Christos Rekkas ADS Programme Manager EUROCONTROL

Slides:



Advertisements
Similar presentations
1 The PATLIB (Patent Library) Network in Europe Heidrun Krestel European Affairs, Member States 19 May 2010.
Advertisements

1 The EPO Co-operation Programme to reorient patent information centres Heidrun Krestel European Affairs, Member States 4 October 2010.
ICAO TEM/NOSS Symposium November 2005
The CASCADE Programme From Concept to Operations ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
The framework of the Convention on Long-range Transboundary Air Pollution Henning Wuester Secretariat of the United Nations Economic Commission for Europe.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
Swedish National Board of Trade - Christer Arvíus MARS Group meeting Bratislava, Slovak Republic 10 – 13 October 2007 Christer Arvíus Chairman UNECE WP.6.
Applications from packages I to III
The Convention on Long-range Transboundary Air Pollution and EMEP (The Cooperative Programme for Monitoring and Evaluation of the Long-range Transmission.
EDEP UG Bretigny, June 9 th 2008 eDEP Users Group Meeting Radar Skills Trainer Road map Vladimir Bubalo, IANS TDH.
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
EDEP as Tool for ADS-B Validation eDEP User Group, 9 June 2008 Leo van der Hoorn, CASCADE Programme.
1 Owner-Occupied Housing Summary of the pilot Item 5 of the Agenda D4 – Price Statistics HICP Working Group Luxembourg October 2007.
Dr. Barry Kirwan, EUROCONTROL Safety Culture Seminar introduction.
The CASCADE Programme Validation Status and Plans ASAS-TN2 Workshop 3-5 April 2006 Christos Rekkas CASCADE Deputy Programme Manager European Organisation.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Towards Implementation of ASA/GSA Package I” Pieter van der.
ASAS-TN Workshop Glasgow 11 September 2006 Alex Wandels CASCADE Programme Manager EUROCONTROL European Organisation for the Safety of Air Navigation CASCADE.
Nigel Makins EUROCONTROL
1 Presentation to ASAS TN2 17 th September 2007 Mel Rees Head of Surveillance EUROCONTROL EUROCONTROL SURVEILLANCE STRATEGY.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
The CASCADE Programme Validation Results ASAS TN2 27 September 2005 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL European Organisation.
24/11/2015 The templates for National Renewable Energy Action Plans EUFORES – 9 th Interparliamentary meeting Brussels, 18 November 2009 EUROPEAN COMMISSION.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
Visit of Mr Griffiths, DG CAA UK - 20 December 2007 EUROCONTROL.
Introduction to the training dataset Alexander Mack.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
CIS-Workshop on „WFD and Hydropower“ June 2007 Berlin, Germany - First Workshop under Phase II ( ) of the EU activity „Water Framework Directive.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
EDIT validation tool item 8 of the agenda Structural Business Statistics Working Group 14 April 2015, Luxembourg Arlind Dobërdolani.
Progress under the Convention on Long-range Transboundary Air Pollution Twenty-ninth meeting of the Task Force on Integrated Assessment Modelling
Eurocontrol ASAS / ADS-B Activities Getting Closer to Implementation Mr. Bo Redeborn Director ATM Strategies.
Comparative analysis of the National Rural Networks (NRNs) in the EU Member States Martin Law Contact Point of the European Network for Rural Development.
CP4: Scope of Protection B&W Marks “Harmonise the different interpretations of the scope of protection of trade marks exclusively in black, white and/or.
Module V Creating awareness on validation of the acquired competences
Unique in Europe. Across Europe.
15-16 November 2017 Valenciennes, Cité des Congrès
Eurojust cases involving crimes against children
Urban Audit 3 State of play
Working Party on Regional Statistics 1-2 October 2012
Natura 2000 – SCI Union Lists
State of legal transposition (1)
Report on WISE Art.8 and GIS issues
Habides update (May 2011).
Capabilities of TIS-B for Supporting ASAS
Education and Training Statistics Working Group
Towards ASAS Implementation The Role of the CASCADE Programme
Agenda Item 2.1 SES 2014: follow-up
LAMAS October 2016 Agenda Item 2.1
Representative sampling questionnaire
Marine Strategy Framework Directive: Transposition and Implementation
LAMAS Working Group 29 June-1 July 2016
State of progress with transition to new Standard Data Form
Reporting – Art 17 of HD and Art 12 of BD
Item 8.1 Implementation of the 2016 Adult Education Survey
Programme adoptions Cohesion Policy:
Item 7.1 – Overview of 2012 UOE data collection
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
EuroGroups register First results of measures on advancement
State of Play RBMPs and WISE reporting (9/07/10)
FISIM State of play Agenda Item 3.
European Statistical Training Programme (ESTP)
STEM Education Policies and Practices in Europe
The Convention on Long-range Transboundary Air Pollution
LAMAS Working Group June 2015
LAMAS Working Group June 2018
EDAMIS3: CURRENT STATUS
DG Environment, Unit C.2 Marine Environment and Water Industry
Presentation transcript:

