Director’s Review of RunIIb Dzero Upgrade Installation 10.25.05 Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
7/11/01Steven Hays E/E Support Page 1 NuMI Beam line Power Supplies  The supplies in the line is detailed  Main Ring Style…………………..…1  PEI/Transrex.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Ageing … Eric Kajfasz (CPPMarseille) D0 Workshop, Beaune, June 17, 2003 DØSMT.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
FEE LVPS 1. INTRODUCTION This section describes the Low Voltage Power Supplies (LVPS) for the TPC FEEs and RDOs. Plans currently call for all of the old.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
Mapping for Silicon Run IIb L. Bagby, A. Nomerotski, E. von Toerne December 2002
Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 1 Workshop  Workshop is to “Move beyond the Technical Design Proposal”  Many.
D0 Workshop Bagby, Foglesong John Foglesong Run 2B SMT Low Voltage Power The present location of the SMT DC power supply units creates a problem.
Bagby, Foglesong General Silicon Meeting Run IIb LVPS Status  Design Goals  Key Issues  System Diagrams  Prototype – 1%  Plans.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
R. Lipton, Director’s Installation Review Oct 25, 2005 Layer 0 Preparations Layer 0 assembly was completed Aug 1 The overall quality of the detector is.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
25/9/2006Dmitri Tsybychev Stony Brook1 Vertex 2006 Perugia, Italy September 24-29, 2006 DØ Silicon Detector and Experience at Tevatron D. Tsybychev (Stony.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Twisted Pair Cable A.Nomerotski 12/12/02  Dense assembly (OD 5-7 mm) with u Twisted pairs : total 21; 44-pin mm dual row Omnetics connector s differential.
FGT Readout/DAQ Update, FGT electronics integration – reminder/update ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 kV.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Director’s Review Feb 3-4, Installation and Technical+Physics Commissioning of DØ RunIIb Silicon & Trigger Upgrades Schedule & Costs R.P. Smith.
A.Nomerotski,2/3/ Layer0 Status Andrei Nomerotski 2/3/2005 Outline  Introduction  Module Production  Assembly of Layer0  Electronics  System.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
12/17/01 Ron Sidwell 1 Run2b Datapath 17 Dec Update Bill Reay, Ron Sidwell, Noel Stanton, Russell Taylor, Kansas State University.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Director’s Review July 15, Installation and Technical Commissioning of D0 RunIIb L0 Silicon and Trigger Upgrades Schedule & Costs R.P. Smith for.
Ron Sidwell 1 L0 Datapath Ron Sidwell, Noel Stanton, Russ Taylor The Kansas State University.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
Electronics Infrastructure Linda Bagby December 8-9, 2011.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Noise & Grounding Andrei Nomerotski (U.Oxford) 17 July 2007.
VME64xP 6U Crates for the ANNIE Experiment Geoff Savage October /13/2015VME64X 6U Crate for ANNIE1.
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
LKr status R. Fantechi.
Calorimeter Mu2e Development electronics Front-end Review
Injectors BLM system: PS Ring installation at EYETS
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Mini-drawers, FE-ASIC , Integrator
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Overview of T1 detector T1 is composed by 2 arms
BESIII EMC electronics
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High Voltage u RTD-Carbon Fiber Temperature Monitoring u Readout  Prep Work Summary  Person-power, Schedule 1

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby System Electronics  The L0 Upgrade electronics consist of 4 systems. u Isolated Low Voltage Power Supply s Wiener PS-Filter-Fuse Panel-PS Interlock-CAN bus interface u High Voltage Power Supply s HV crate-Fanout Chassis (2 units) u RTD Temperature Monitoring s RTD-Flex-(32AWG-filter-26AWG)-Controller u Readout s Junction Card-Twisted pair cable-Adapter Card 2

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby Isolated Low Voltage System 3

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby Components installed  Installed and Tested u 2 Fuse Panels u East and West Side u Quadrant Specific Collision Hall-Cathedral Area  Installed and Tested u Wiener Power Supply u Safety Interlock 2 nd Floor Movable Counting House 4

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby LV Power Supply Filter Response 40V  pedestal  total noise  10  diff. noise  10 without ferritewith ferrite channel ADC counts  5 turns on ferrite core of power cable reduced noise to cts.  Prototype filter design ready to test.  Preliminary 200 gauss magnetic field tests show minimal effect on filter action. 5

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby Filter location  Install below fuse panel in cathedral area.  2 quadrants per card. 6

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby  Prep work remaining u Test filter at 100% test stand. u Enter operating parameters in EPICS database. u Test CAN bus interface via GUI in Control Room.  Work remaining in Collision Hall u Install filter in cathedral. u Cable Plant: s 12 twisted pair 10AWG cables –fuse panel  filter –filter  gauge change panels on horseshoe s 12 twisted pair 22AWG cables –gauge change panels  Adapter Card LV PS work remaining 7

