PLANNING CYCLE An Overview. CONTENT Expected achievements Expected achievements Why IWRM Planning? Why IWRM Planning? Why a strategic approach? Why a.

Slides:



Advertisements
Similar presentations
Step 2: System Diagnosis. Learning Objectives Define system and SWOT analysis Define system and SWOT analysis Participate in strategic planning teams.
Advertisements

WCDR Thematic Panel Governance: Institutional and Policy Frameworks for Risk Reduction Annotated Outline UNDP – UNV – ProVention Consortium – UN-Habitat.
Key Messages National Riparian Lands Research & Development Program Assessing Community Capacity for Riparian Restoration.
Applying Conflict Sensitivity in Emergency Response: Current Practice and Ways Forward Conflict Sensitivity Consortium ODI Humanitarian Practice Network.
Water Integrity Capacity Building Programme: Outcomes and lessons learned from SADC regions SIWI WGF & CapNet UNDP 29 May A3.
Towards the Romania of PRINCIPLES OF PROGRAMMING The social and macroeconomic policy of Europe is the policy of Romania EU projects represent a.
INTERNATIONAL UNION FOR CONSERVATION OF NATURE. 2 Implemented in 12 countries of Africa, Asia, Latin America and the Middle East, through IUCN regional.
Presentation by Cambodian Participants Phuket, Thailand February 2012 Health Impact Assessment Royal Government of Cambodia.
Workshops for implementing the Strategic Plan for Biodiversity through the National Biodiversity Strategies and Action Plans Module 2 The Biodiversity.
Wrap up Decision makers meeting on good administration of land Windhoek Namibia, 7+8 December 2006.
First Evaluation of Good Governance for Medicines Programme Brief Summary of Findings.
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
AFRICAN UNION A FRAMEWORK FOR HARMONISED LAND POLICIES IN WEST AFRICA: an LPI – ECOWAS partnership Presentation to the World Bank Conference on Land Land.
Results-Based Management: Logical Framework Approach
BUSTRIP -Toolbox for Sustainable Urban Transport Plans Welcome on board! Anna Granberg, Project Coordinator,
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
Capacity Enhancement for Air Quality Management John E. Hay Senior Advisor UNEP ROAP & IETC.
The SEEAW in the context of Integrated Water Resource Management Roberto Lenton Chair, Technical Committee Global Water Partnership.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool Alessandra Alfieri UNSD.
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
IWRM PLAN PREPARED AND APPROVED. CONTENT Writing an IWRM plan The content of a plan Ensuring political and public participation Timeframe Who writes the.
BUILDING SUSTAINABILITY: PARTNERSHIPS AND FINANCE by S. Adrian Ross Senior Programme Officer PEMSEA.
 Strong reforms underway in Serbia, still numerous challenges ahead  Importance of setting priorities within national agenda  Joint efforts of all.
SWITCH Training Kit: Module 1 – Preparing for the Future Module 1: Preparing for the Future SWITCH Training Kit Module 1: Preparing for the Future Strategic.
Government IAM Ministerial Conference Participants Virtual Water Forum Water Voice Sessions interaction Ministerial Declaration Interaction Session Reports,
Climate Change Council November 2011 draft ACT Planning Strategy.
Initial thoughts on a Global Strategy for the Implementation of the SEEA Central Framework Ivo Havinga United Nations Statistics Division.
1 JUSTICE LAW AND ORDER SECTOR SWAP DEVELOPMENT & IMPLEMENTATION PROCESS.
SITUATION ANALYSIS. CONTENT Why do we do a situation analysis? What needs to be achieved? Steps in development of the Situation analysis Defining provisional.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