Christos Rekkas ADS Programme Manager EUROCONTROL Surveillance Data Processing, Networks and Validation Tools for ADS-B applications Christos Rekkas ADS Programme Manager EUROCONTROL ASAS TN 19-21/04/04

ADS Programme Planning (Ground Surveillance applications) (Airborne Surveillance applications) ASAS TN 19-21/04/04

Key deliverables Internationally harmonised Requirements Key for interoperability and efficiency Safety Case (including separation min considerations) Business Case Consultation with manufacturers, ANSPs and Users Infrastructure Specs or prototypes Ground infrastructure Surveillance Data Processing and Distribution (ARTAS) Surveillance Network equipment (RMCDE) Airborne Surveillance Data Fusion (co-operation with AIRBUS, Boeing & avionics industry) Validation tools and Platforms Surveillance and Communication Simulation and Analysis tools ADS-B Validation Testbed (AVT) Validation activities at EEC or at various ECAC sites, proving the benefits CRISTAL Implementation planning ASAS TN 19-21/04/04

Development of ARTAS for Mode S and ADS-B ARTAS V7 is capable of processing Surveillance data from classical radars, Mode S and ADS-B Development phases ARTAS V7 Specifications (completed) ARTAS V7 Development (ongoing) V7.0 development (July 2003 -> July 2004) V7.1 development (July 2004 -> May 2005) Both Unix and Linux versions May 2003 July 2003 Dec 2003 July 2004 Oct 2004 May 2005 Phase 1 Phase 2 Phase 3 V7.0L (Beta) Contract Signature ARTAS V7 Specifications ARTAS V7.0 Beta ARTAS V7.0U (FAT) ARTAS V7.1U (FAT) V7.1L (FAT) ASAS TN 19-21/04/04

Surveillance Network Equipment Upgrade of Surveillance network equipment (RMCDEs) to support ADS-B functionality Operational purpose Surveillance Front-End Processor for SDPD systems Access Node for Surveillance Networks Benefits Flexibility of surveillance data formats Phased implementation of the ASTERIX format Optimal use of communications resources (networks) Existing systems 39 Operational, 29 test, 40 sites Prototype development Specs by June 2004 Development completed by end 2004 ASAS TN 19-21/04/04

TIS-B Server Objectives Support validation of TIS-B services for Package 1 as part of the ADS-B/TIS-B Validation Testbed (AVT) Provide a prototype TIS-B Server offering the following capabilities uplink tracks and not radar plots support both gap filler and full picture uplink services handle multiple TIS-B link technologies handle multiple TIS-B Ground Stations and Service Volumes Each SV is associated with a separate quality of service be compatible with the services offered by ARTAS support various ASTERIX standards Acquire source code and documentation enabling modifications and experimentation distributable to ADS Programme Stakeholders Development to be completed in September 2004 cat 22 = TIS-B service status cat 23 = TIS-B transmitter status cat 62 = TIS-B track cat 63 = Surveillance sensor status cat 65 = SDPS Heartbeat nessage ASAS TN 19-21/04/04

