11/31/08 South Feather Power Project (FERC Project No. 2088) PM&E Proposal January 31, 2008 Plumas National Forest, Oroville, CA.

Slides:



Advertisements
Similar presentations
Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Adobe Upper Reach 5 Conceptual Plan Issues December 9, 2003 Workshop.
Advertisements

Implementation and Monitoring Implementing the Building Blocks recommendations into prescribed hydrographs (Engineering) Implementing the Building Blocks.
Ecosystem Flows Hydrology and Connectivity Joe Trungale October 2, 2006.
Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010.
South Canal Hydro Project Electric Fish Barrier 01 March 2013 by Jim Heneghan Renewable Energy Engineer Delta-Montrose Electric Association.
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 8, 2009 RECLAMATION Managing Water in the West.
Engineering Hydrology (ECIV 4323)
1 Overview of South Yuba River Hydrology Bob Center Presented to FERC Academy on December 10, 2005.
Middle and Upper Williamson Sub-Basin Distribution Model Preliminary Results Jonathan La Marche KADR Hydrologist3/20/2000.
Jim Noel Service Coordination Hydrologist March 2, 2012
Klamath Watershed in Perspective A Review of Historical Hydrology of Major Features of the Klamath River Watershed and Evaluation of Hardy Iron Gate Flow.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Plenary Meeting January 6,
31 DECEMBER VARIABLE FLOOD CONTROL DRAFT FOR LIBBY RESERVOIR U.S. Army Corps of Engineers Northwestern Division, North Pacific Region.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
2011 Peak Flows and Daily Forecasts CBRFC 2011 Stakeholder Forum November 3, 2011.
How Much Do We Have Left? Coming to Terms With the Colorado River Water Availability Study Annual Colorado Water Workshop July 21, 2010 Ben Harding – AMEC.
CRFS Technical Committee Fall Meeting LC Operations Update November 20, 2014.
CBRFC April 2014 CUWCD Briefing/Meeting 1:30pm April 8, 2014 Ashley Nielson.
July Middle Fork Project Additional Information Potential Project Betterments to be evaluated during Relicensing July 2006.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
Yellowtail Dam & Bighorn Lake Operating Criteria Review Billings, MT September, 2010 RECLAMATION Managing Water in the West.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
44 th Annual Mid-Pacific Region 2011 Water Users Conference Water Supply Outlook Reno, Nevada January 26-28, 2011.
Middle Fork Project Project Description April 25, 2006.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
Placer County Water Agency Middle Fork American River Project Plenary Meeting February 8, 2010.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
Small hydro sites hydrology: Optimum capacity screening and estimation of fish habitat requirements. Charles D. D. Howard Senior Advisor Charles Howard.
EPA Cooling System Regulations Hall of States Briefing February 22, 2011.
Northern Integrated Supply Project NSPE-Colorado State Meeting February 2010.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
NE Drought Conditions CARC Update: April 2011 Mark Svoboda and Brian Fuchs National Drought Mitigation Center University of Nebraska-Lincoln.
Fish Assemblages of the Wabash River Mark Pyron. Wabash River Fishes 1.Large river 2.High diversity 3.History of human impact 4.Fish assemblages respond.
Status of Columbia River salmon and links to flow: What we do and do not know Presentation to Northwest Power Planning Council December 11, 2002
I RRIGATION P ARKS H YDROELECTRIC E LECTRIC D RAINAGE.
USBR Updates: Green River CRFS Meeting March 27, 2014.
HYDROELECTRIC POWER AND FERC. HYDRO 101A ”Water Runs Down Hill”
Yellowtail Dam & Bighorn Lake Water Supply & Operations Meeting Billings, Montana October 9, 2008 RECLAMATION Managing Water in the West.
Placer County Water Agency Middle Fork American River Project Plenary Meeting June 1, 2009 Handout #2.
YCWA Flood Management for Relicensing 9/24/14 9/24/20141.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Public Meeting May 15, 2007, 6-9 pm Millville Grange Palo Cedro, CA.
October 28, 2015 Yuba River Development Project Slide 1 Licensee Response to Relicensing Participant Tunnel Closure Proposal Yuba County Water Agency Yuba.
Klamath ADR Hydrology Report Modeling Results Historical Record and Instream Claims Model Accuracy Jonathan La Marche KADR Hydrologist3/11/2000.
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
USACE Managing a Drought  Overview  Timeline  Depletion Scenario Current Status– 17 Oct 07.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
Procedure to follow for proposed new Tier 1 sites Ian Bird CERN, 27 th March 2012.
Project Status South Delta Improvements Program Project Status November 2003.
CVPIA §3406(b)(2) Water Operations on the Sacramento River Sacramento River Conservation Area Forum Technical Advisory Committee February 7, 2012.
NOAA’s National Marine Fisheries Service Biological Opinion for Water Supply, Flood Control Operations & Channel Maintenance by the Army Corps, SCWA, and.
Water Supply Conditions February 28, 2014 Indian Valley & Sierra Valley.
Aug 11, 2015 Yuba River Development Project Slide 1 Licensee Response to Relicensing Participant Tunnel Closure Proposal Agency/NGO Yuba River Development.
Hydroelectric Power By: Danasha Harris, Haley King, Sarah Christopher, Peyton Mitchell, and Stephanie Williams.
Yellowtail Dam & Bighorn Lake Reservoir Operating Criteria Proposed Modifications Lovell, Wyoming July 29, 2008 RECLAMATION Managing Water in the West.
CRFS Technical Committee Fall Meeting LC Operations Update December 8, 2015.
FLO-2D Model Development Below Caballo Dam to Ft. Quitman Prepared by: U.S. Army Corps of Engineers Albuquerque District and Mussetter Engineering, Inc.
Senate Resources Committee & House Energy Committee Prepared by Alaska Energy Authority 1 /25/2011.
CRFS Technical Meeting LC Operations Update November 14, 2012.
Flow Meeting 2004 Biop Litigation September 29, 2005 Jim Litchfield Montana.
CRFS Technical Meeting LC Operations Update March 27, 2014.
Placer County Water Agency Middle Fork American River Project Plenary Meeting February 2, 2009 Handout #5.
Little Rapids Habitat Restoration St
Klamath ADR Hydrology Report
Middle Fork Project Entrainment Direct Sampling Approach (Contingency Study) September 8, 2008.
Packwood Lake Hydroelectric Project
Albeni Falls Dam Operations
Draft Agency Aquatic Workgroup Considerations Energy Northwest’s Proposed PME’s & Lake Creek Flows for Packwood Hydroelectric Facility Present: October.
”Identification of water bodies as potentially heavily modified”
Presentation transcript:

11/31/08 South Feather Power Project (FERC Project No. 2088) PM&E Proposal January 31, 2008 Plumas National Forest, Oroville, CA

21/31/08 Agenda Background FS/CDFG Proposal SFWPA’s Revised Proposal Questions

31/31/08 Background (1 of 2) Application Filed March 2007 –26 PM&E Measures including Flow, Each with Detailed Rationale $32 Million - Capital Costs $31 Million - Generation Loss –Dry WY - 1.4% –Below Normal WY - 1.7% –Above Normal WY - 1.8% –Wet WY - 1.5% Commitment to Continue Collaboration

41/31/08 Background (2 of 2) Agreed to Use Agencies’ Process – SFWPA Concerned Process Relied Heavily on Mimicking Unimpaired Hydrograph ~10 Meetings Through May 2007 At May Meeting –SFWPA Commented that Continuing Agencies’ Process Would Probably Result in Lost Generation of ~15% - Seemed High –SFWPA Asked Agencies to Identify Where They Felt Impacts Occurred and Why Next Meeting took Place on December 19, 2007 – FS/CDFG Proposal

51/31/08 FS/CDFG Proposal (1 of 2) SFWPA Understands FS and CDFG Are OK with SFWPA’s Proposed PM&E’s Except –Use FS/CDFG’s Proposed Minimum Streamflow Regime –Monitor Riparian Vegetation in South Fork and Forbestown Diversion Dam Reaches –Monitor FYLF in Forbestown Diversion and Lost Creek Dam Reaches, and Develop Ramping Rate Requirements –Monitor FYLF in Slate Creek Diversion Dam Reach –Install Fish Screen at Lost Creek Intake - Unless Study Can Demonstrate Entrainment Not Occurring