What is the NEPAD? It is a vision and strategic framework for Africa’s renewal. It has eight sectoral priorities, namely:  Infrastructure (ICTs, Energy,
Convention of the Protection and Use of Transboundary Watercourses and International Lakes DRAFT CODE OF CONDUCT ECOSYTEMS AND PES FOR WATER MANAGEMENT.
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
Environmental Management System Definitions
SESSION 3: FROM SETTING PRIORITIES TO PROGRAMMING FOR RESULTS.
Regional Strategy on Human Resources for Health (WHO Western Pacific Region) Presentation by Dr Ezekiel Nukuro Regional Adviser, Human Resources.
Information and transboundary cooperation – challenges and responses Francesca Bernardini United Nations Economic Commission for Europe.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
The ILO’s approach to Decent Work for Young People Giovanna Rossignotti Coordinator Youth Employment Programme Course (A300850) - Trade union training.
GOOD PRACTICES IN TECHNICAL COOPERATION FOR STATISTICS Paris 21 Meeting Paris, France, June 2000.
Riga’s AC Baseline Review Säästva Eesti Institute Heidi Tuhkanen, SEI-Tallinn Centre
Reduction of Mercury in Products Action Plans. 2 Action Plan  describes the activities to be carried out and the related implementation strategies for.
WATER MANAGEMENT STRATEGY AND OPTIONS IDENTIFIED.
Poised for greater impact The Cap-Net programme: achievements and prospects.
DEVELOPING THE WORK PLAN
Why is this on the agenda? Our baseline study was highly critiqued Our monitoring method was revised Our mid-term review highlights monitoring and evaluation.
Linking SEA and City Development Strategy (CDS) in Vietnam Maria Rosário Partidário, Michael Paddon, Markus Eggenberger, Minh Chau, and Nguyen Van Duyen.
Group Work IWRM Integrated River Basin Management.
Strategic Environmental Assessment in Poverty Reduction Strategies Session B1 IAIA International Experience and Perspectives in SEA 29 September :00-10:30.
Waisea Vosa Climate Change Unit Division of Political and Treaties Ministry of Foreign Affairs and International Cooperation.
National Sustainable Development Strategies in Pacific Island States - Workshop 4-5 May, 2006, New York presentation by Fiji.
Capacity Development Results Framework A strategic and results-oriented approach to learning for capacity development.
The EU Water Initiative and the EU ACP Facility New Instruments to promote sustainable development of water resources and affordable access Antonio Garcia-Fragio.
Forest Governance for REDD Brenda Brito – Imazon CGF Meeting - Aceh, Indonesia May, 2010.
1 Role of Stakeholder Engagement in Integrated Water Management (A GEF International Waters Perspective) by Dann Sklarew, GEF IW:LEARN Asia Regional Workshop.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
High-level forum on strategic planning for statistics: Bangkok, 6-8 June 2006 The National Strategy for the Development of Statistics (NSDS) approach Presentation.
10YFP Sustainable Buildings and Construction Programme (SBC)
Session 3: Advancing National Action and Capacity Development
Project Cycle Management
Enhancing employers’ involvement in Social Protection policy debates
Water and Agriculture: 30 year Visions for the Environment
Ecosystem Services and Biodiversity
Overview Rationale Context and Linkages Objectives Commitments
Moving Forward in PFM for Sustainable Economic Growth and Development
Overview of Bank Water Sector Activities
Integrated River Basin Management
Overview Rationale Context and Linkages Objectives Commitments
Roadmap for Health in All Policies in Sudan
Common strategy development process I
Presentation transcript:

PLANNING CYCLE An Overview

CONTENT Expected achievements Expected achievements Why IWRM Planning? Why IWRM Planning? Why a strategic approach? Why a strategic approach? The planning cycle The planning cycle Conclusions Conclusions

EXPECTED ACHIEVEMENTS Output of the process Output of the process IWRM plan, endorsed and implemented by government. IWRM plan, endorsed and implemented by government. In the process In the process Stakeholders and politicians will become more informed and committed about water issues Stakeholders and politicians will become more informed and committed about water issues

WHY IWRM PLANNING? Water problems are many and solutions are urgent Water problems are many and solutions are urgent Solutions need to consider social, economic and political forces Solutions need to consider social, economic and political forces Planning of IWRM approach to sustainable management and development may take several forms. Planning of IWRM approach to sustainable management and development may take several forms. Prioritize water problems towards IWRM Prioritize water problems towards IWRM Water as a key factor in poverty reduction and sustainable development Water as a key factor in poverty reduction and sustainable development

STRATEGIC APPROACH WHY? WHY? Strategic approach seeks solutions that attack the causes of the water problems rather than the symptoms. Strategic approach seeks solutions that attack the causes of the water problems rather than the symptoms. FEATURES FEATURES Preventive approach Preventive approach Incremental action Incremental action Consideration of conflict as a fact in planning Consideration of conflict as a fact in planning Based on dialogue, negotiation, participation mechanisms Based on dialogue, negotiation, participation mechanisms

STRATEGIC APPROACH FROMTOResponsibility State Only Shared by society PlanningSectoral Coordinated / Fully integrated Decision- making Centralized and controlled Sharing results Transparent negotiation and agreed actions

The Cycle for developing and adjusting an IWRM plan Work Plan & Stakeholder participation Vision/ Policy Situation Analysis Strategy choice IWRM Plan Implement Evaluation Initiation

THE PLANNING PROCESS Initiation Government committed Government committed Team formed Team formed Support assured Support assured Work Plan Vision/ Policy Situation Analysis Strategy choice IWRM Plan Implement Evaluation Initiation

THE PLANNING PROCESS Mobilization and work plan Management of the process – WORK PLAN Management of the process – WORK PLAN Political commitment Political commitment Effective stakeholder participation Effective stakeholder participation Awareness raising of IWRM principles Awareness raising of IWRM principles Work Plan Vision/ Policy Situation Analysis Strategy choice IWRM Plan Implement Evaluation Initiation

THE PLANNING PROCESS Vision / Policy Guiding principles and direction to action about WR Guiding principles and direction to action about WR Commitment to sustainable management of water resources Commitment to sustainable management of water resources Work Plan Vision/ Policy Situation Analysis Strategy choice IWRM Plan Implement Evaluation Initiation

THE PLANNING PROCESS Situation Analysis Current Problems Current Problems Water, land use Water, land use Strengths and weaknesses Strengths and weaknesses Institutions, laws Institutions, laws Identification of goals Identification of goals Identification of priorities Identification of priorities Work Plan Vision/ Policy Situation Analysis Strategy choice IWRM Plan Implement Evaluation Initiation

THE PLANNING PROCESS Strategy Choice Identification of possible solutions Identification of possible solutions Analysis of options Analysis of options Financial, environmental and political feasibility Financial, environmental and political feasibility Definition of selection criteria Definition of selection criteria Selection of strategy Selection of strategy Work Plan Vision/ Policy Situation Analysis Strategy choice IWRM Plan Implement Evaluation Initiation

THE PLANNING PROCESS IWRM plan Writing and revision of a draft Writing and revision of a draft Stakeholder and political approval Stakeholder and political approval Official approval Official approval Work Plan Vision/ Policy Situation Analysis Strategy choice IWRM Plan Implement Evaluation Initiation

THE PLANNING PROCESS Implementation Actions Actions Legal Legal Institutional Institutional Management Management Build capacity Build capacity Avoid failure due to Avoid failure due to Lack of political commitment Lack of political commitment Unrealistic planning Unrealistic planning Unacceptable plans Unacceptable plans Work Plan Vision/ Policy Situation Analysis Strategy choice IWRM Plan Implement Evaluation Initiation

THE PLANNING PROCESS Evaluation Progress assessment Progress assessment Prevent failures Prevent failures Solve problems Solve problems Plan reformulation Plan reformulation Periodic intervals Periodic intervals Incremental approach Incremental approach Work Plan Vision/ Policy Situation Analysis Strategy choice IWRM Plan Implement Evaluation Initiation

CONCLUSION IWRM Planning is a process driven by IWRM Planning is a process driven by Logic sequence Logic sequence Continuity Continuity Strategic approach Strategic approach Solutions to water problems need to consider the underlying social, economic and political forces Solutions to water problems need to consider the underlying social, economic and political forces

Relevant materials available  Integrated Water Resources Management Plans – training manual  Tutorial on Basic Principles of Integrated Water Resources Management  Why Gender Matters – tutorial on gender and water for water managers

Discussion:  How can national water supply & sanitation planning be integrated into the process of developing of IWRM plans?  Is WSS planning different from IWRM planning?