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby High Voltage System  1st crate (L0) with 48 pods and power supply tested and installed in the 100% test stand at SiDet. u Pods modified to accommodate lower current.  2 nd 48 pod crate (SMT expansion) load tested and ready for installation.  Prep work: u Order HV cables within next couple of weeks.  Work remaining in Movable Counting House. u Install 2 HV crates-1 st from SiDet, 2 nd in house. u Install 2 Fanout chassis for L0. u Install 96 SHV cables from HV pods to Fanout chassis. u Remapping of Inner H-disk channels. u Distribute additional 48 channels in Fanout chassis.  Work remaining in Collision Hall: u None 8

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby RTD system  Monitors carbon fiber structure temperature.  Testing at SiDet has uncovered noise coupling into the readout from RTD flex circuits.  32 AWG cable shielding tied to isolated ground at AC removed noise conductor Hirose L0 Isolated GND 36 conductor x8 9

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby RTD System  Prep work u Test filter card-shielding scheme. s How much lead resistance can Controller tolerate? –Latest studies show the Controller can handle 3K Ohm per lead. Filter design for 60dB attenuation at 1kHz has 1.3K Ohm per lead. s Current design (RCRCR) has filter located on horseshoe. –Filter:Capacitors need a connection to detector ground in the vicinity of Adapter Card. 1 location per quadrant required. Location has been defined. –Shield:Requires a connection to LV isolated ground. By positioning filter card in close proximity to gauge change panel, connection is easy. Location has been defined. 10

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby DAQ Mapping  Positions for the temperature monitoring gauge change panels, LV gauge change panels, and Adapter Cards were determined based on the existing DAQ cable map.  Every effort has been made to minimize the number of cable moves required to integrate L0 into the current system.  Since the Outer and Inner H-disk low mass cables are combined on one old AC, it is necessary to move half of the Inner H-disk low mass cables (48). The open channels will be used for L0. 11

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby SE_1 Mapping IB Sequencer VRB 12

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby SouthEast S1: 10,11 S2: 23,24 S6: 76,77 AC LV AWG  Sector 1 Low Mass Moves Open Positions for Sector 1 10C2 to 02C1 10, 11, 12, 18 11C2 to 03C1 12C2 to 04C1 18C2 to 09C1 Sector 2 Low Mass MovesOpen Positions for Sector 2 23C2 to 15C1 23, 24, 25, 31 24C2 to 16C1 25C2 to 17C1 31C2 to 22C1 Sector 6 Low Mass MovesOpen Positions for Sector 6 76C2 to 05C1 76, 77, 78, 79 77C2 to 69C1 78C2 to 70C1 79C2 to 71C1 RTD Filter 13

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby Readout-Adapter Card  Work in Collision Hall u Remove 24 old ACs and standoffs. u Install 12 new ACs and mounts – 3 per quadrant. u Route 48 twisted pair cables from Adapter Card mounting ring (horseshoe) to Junction Card ring. u Connect Isolated LV power supply cable. Adapter Card Installed on Horseshoe 14 Digital jumper cable  Junction Card  Twisted Pair  Adapter Card

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby Readout-Junction Card Junction Card and Twisted pair cable 6 per ring — 12 per end Junction Card Mounting Ring 2 rings per end 15 Digital jumper cable  Junction Card  Twisted Pair  Adapter Card

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby Readout-Junction Card  Work in Collision Hall u Connect digital jumper cable from detector to Junction card. u Mount Junction card. u Test channel with laptop and calibration pulse. s Confirms HV and LV are correct, the hybrid can be downloaded, and a calibration pulse is read out through entire chain. u Complete first tier ring of 6 cards on each end. u Install 6 more cards on second tier mounting ring. u Test in same fashion. 16

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby Silicon Track Trigger  Layer Zero utilizes VRB slots previously used by H-disks.  H-disks were not used in the STT trigger.  To integrate Layer Zero into the trigger, SEQ fibers need to be moved from the associated VRB crates to the splitters mounted on the wall in the 2 nd floor movable counting house (MCH2).  Work in MCH2 u Reroute 2 fibers/VRB crate (24 total) to splitter. u Install 2 fibers/splitter (24 total) to VRB crates. 17

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby Prep Work Summary  LV system u Filter designed. Ready for testing.  HV system u Install RunIIa SMT expansion crate. u Order SHV cables for L0 and expansion crate.  RTD system u Filter designed. Quotes requested.  Readout u SEQ-splitter fiber plant. u Fibers/splitters in house. Need labels. 18

Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby Time and Personnel 19