61/31/08 FS/CDFG Proposal (2 of 2) SFWPA Estimates FS/CDFG’s Proposal Increases Capital Cost by ~50% (~$16 Million) –$500,000 for Adaptive Management –$15,000,000 for Lost Creek Screen –$??? - Ramping Rates, Etc. SFWPA Estimates FS/CDFG’s Proposal Increases Generation Loss by ~400% Compared to Application –Dry WY – 15.6% –Below Normal WY – 8.6% –Above Normal WY – 5.4% –Wet WY – 2.7%

71/31/08 SFWPA’s Proposal Goals –Keep Little Grass Valley Reservoir near Recent Historic Elevations –Balance Enhanced Trout Habitat and Costs, Especially in Dry and Below Normal Water Years –Provide Reasonable Trout Habitat in Lost Creek –Provide Slate Creek Minimum Flows Using Existing Outlet Capacity

81/31/08 Little Grass Valley Reservoir Reservoir Does Not Completely Fill in 14 of 28 Years, Mostly in Dry and Below Normal WYs –Current License, FS/CDFG Proposal, SFWPA Proposal By July 1 (In Years Where Reservoir Does Not Fill): –FS/CDFG’s Proposal - Reduction in Historic Elevation of feet (Typically ~6 ft) –SFWPA’s Proposal – Reduction in Historic Elevation of feet (Typically <2 ft)

91/31/08 Balancing Trout Habitat and Costs

101/31/08 Balancing Trout Habitat and Costs

111/31/08 Balancing Trout Habitat and Costs

121/31/08 Balancing Trout Habitat and Costs

131/31/08 Balancing Trout Habitat and Costs

141/31/08 Balancing Trout Habitat and Costs

151/31/08 Lost Creek Trout Habitat % of Maximum Static WUA FS/CDFG SFWPA

161/31/08 Lost Creek Trout Habitat

171/31/08 Slate Creek Outlet FS/CDFG Proposal Calls for 49 cfs Release in March of Each WY Would Occur Mostly in Dry and Below Normal WYs –Dam Frequently Spills in March of Above Normal and Wet WYs –Significant Accretion Occurs in March Existing Slate Creek Diversion Dam Outlet Physically Limited to 40 cfs SFWPA Proposes 40 cfs Minimum Flow Release in March - and Same Releases as FS/CDFG’s Proposal in All Other Months for All WYs Equates to Decrease in Static Weighted Usable Area from 80% to 74% of Maximum WUA in March

181/31/08 SFWPA’s Proposal SFFR - Little Grass Valley Dam FS/CDFG SFWPA

191/31/08 SFWPA’s Proposal SFFR - South Fork Diversion Dam FS/CDFG SFWPA

201/31/08 SFWPA’s Proposal Slate Creek - Slate Creek Diversion Dam FS/CDFG SFWPA

211/31/08 SFWPA’s Proposal Lost Creek - Lost Creek Dam FS/CDFG SFWPA

221/31/08 SFWPA’s Proposal SFFR - Forbestown Diversion Dam FS/CDFG SFWPA

231/31/08 Clarification of Non-Flow Items Lost Creek Diversion Fish Screen FYLF and Riparian Monitoring

241/31/08 Summary SFWPA Wants to Reach Consensus Proposal: –Responsive to FS/CDFG’s Proposal –Keeps Little Grass Valley Reservoir near Recent Historic Elevations –Balances Enhanced Trout Habitat and Costs, Especially in Dry and Below Normal Water Years –Provides Reasonable Trout Habitat in Lost Creek –Provides Slate Creek Minimum Flows Using Existing Outlet Capacity FYLF and Riparian Monitoring

251/31/08 Comparison of Generation Losses SFWPA’s Final License Application FS/CDFG’s Proposal SFWPA’s Proposal Wet-1.2%-2.7%-2.0% Above Normal -1.7%-5.4%-3.4% Below Normal -2.5%-8.6%-5.0% Dry-1.8%-15.6%-10.6%

261/31/08 Comparison of Capital Costs ? Need to Talk

271/31/08 Questions?