1 Electronics Infrastructure Linda Bagby December 8-9, 2011

2 Introduction Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby2  LArTF AC Distribution  Cable Tray Plant  Copper and Fiber Plant  DZero Test Stand Plans  Plans

3 Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby3 LArTF AC Distribution  Generated talk for Procurement and Vendor agents describing our AC Distribution scheme.  Met with Mike Utes and Dwight and Dave Featherston to review talk and brainstorm ideas on the mechanics of realizing the design.  Dave H. generated detailed wiring diagrams that Dave F. will use to inspect contractors work.  Minutes of meeting and talk: DocDB# 1772.  We are ready for meeting with Procurement and Vendors for procuring double shielded transformers.

4 Single Line Drawing Detail Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby4

5 Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby5 Detail

6 Cable Tray Plant Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby6  Dave has started drawings showing where the cable trays will be located from the FT to the racks.  Pass these drawings to 3D modeler for integration.  Plan to have separate areas in tray for power, signal, fiber, timing, and control cables.  Need to use shielded cable or fiber as much as possible.  Reminder—Single line drawings required for all interconnects.  Use Chen’s DocDB# 1551 as guidance.  Need to choose plenum rated jackets to minimize damage in case of fire. (Per conversation with J. Priest, Fermi Fire Strategist—the guy that reviews equipment for fire hazards during the ORC review.)

7 Copper Cable Map Proposal 4 Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby7  Naming convention  1 starts upstream.  Regrouped TPC cables upstream to downstream.  Requested map between ASIC mother boards and FT connectors.

8 FT Cable Plant Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby8 Standard Feedthrough C1 C2 PS_C1PS_C2 C1  FT 3D graphic needs to match 2D.  FT2 has two bundles. o 8  TPCR1_C1 (right side of crate) o 16  TPCR1_C2 (left side of crate) FT2 Conn 1 starts here

9 FT2 Cu Mapping Graphic Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby9

10 Fiber Plant Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby10

11 Fiber break point needed? Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby11 Fiberdyne FB412B2G0000-96 wall mount Box w/ 4 FPA24LCM Adapter Panels: $453.24 Coupler loss: <3dB

12 Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby12 Fiberdyne Quote: Fermilab120111LB F9C22C2GCLL100F Fiberdyne, MM 50/125 standard grade, duplex, plenum,$45.17 2.0mm jacket, LC-LC, 100 Ft. F1C22C2SCLL100F Corning, MM 50/125 standard grade, duplex, plenum, 2.0mm$50.02 jacket, LC-LC, 100 Ft. F9C22C2GCLL007i Fiberdyne, MM 50/125 standard grade, duplex, plenum,$17.44 2.0mm jacket, LC-LC, 7 inches F1C22C2SCLL007i Corning, MM 50/125 standard grade, duplex, plenum, 2.0mm$20.72 jacket, LC-LC, 7 inches F9C22B4GCLL100F Fiberdyne, MM 62.5, duplex, plenum, 2.0mm jacket, LC-LC,$45.17 100 Ft. F1C22B4SCLL100F Corning, MM 62.5, duplex, plenum, 2.0mm jacket, LC-LC,$50.02 100 Ft. F9C22B4GCLL007i Fiberdyne, MM 62.5, duplex, plenum, 2.0mm jacket, LC-LC,$17.44 7 inches F1C22B4SCLL007i Corning MM 62.5, duplex, plenum, 2.0mm jacket, LC-LC,$20.72 7 inches FB412B2G0000-96 wall mount box loaded w/ (4) FPA24LCM adapter panels$453.24 Controller XMIT Trigger Jumpers Controller XMIT Trigger Network/Ranger Break Box

13 Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby13 Fiber Summary Fiber PlantTypeduplex# of boards# of racksLength (ft)TotalCostNotes: Cost from Fiberdyne Controller MM, 50  m 112 10012 Crates: 9 TPC + 1 PMT/Trig + 1 test stand +1 spare XMIT MM, 50  m 412 10048 Trigger MM, 50  m 13 1003 Crates: 1 PMT/Trig +1 test stand + 1 spare Spares MM, 50  m 1 51005 4 for enclosure + 1 for test stand Total 68 $ 2,601.20even 70 at $37.16 each/quote $ 3,161.90even 70 at $45.17 each/quote PLENUM duplex# of boards# of racksLength (in)Total Controller MM, 50  m 112 7 Onboard jumpers. XMIT MM, 50  m 412 748 Trigger MM, 50  m 13 73 Spares MM, 50  m 5 5 Total 68 $ 1,050.00even 70 at ~$17.44 each/quote PLENUM duplex# of boards# of racksLength (ft)Total DAQ1 TO PS MM, 62.5  m 3 11003 Detector network ACC to TRIG MM, 62.5  m 5 11005 Timing to Trig card DAQ3 to BIAS/PS MM,62.5  m 2 11002 Ranger for Config and Calibrate system Total 10 $ 371.6010 at $37.16 each/quote $ 451.7010 at $45.17 each/quote PLENUM

14 Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby14 DAB Test Stand Plans  Would like space next to the Hurricane Deck meeting room.  2 DAQ Racks  TPC Rack  PMT/Trigger Rack  FEE test stand  Couple of tables, chairs, various tools of the trade.  Need access to front and rear of racks.  Doorways to enclosed tech areas are a wee bit short for full size racks to fit through.  Use test stand to test fully populated crate.  Move crate into production rack in high bay.  Populate TPC rack with production VICOR.  Use as testing ground for: o VICOR slow controls readback. o Fully populated TPC crates. Once tested, move to production rack in high bay.

15 Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby15 PMT Test Stand  Requested unattended operation clearance for PMT studies.  Requires rack protection and interlocked AC distribution box.  A rack protection box and smoke detector are available-not networked.  2 AC distribution boxes ordered from SurgeX @$489.77 each  120V/ 20A  6 switched, 3 unswitched outlets  Surge protection  External interlock input

16 Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby16 Back-Ups

17 Rack placement Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby17 BEAM NORTH EAST WEST

18 Rack placement Dec. 8-9, 2011 MicroBooNE Collaboration Meeting L. Bagby18 EAST