Building a Project Jon Jensen Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.

Slides:



Advertisements
Similar presentations
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Advertisements

Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
2014 Website Heather Rasmussen Communications Specialist W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Unscheduled Flow Administrative Subcommittee Report for ISAS Robin Chung January 28, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
SRWG Update to TSS February 2015, Meeting 168 WECC HQ
Unscheduled Flow Administrative Subcommittee Report for JGC Robin Chung February 5, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
The RCGP appraisal process a rough guide…. Appraisee: before the appraisal Fill in sections 1 to 12 Cut and paste PDP objectives from into area.
Western Planning Regions Interregional (IR) Coordination Activities
RPCG – CCTA Process Vijay Satyal & Colby Johnson Reliability Planning & System Adequacy April 28, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Next-day Study Task Force Steve Ashbaker Director Event Analysis & Situational Awareness Jason Ausmus NDSTF Chair W ESTERN E LECTRICITY C OORDINATING C.
Doug Tucker and Jon Jensen WECC Staff SRWG Workshop July 15-16, 2014 ColumbiaGrid.
Path Operator Task Force Report Joint Guidance Committee December 1, 2014.
CIIMS Update Stacen Tyskiewicz CIIMS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Variable Generation Subcommittee Update to PCC Ann Finley - VGS-PCC Liaison Metropolitan Water District of So. Cal October 7, 2014 Salt Lake City, Utah.
System Installation and Setup Doug Tucker Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
2014 Website Heather Rasmussen Communications Specialist W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Planning Coordinator Function Task Force Survey Results Doug Tucker Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Effect of Thermal Generation Replacement on System Frequency Response Enoch Davies, PE Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
BCCS Update Enoch Davies Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Creating Profiles Enoch Davies Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TOS Operating Committee Report Al Badella Technical Operations Subcommittee Chair July 14th, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Base Case Coordination System Report Philip Augustin – TSS Chair Nathan Powell – PCC Staff Liaison July 2015 Salt Lake City, UT W ESTERN E LECTRICITY C.
Study Program Comparison Protocol vs Proposal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Base Case Basics Jon Jensen Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Update: 4.9 Work Team on Committee Role, Scope and Structure Melanie Frye Vice President, Reliability Planning and Performance Analysis W ESTERN E LECTRICITY.
Reliability Assurance Initiative (RAI) 101 Ben Christensen Senior Compliance Risk Analyst, Cyber Security.
WECC Operating Committee Operations Training Subcommittee Report Bill Simmons, OTS Chair July 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Prosentient Systems DSpace © Prosentient Systems 2012 DSpace training Item submission.
WECC 401K Plan Annual Review Jim Robb, CEO and 401K Trustee W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Modeling Working Group Progress Report to TAS TEPPC Quarterly Meeting November 2-5, 2015 Tom Miller- MWG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PSS/E RAW File Format for appending to case
CSUN eCommons Submitting Learning Objects to CSUN eCommons: A Preliminary Guide February 7, 2008.
TAS Steering Group Meeting DWG Update July 16, 2015 Jamie Austin, PacifiCorp DWG - Chair.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
JSIS Report for PCC Donald Davies for Dmitry Kosterev, JSIS Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC Standards Update Steve Rueckert Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Model Validation using PSS®E
Unscheduled Flow Administrative Subcommittee Report for MIC Pete Heiman October 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Standards Update Merrill Brimhall Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
EDWG Outreach Plan Update Jim Gazewood and Harliv Singh January 15, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Document Categorization Policy Chris Albrecht, Legal Counsel W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Gen Maintenance w/ GridView DWG – Dec. 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
TEPPC 2015 Work Plan Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Unscheduled Flow Administrative Subcommittee Report Robin Chung October 8, 2014 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TAS & TEPPC Update CCTA Assumptions Vijay Satyal - RPCG Liaison, Sr. Policy Analyst & Colby Johnson - Associate Engineer, SAP W ESTERN E LECTRICITY.
Unscheduled Flow Administrative Subcommittee ISAS Report Pete Heiman April 20, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
EMIS-R OVERVIEW DATA COLLECTOR ROLES FLAT FILE EDITORS SUBMITTING PERIOD H DATA North Coast Council – Valley View – June 2013.
May 3, 2016 Presented by: Jamila Piracci, Vice President, OTC Derivatives Alessandra Riccardi, Director of Capital and Risk NFA Webinar: Margin Model Approval.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TEPPC Review Task Force Proposed Process W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
System Review Work Group Update to TSS John Gross, SRWG Chair Presented to TSS May 17, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Interchange Scheduling & Accounting Subcommittee (ISAS) Charles (Bud) Freeman, SCL W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
BCCS Alternatives Task Force Update to TSS Andrew Christensen, BATF Chair Presented to TSS Aug 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Nick Hatton Associate Staff Engineer
Base Case Build Process
ADS and WPR Seed Case Background
ADSTF Update: Resource Mapping and Proposed Solution
Doug Tucker and Jon Jensen WECC Staff
Base Case Build Process
ADSTF Update: Resource Mapping and Proposed Solution
ADS and WPR Seed Case Background
Jon Jensen Associate Staff Engineer
Jonathan Young SDWG Chair
Jon Jensen Associate Staff Engineer
System Review Work Group Update to TSS
Presentation transcript:

Building a Project Jon Jensen Associate Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Project Files What is a Project File Naming Convention – (Area Number)_(Company Name Acronym)_(Project Description) 40_BPA_PDCI Upgrade.prjx (PSS/E projects are *.prj) Project Types – Base Case Corrections (possible extra for different MVA/kV brackets) Base Case Correction Generation < 20 MVA Generation ≥ 20 MVA Transmission/Load < 100 kV Transmission/Load ≥ 100 kV 2 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Project Files (Cont.) Status Types – Base Case Corrections Powerflow Dynamics (Not available at this time) WECC (WECC Staff use only) – Generation and Transmission/Load Planned Proposed Exploratory 3 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Project File Creation Demonstrate Project file creation with cases described yesterday –.epc file upload in PSLF then export again – Master Base Case (14HS4 Operating Case) – Sample Project Case Describe Unassociated Criteria Flag – Used to block reporting of changes to things not associated with compare by criteria 4 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Project File Submission Login to the BCCS Import Project – Submission and Validation process Upload – Preliminary Submit – Pending approval Area Coordinator – Pending acceptance WECC Staff – Accepted WECC Staff – “Committed” Reference Documents – WECC BCCS Data Submitters Guide – Guidelines-notes-draft ver W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Project File 16lw1 Test Case What we are asking you to do: – Create the project for this test case based off of Area, Owner(s) or Zone(s). transition from 14hs4 case to 16lw1 – How will projects be submitted? Select appropriate area/owner(s)/zone(s) for data submission – SRP Example Zone 999 – Missing data 6 W ESTERN E LECTRICITY C OORDINATING C OUNCIL