Surveillance Analysis Tools (SASS-C) Development work in the period 2003-2005 Multi-source Acquisition Suite Surveillance Data MAS TRES Trajectory Reconstruction & Evaluation suite Simulation Suite Data Sensors Description SMART SCAS Surveillance Coverage Analysis Suite Screening Files ASAS TN 19-21/04/04

ADS-B Validation Testbed (AVT) AVT is a validation platform for Package I surveillance applications and infrastructure provides the complete ATC system chain from pilot to controller allows controller and pilot participation provides a realistic and controllable surveillance environment to test Package I applications. handling both live and simulated aircraft including link error performance simulation serves also as reference platform for surveillance components and tools supporting standard surveillance interfaces, particularly ASTERIX tool for technical investigations on specific surveillance issues for example tracking performance AVT is funded by the EUROCONTROL ADS Programme but is also available for use by third parties. Installations exist at Brétigny and Arlanda, and more are foreseen for 2004 ASAS TN 19-21/04/04

AVT Phased Implementation Phase I :Baseline air to ground functionality Separate ADS-B and SSR tracking Platform operational: November 2002 Demonstrated in Malmo, Sweden (Jan 03) Phase II: Support for En-route and TMA ground surveillance applications Full ADS-B and SSR data fusion Platform operational: October 2003 Demonstrated in Arlanda, Sweden (Nov 03) Phase III : AVT for ATSAW and multilateration Support for Airborne Situational Awareness Use of wide area multilateration, TIS-B, and ADS-C Platform operational: End 2004 Phase IV : AVT for full set of Package I applications Support for Spacing application and airport surface operations Use of airborne SDPD and airport tracker Platform operational: End 2005 ASAS TN 19-21/04/04

AVT Overview Allows reliable and efficient validation MCS/eCockpit EAT/EDEP A-SDPD Allows reliable and efficient validation eCockpit ASAS TN 19-21/04/04

CRISTAL – Co-opeRative ValidatIon of Surveillance Techniques and AppLications of Package I Validation exercises in partnership with individual ANSPs, industry and other stakeholders, in various ECAC sites “Crystallisation effect” Targeting local situations of interest – Driven by the stakeholder operational needs Wide range of activities (operational, technical, safety, cost-benefit, separation mimima etc.), as appropriate Evolution to pre-operational level depends on the stakeholder plans and the trial progress Cover both Stream 1 (Ground Surveillance applications) and also Stream 2 (Airborne Surveillance applications) ASAS TN 19-21/04/04

CRISTAL sites ASAS TN 19-21/04/04 Trial/Study sites & areas FI FI NO NO SE SE CRISTAL countries RU RU EE EE Currently under discussion LV LV DK DK LT LT KZ KZ IE IE Discussions planned BY BY GB GB NL NL PL PL BE BE DE DE UA UA CZ CZ LU LU SK SK MD MD AT AT FR FR CH CH HU HU RO RO GE GE SI SI AZ AZ CR HR AM AM BA BA YU YU BG IR IR IT IT PT PT ES MK MK ES AL AL TR TR GR GR SY SY IQ IQ CY MA MA DZ DZ TN TN MT ASAS TN 19-21/04/04

Conclusions The EUROCONTROL ADS Programme provides important deliverables related with the Package I Surveillance applications and enablers The Programme deliverables include Specifications and prototyping of important system infrastructure components and validation tools Infrastructure components Ground Infrastructure Surveillance Data Processing and Distribution (ARTAS Version 7) Surveillance Network Nodes (RMCDE) Airborne functionality Validation tools Surveillance and Communication Simulation and Analysis tools ADS-B Validation Testbed (AVT) These systems are the necessary basis for the validation trials, leading towards implementation in a cost efficient way CRISTAL projects in partnership with local ANSPs, industry and other stakeholders ASAS TN 19-21/04/04