Neil Jackson University of Liverpool Hiroshima Symposium 14-17 June 2004 1 THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
16/5/2003SCT PAR, Georg Viehhauser1 Assembly of Modules to Cylinders Georg Viehhauser.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Opto Harness FDR 19/10/01 T. Weidberg1 Opto Harness FDR Scope and aims of review, system overview Available documentation Status of Project & Schedule.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
ATLAS SCT module performance: beam test results José E. García.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Shulamit Moed Vertex 2004, Como, September 20041page EndCap Module Production of the ATLAS semiconductor tracker (SCT) ATLAS SCT layout and specifications.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.

S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
The ATLAS SemiConductor Tracker Abstract The ATLAS SemiConductor Tracker (SCT) is presented. About silicon micro-strip sensors with a total active.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
October 05, 2005D. Ferrère, RD05 Florence1 From the ATLAS SCT endcap module production to the commisionning D. Ferrère, University of Geneva in behalf.
The ATLAS Silicon Microstrip Tracker
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Sils ATLAS Meeting 18-9 October 2003 Mechanics for the Barrel SCT.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Michał Dwużnik, for the SCT collaboration
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
The ATLAS Silicon Microstrip Tracker introduction system design sensors module design electronics hybrids construction integration Zdenek Dolezal, Charles.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
S Temple CLRC1 End-cap Mechanics FDR Power Tapes and Optical Fibres Steve Temple, RAL 1 November 2001.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
D. Greenfield CLRC1 End-cap Engineering Status Report Debbie Greenfield, RAL UK-V 30 October 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
The DAMPE STK G. Ambrosi INFN Perugia. The DAMPE Detector Mass: 1480 Kg Power: 600 W Data: 16 Gbyte/day Liftime: 5 years 2.
J.R. Carter SCT Barrel Module PAR - Overview 1 14th May 2003 ATLAS SCT BARREL MODULE PAR COMPONENTS AND PRODUCTION OVERVIEW Janet Carter, Cambridge TOPICS:
M. TYNDEL 1 LHCC Interactions May 2003 ATLAS SCT SCT Production Status ‘Snap-shot’ of the status of the SCT production (May 2003) 1. Barrel Modules 2.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
Endcap assembly update C Buttar, R French UK-V Cluster RAL 8 th Sept 2004.
MPI/ATLAS H.-G. Moser MPI, Munich Detector Status Delivered: 86% IV measured: 58% + Visual insp.: 39% fail : ~5%
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
ATLAS Internal ID Service Integration
T. Bowcock University of Liverpool
MODULE QUALIFICATION STATUS AT LIVERPOOL
End-cap Mechanics FDR Overview of the Project
July 2, 2007 ID CERN S. Terada KEK Module and Service Structure Designs -Super module conceptual design- - FEA thermal analyses- -Test of angled.
Mechanics: (Tim).
Simulated vertex precision
Rod adaptors for module tests Module positioning studies
アトラスシリコン半導体飛跡検出器:ATLAS Silicon-strip Tracking Detector
Presentation transcript:

Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS SCT COLLABORATION Overview of the ATLAS SCT Module production Engineering assembly and services Macro-assembly Current Status Summary

Neil Jackson University of Liverpool Hiroshima Symposium June Overview of the SCT The SCT forms part of the ATLAS Inner Detector. It is constructed using 4088 silicon micro-strip modules arranged as 4 barrels in the central region and 2 x 9 annular wheels in the forward region Inner Detector (ID)

Neil Jackson University of Liverpool Hiroshima Symposium June The modules are arranged to provide 4 space points per track -2.5<  < 2.5 Each module measures two coordinates –Detector pitch is 80  m and +-20 mrad stereo

Neil Jackson University of Liverpool Hiroshima Symposium June Modules consist of 4 (2) detectors mounted on a baseboard (barrel) or spine (forward) consisting of Thermal Pyrolytic Graphite + AlN and /or Be0 –Ensures good thermal performance The kapton hybrids are mounted on carbon-carbon substrates Modules have 1526 binary readout channels per module Spatial resolutions  r  = 16  m,  z (  R ) = 580  m Barrel ModuleForward Module

Neil Jackson University of Liverpool Hiroshima Symposium June Support structures All support structures, cylinders and discs, are produced using a sandwich material constructed with carbon fibre skins and a Korex core in industry Cu/Ni cooling pipes, precision mounts for modules, power tapes, opto-fibre harnesses + DCS and alignment components are added

Neil Jackson University of Liverpool Hiroshima Symposium June MODULE PRODUCTION Production of the 4088 modules occurs at several sites worldwide –Barrel modules in Japan, Scandinavia, UK and USA –Forward modules in Australia, Germany, Netherlands, Spain, Switzerland and the UK Modules must satisfy many criteria and tolerances – e.g. –A range of mechanical tolerances, some < 5  m –Module leakage current < 80  A at 350V –Noise per channel < 1500 ENC –Average noise occupancy at 1 fC threshold < 5 x –< 1% bad channels

Neil Jackson University of Liverpool Hiroshima Symposium June A forward module assembly station Vertical scale is deviation from nominal in units of tolerance. Horizontal scale is module number.

