SUMMER 2015 DEFERRED MAINTENANCE

Slides:



Advertisements
Similar presentations
TUSD Facilities Update November 8, Deferred Maintenance.
Advertisements

Tam Valley School Modernization - Phase 1 Summer 2011.
Planning an athletic facility project for Middle School Kids! Ms. Pauleys 8 th Grade Math – CTMS April 18, 2013.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS.
Summer DEPARTMENT ORGANIZATION Capital Improvement Program Capital Improvement Program Maintenance Custodial Environmental Management 2.3 millionsquare.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Cambrian School District 5-year Facilities Maintenance Plan Update 8/25/11.
Current Project Update October 25th 2012 Good Evening!!!
Construction Update September 2014 Madison Elementary School District.
Greenbush School Maintenance Calendar. JULY Week 1 ❏ Check clock systems ❏ Fertilize athletic fields ❏ Drag and roll baseball/softball fields ❏ Clean.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Decatur School Board Meeting August 19, Decatur Superintendent’s Report August 19, 2013.
Madison Elementary School District #38 Construction update Bond & Capital 6/5/12.
Facilities Update Site Improvements Encinitas Union School District September 5, 2006.
Bond Proposal May 12,  I.E.Clark Fine Arts Center – Problem – Consistent separation of walls and foundation over the years. Summary – The Fine.
MCPS MAINTENANCE AND CAPITAL IMPROVEMENTS 2015 – 2016 BUDGET.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Building Services Department Summer Building Services Capital Improvement Program Capital Improvement Program Maintenance Custodial Environmental.
Riverside Community Schools Overview of Summer Maintenance Projects.
Rio Del Oro Riverside Meadows Cobblestone. Plumas Lake Elementary School District ( Maintenance Department ) Here’s the life cycle I use for our Deferred.
2012 Planned Facilities Reconstruction Project. Planned Facilities Reconstruction Health & Life Safety Energy Conservation & Management Security Upgrades.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Bond Expenditure Report Per A.R.S. § (K) 7/1/13 - 6/30/14.
Sinking Fund Millage Renewal Election- May 7, 2013.
HENDERSON MIDDLE SCHOOL “The Grand Old Campus” CAMPUS FACILITY ISSUES.
DEDHAM PUBLIC SCHOOLS FY 2008 Approved FY 2009 Approved FY 2010 Approved Education Technology Program 275, Roof Replacement - High School750,
Capital Improvement Program for September 9, 2014.
Facilities Management and Design Chapter 7 HVAC Systems.
Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc.
Keyport Public Schools Facility Planning 12/02/15.
Learning, Health, and Safety Capital Project Alternates and Change Order
Facilities Projects FILLMORE UNIFIED SCHOOL DISTRICT OCTOBER 6, 2015.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Energy Conservation Building Upgrades Alma School District.
DEFERRED MAINTENANCE PROGRAM UPDATE REPORT Accomplishments and 2016 Planned Events October 1,
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Technology & Curriculum Building & Grounds January 8, 2015.
SINKING FUND PROPOSAL OCTOBER 3, SINKING FUND ADVISORY COMMITTEE PURPOSE: DEVELOP A LIST OF RECOMMENDED PROJECTS FOR THE 2012 SINKING.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
FY ’ 17 PTO BUDGET PRESENTATION April 2016 Managing Resources NORWELL PUBLIC SCHOOLS.
Oconee County Schools Five Year Facility Study April 27, 2011.
Facilities Focus Group
White Pigeon Community Schools
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
2015 School Bond Construction Program
Cornwall Central School District
Relevant Questions… How did we get to this point? Why do we need this?
Capital Improvements Presentation
Dr. Joseph Meloche Superintendent of Schools Mrs
Troy School District 2013 Bond Program – Series 1 Construction Update September 2016 Barton Malow | TMP.
Fort Cherry School District
The summer of 2018 and all the work that has taken place
2018 Bond Review and Proposal
Loudenslager Elementary School Pointing and Brick Repair.
Building & Property Committee
Troy School District Bond Program – Series 1 Construction Update
Troy School District Bond Program – Series Construction Update
Community Life at St. Giles
Facility Advisory Committee Meeting
Recent Bond Accomplishments
Troy School District 2013 Bond Program – Series 1 Construction Update June 2016 Barton Malow | TMP.
Troy School District Bond Program – Series 1 Construction Update
Presentation transcript:

SUMMER 2015 DEFERRED MAINTENANCE MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT

MOLALLA HIGH SCHOOL HVAC REPAIRS 2015 REPLACED BELTS ON A/C UNIT 3 REPAIRED GYM UNIT COMPRESSOR REPAIRED COOLING TOWER PUMP REPAIRED GIRLS LOCKER ROOM UNIT ECONOMIZER REPLACED VARIABLE SPEED DRIVE IN A/C UNIT 1 REPLACED BELTS ON A/C UNITS 1 AND 2 REPLACED SHAFT ON A/C UNIT 2 REPLACED SUPPLY MOTOR FOR RTU 8 REPLACED RETURN MOTOR, BEARINGS, AND SHAFT FOR RTU 2 REPLACED COMPRESSOR ON DRY SYSTEM IN CANOPY AREA REPAIRED PUMP ON RTU 8

HIGH SCHOOL NEW STEAM OVEN AND FILTER SYSTEM

HIGH SCHOOL OLD BOOSTER HEATER AND NEW BOOSTER HEATER

NEW LED FIXTURES FOR STAFF/ATHLETIC PARKING LOT AT HS

MOLALLA ELEMENTARY CARPET

HALLWAY AND LIBRARY

POD AND HALLWAY

MES PAVING UPPER PARKING LOT AND WALKWAYS

SEALED BUS LANE AT MES

MIDDLE SCHOOL EIGHTH GRADE WING EXTERIOR BLINDS FOR TEMP. CONTROL

MIDDLE SCHOOL BOYS LOCKER ROOM PAINTING

MIDDLE SCHOOL GIRLS LOCKER ROOM BEFORE

AND AFTER

NEW SIDEWALK AT MULINO-AROUND THE FRONT TO THE WEST ENTRANCE

MULINO DRAINAGE WORK PREP

MULINO DRAINAGE WORK AFTER

RURAL DELL HALLWAYS PAINTING

NEW SINKS AND FAUCETS AT RURAL DELL

RURAL DELL LOCKER ROOM REMODEL FOR SUPPORTED ED CLASSROOM

ROOFING AT RURAL DELL

RURAL DELL AND CLARKES NEW PRESSURE TANKS

CLARKES BOILER TRANSFORMER BEFORE AND AFTER REPLACEMENT

New phone system handsets

Main server at district office and intercom speaker

Football field homecoming 2015