WGSalvatore Costa - Catania Documentation of the loop of the to-be-pull-tested bonds placed.
16 Jul 2002Tracker Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Precision Dispensing Purdue takes advantage of the gantry’s precision by fixing a 150 micron inner diameter dispensing tip to an EFD dispensing pressure.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Conductive glue tests. J.Wickens 12/7/04 Used small pieces of HV kapton cut from redundant (old) stock, glued to silicon test structures from Karlsruhe.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
T. Bowcock University of Liverpool
Bonding study of wrapping part of PA1/2
Ladder Assembly All tools and jigs produced Glue dispensing works
Status Report on Bonding at Catania
Rod adaptors for module tests Module positioning studies
US Module Production Status
Executive summary from Bonding WG Meeting 21 Oct 2003
Hamburg Bonding Report
Results from module testing
Unexpected Failures of Modules on Rods
Vienna Module Production
Module Failures on RODs
Module/Ladder Assembly
Module production in Italy
Module Production in Brussels
Module Production in Brussels
Hybrid & Module Testing Status
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Enrico Scarlini INFN and University of Florence CERN 25-Oct-2005
Hybrid & Module Testing Status
Università di Catania and INFN – Sezione di Catania
Università di Catania and INFN – Sezione di Catania
Presentation transcript:

CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Salvatore Costa Università di Catania and INFN – Sezione di Catania

26 Oct 2005CMS Tracker Week - Module Production2 Salvatore Costa - Catania Outline 1.Pull Test results 2.Open issues 3.Some peculiar failures

CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Global review of Module bonding quality that is, Module Pull Test results

26 Oct 2005CMS Tracker Week - Module Production4 Salvatore Costa - Catania # Modules Pull Tested

26 Oct 2005CMS Tracker Week - Module Production5 Salvatore Costa - Catania Mean pull forces

26 Oct 2005CMS Tracker Week - Module Production6 Salvatore Costa - Catania Mean pull forces

26 Oct 2005CMS Tracker Week - Module Production7 Salvatore Costa - Catania StDev/Mean of pull forces

26 Oct 2005CMS Tracker Week - Module Production8 Salvatore Costa - Catania StDev/Mean of pull forces

CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Open issues

CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania TEC Backplane HV Connection A Bonding and Gantry joined operation 1.Review of established practices in EU and US 2.Preparation for it in Italy

26 Oct 2005CMS Tracker Week - Module Production11 Salvatore Costa - Catania TEC Backplane HV Connection New DB Interface with new section –v. 6.0 –v. 6.0_US

26 Oct 2005CMS Tracker Week - Module Production12 Salvatore Costa - Catania HV Connection types Connection type inventory: 1.Conductive Glue dots between gold pad and Sensor (at Gantry) 2.Conductive Glue reinforcement over gold pad and Sensor (normally at Gantry, occasionally at Bonding) 3.Bonds without encapsulation (at Bonding) 4.Bonds with encapsulation (at Bonding) Current established practice: EU: US: [existing TOB modules retrofitted] Reason for reinforcement (EU) or encapsulation (US):  Bonds on back are considered at higher risk of being damaged when modules mounted on rods or petals because people’s attention is focused on front and the back may get neglected.

Slide 13Susanne KyreTracker week, October 2005 Material and Preparation Sylgard 186 Silicone Elastomer, 2 part kit, 10:1 mixing ratio (manufacturer: Dow-Corning) Mixing cups Mixing sticks Digital bench scale Small vacuum chamber or centrifuge for degassing

Slide 14Susanne KyreTracker week, October 2005 Dispensing Equipment Pneumatic glue dispenser with foot pedal and timed pulse option (manufacturer: EFD model: Ultra 1400) 3ccm syringe barrel and piston (EFD) Smooth-flow tapered tips, gage 20 (EFD)

Slide 15Susanne KyreTracker week, October 2005 Set up Equipment Base plate (UCSB design), to hold the module on a module carrier upside down Plastic trowel (UCSB design), to spread the encapsulant over the wirebonds and to keep the height of the encapsulant below the maximum height Stereo microscope (optional)

Slide 16Susanne KyreTracker week, October 2005 Procedure I Mix encapsulant, degas the mixture and fill syringe Set pneumatic dispenser to 15 psi and 1 second dispense time Set module in carrier upside down onto base plate Dispense a line of encapsulant across the width of the wirebonds

Slide 17Susanne KyreTracker week, October 2005 Procedure II Position the trowel with one leg on the sensor, one leg on the kapton Spread the encapsulant over all 15 wirebonds by sliding the trowel across the bonds Once the trowel is past the wirebonds, lift it up and clean it off with a dry tissue paper

Slide 18Susanne KyreTracker week, October 2005 Procedure III Check that all wirebonds are covered completely with the encapsulant (this can be done with or without a stereo microscope) If necessary apply more silicone and repeat the troweling procedure Cure for 24 hours with the backside of the module facing up to avoid beading up of the encapsulant

26 Oct 2005CMS Tracker Week - Module Production19 Salvatore Costa - Catania Established EU procedure M.Krammer: no bond encapsulation experience in EU TEC community: use conductive glue reinforcement All tests OK This procedure is now officially requested by TEC to Italy

26 Oct 2005CMS Tracker Week - Module Production20 Salvatore Costa - Catania …Except for R4S modules… …because:

26 Oct 2005CMS Tracker Week - Module Production21 Salvatore Costa - Catania

26 Oct 2005CMS Tracker Week - Module Production22 Salvatore Costa - Catania

26 Oct 2005CMS Tracker Week - Module Production23 Salvatore Costa - Catania

26 Oct 2005CMS Tracker Week - Module Production24 Salvatore Costa - Catania How is Back bonding going? Aachen: Vibration test of backplane HV bonds: with additional glue near bonds, but bonds bare, in one module some bonds broke, in another module no bonds broke. In modules with encapsulated bonds, none broke. Strasbourg: Bonded (in hole) 16 modules electrically OK Vienna: Bonded (in hole) 80 modules previously front- bonded, using special supports that hold module carrier all around: sensors not supported  No problems. Hamburg: Not started yet since the backplane jigs are not done before next week. For the last weeks have reinforced the glue connection on the backplane with conductive glue, for some modules where this had not been done before at the Gantries.

26 Oct 2005CMS Tracker Week - Module Production25 Salvatore Costa - Catania Recipe for TEC Mod prod in Italy At the end of the Bonding Meeting, I conveyed its outcome at the Gantry Meeting… –Bari has agreed to use conductive glue under HV pad when assembling modules –Bari has agreed to place conductive glue reinforcement over the “top” of the T-shaped pad –Bonding centers will bond “in the hole” without encapsulation

CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Some peculiar Module failures

26 Oct 2005CMS Tracker Week - Module Production27 Salvatore Costa - Catania Some recent peculiar Module failures IV failures: –Affect modules not randomly in time, but in concentrated clusters:  Recently: 5/53 in Aachen, 4/36 in Catania  Had also been seen at least in Catania and Padova in the past. Seen (in Catania) first TIB module where gold layer on HV pad on back is peeling away. –May drag away the bonds with it –Module will be declared faulty  Repair center Since Sep we see many TIB PA’s where bonds would stick with unusually high parameters, or would not stick at all, in one or more of these locations: –Pads 1-2, 27-30, , –Seen in: Bari, Catania, Padova. –Suspect bad PA metallization in those (symmetric!) spots