Neil Jackson University of Liverpool Hiroshima Symposium June Bonding and testing Module bondingModule in testing Module metrology

Neil Jackson University of Liverpool Hiroshima Symposium June Threshold ScansNoise Occupancy

Neil Jackson University of Liverpool Hiroshima Symposium June MODULE YIELDS BARREL MODULES ‘Good’ modules satisfy all specifications ‘Pass’ modules allow for a small % of modules that just fail a metrology specification –e.g. A deviation in the MIDYF parameter up to 8  m is allowed (the tolerance is 5  m) Current yield of Good + Pass modules is 87% –Pass modules comprise 7.5% of the total The main failure categories are –Abnormal leakage current (54%) –Damaged sensors (16%) –Gross mechanical error (metrology out of specification (14%)

Neil Jackson University of Liverpool Hiroshima Symposium June FORWARD MODULES ‘Good’ modules satisfy all specifications Current yield of Good modules is 84.3% ~50% of the ‘failures’ are just outside metrology specifications A ‘Pass’ category may be defined as for the barrel –Should improve Yield > 90%

Neil Jackson University of Liverpool Hiroshima Symposium June Lessons learned The progression from prototyping components to full production can introduce some problems and cause delays –e.g. Forward hybrid de-lamination problem Do not underestimate the time required to optimise techniques and commission equipment –e.g. Module assembly techniques Take care in defining specifications –Achieving the same quality in multiple sites is not straight forward Expect unexpected production problems and allow for the time required to solve them –Start with a proper contingency to allow for unexpected problems –Rigorous prototyping and QA will minimise unexpected problems

Neil Jackson University of Liverpool Hiroshima Symposium June Engineering assembly and services Preparation of barrels Mounting pads and brackets are added to the cylinder Grounding foils are added Services are added –Cu/Ni cooling pipes –low mass tapes, –Fibre harnesses –alignment components –DCS The ‘dog leg’ tapes have the optical ASICs mounted –These are mounted on the hybrids for forward modules

Neil Jackson University of Liverpool Hiroshima Symposium June Mounting services on barrels

Neil Jackson University of Liverpool Hiroshima Symposium June Preparation of discs Mounting pads and closeouts are glued onto the disc The pads are machined plane Patch panels and grounding foils are added Services are added –Low mass tapes –C-C mounting blocks soldered onto Cu/Ni pipes are mounted with high precision –Optical fibre harnesses, alignment components and DCS

Neil Jackson University of Liverpool Hiroshima Symposium June Metrology results for mounting pin positions for disc 9A The measurements are repeatable (to ± 5  m) after thermal cycling The disc is within specifications

Neil Jackson University of Liverpool Hiroshima Symposium June Lessons learned Developing new solutions is time consuming –e.g. bending and soldering Cu/Ni pipes and developing C-C cooling blocks Take care with design of kapton components –Design of tracks, attachment of connectors and stiffening where required The end-cap support cylinders when delivered were not up to specification and needed modifications involving delays

Neil Jackson University of Liverpool Hiroshima Symposium June Macro-assembly General infrastructure The macro-assembly is performed in clean conditions (typically class 10000) Evaporative cooling plants based on C 3 F 8 and C 4 F 10 are required to cool large numbers of modules Special tooling is required to mount modules –A robot for the barrel –A manual mounting jig for the end-cap Special tooling is required to mount discs into the support Testing must be done at –7C –Requires final power supplies, DCS and DAQ

Neil Jackson University of Liverpool Hiroshima Symposium June Mounting modules onto a barrel The barrel modules are mounted from one side and tilted at an angle of 10 o which allows an overlap between adjacent rows –The clearance between adjacent rows is 1 mm –The cooling block is coated with thermal grease –The mounting procedure requires the module to slide into position –A robot is programmed to perform this delicate manoeuvre The ‘dog-leg’ is connected to the module

Neil Jackson University of Liverpool Hiroshima Symposium June Which button do I press??

Neil Jackson University of Liverpool Hiroshima Symposium June Mounting modules onto discs Thermal grease is applied to the cooling blocks The module is extracted from its frame The frame is removed and the module is lined up with the mounting blocks –Using the x/y/  stages monitored with cameras The module is positioned and attached Lower modules are added first and then tested electronically and thermally at –7C. Upper modules next.

Neil Jackson University of Liverpool Hiroshima Symposium June Mounting discs into the support cylinder The disc is extracted from the test frame frame and attached to the tooling to insert it into the cylinder After insertion the services are added to the end-cap which is then moved to the cold room for testing. The cooling pipes, fibres, low mass tapes and DCS are connected and the disc is readout at –7C. It will be possible to readout two discs simultaneously to check for cross talk

Neil Jackson University of Liverpool Hiroshima Symposium June CURRENT STATUS MODULE PRODUCTION Barrel ModulesForward Modules

Neil Jackson University of Liverpool Hiroshima Symposium June Structures Barrels –All 4 cylinders are delivered –B3 and B6 are having services attached Discs – All Discs have been delivered to NIKHEF –Preparatory work is 59% complete –Disc 9C is ready for module mounting –Discs 8C, 7C and 9A are having services added –Disc 6C has arrived at RAL and 5C and 4C arrive soon End-cap support cylinders and ‘wings’ –One has been received with ‘wings’ but needed modification –The second is completed but awaiting modification

Neil Jackson University of Liverpool Hiroshima Symposium June Macro - assembly Barrels –Oxford is awaiting the arrival of barrel 3 to commence module mounting –Assembly of last barrel is due to be completed in Spring 2005 Discs – Module mounting on Disc 9C is now due to start End-cap support cylinders and ‘wings’ –Expect to mount Disc 9C in end-cap C in July –End-cap C to be ready to ship to CERN in mid-Summer 2005 –End-cap A to be ready to ship to CERN in late 2005

Neil Jackson University of Liverpool Hiroshima Symposium June SUMMARY The ATLAS SCT is in full production –Module production is well advanced (13% forward and ~75% barrel completed) –Most of the support structures have been delivered –Population with services is underway –The macro-assembly of completed barrels and discs is beginning Several problems have been solved –No show stoppers The schedule for completion is very tight but the collaboration is making every effort to achieve it.