Design & Safety Review Work Group meeting 10 March 2005 Progress update Wing Lau, Oxford.

Slides:



Advertisements
Similar presentations
January 14, 2004 TJR - - UPDATED 1/25/04 1 MICE Beamline Analysis Using g4beamline Including Jan 25 Updates for Kevin’s JAN04 Beamline Design Tom Roberts.
Advertisements

Managing Your Tinnitus: Changing Your Thoughts and Feelings (Session 2 of 3) Version date: June 5, 2012.
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Project Management Lecture Developing the Project Plan.
I.O.L.P DMo’s guide to success. Target Setting Include the sentence; “To develop the skills in which will enable me to achieve my academic potential”,
TJR Feb 10, 2005MICE Beamline Analysis -- TRD SEPT041 MICE Beamline Analysis – TRD SEPT04 Tom Roberts Muons, Inc. February 10, 2005.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
Action Who Progress made status Implement central repository for drawings -- need detector information to add to official drawing WL Progress on-going.
AFC engineering group meeting on the 26 th of Jan 2004 MICE Absorber Focus Coil work schedule for the next 6 months By Wing Lau, Oxford.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.
Paul drumm; 3rd December 2004; AFC MM 1 Why? Goal: Ultimate (CCLRC defined) Safety & Design Review –How do we get there? We need a Process –What is needed?
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Phone meeting on PID Detectors 25 Jan 2006 Implementation of PID detectors in the general MICE layout By Wing Lau, Oxford.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
MICE Collaboration meeting RAL 21 – 24 Oct 2005 Summary of Design & Safety review progress By Wing Lau – Oxford University.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Paul Drumm 25 March 2004 MICE at Project Report CERN Collaboration Meeting 29 March 2004.
1 MICE Hall Layout MICE Collaboration Meeting, LBNL, February 12, 2005 Paul Drumm for Yury & the RAL team.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
May 12, 2004 TJR1 Effects of Downstream Iron Shield Position on MICE Good- Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
May 12, 2004 TJR1 Effects of Upstream ParticleID Counters on MICE Good-Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
Unit 2: Managing the development of self and others Life Science and Chemical Science Professionals Higher Apprenticeships Unit 2 Managing the development.
MICE VIDEO Conference 17 th December 2003 Report on AFCSWG Safety Review -- Future Plan By Wing Lau -- Oxford.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Main progress on Design & Safety Review: EmCAL -- Received the revised TRD write up from Ludovico Design & Safety Audit sheets need to be revised to correspond.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
Project manager report paul drumm CM16 October 2006.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
Process Management  Identify and involve stakeholders  Find common vision and mission  Define roles and responsibilities  Monitor/evaluate team effectiveness.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
1 MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Integrated Design & Safety Review Presented by Wing Lau & Paul Drumm.
MICE PID size &scraping MICE CM16, RAL, Oct V. Palladino, Univ & INFN Napoli for R. Sandrstrom and others contributing to this effort Yagmur, Holger,
1 MICE Radiation Shielding MICE Phone Conference, 28 January 2004 Yury Ivanyushenkov Engineering Department, RAL.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Referencing and Plagiarism Objectives: -To learn how to reference correctly - Warning about plagiarism - Getting ready for Mid-term review - Work Experience.
1 MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
Accreditation! The responsive curriculum game is made available through JISC under the terms of the Creative Commons BY-NC-SA Attribution-NonCommercial-ShareAlike.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
1 MICE Schedule Review no 1 Aims of review and description of review charge Motivation and external drivers Aims of the review A few of the problems Description.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
Progress on Hydrogen R&D System Yury Ivanyushenkov on behalf of Elwyn Baynham, Tom Bradshaw, Mike Courthold Matthew Hills, Tony Jones MICE Collaboration.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
1 MICE UK meeting at RAL 05 May 2005 Integrated Design & Safety Review Presented by.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
Paul drumm, mutac jan Status of Muon Beamline design work Kevin Tilley, RAL, 9th Feb Including Beamline Materials in new revision Reference ('True')
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
BSBWOR301 Organise personal work priorities and development
Status DEX Publication Project
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
MICE PM Report Progress with the Infrastructure A few problems
Models in Engineering Action Plan Name.
Assessment Needs Analysis
Presentation transcript:

Design & Safety Review Work Group meeting 10 March 2005 Progress update Wing Lau, Oxford

Progress to date:- Beamline & Targets: Initial design audit completed, some details not available and needs to be re-worked to bring it to an auditable standard; Initial safety audit completed, but needs to be re-worked to bring it to an auditable standard; Fibre tracker: Initial design audit done two weeks ago. A revision was made at yesterday’s meeting with Imperial College, The revised version will be available at the beginning of next week.

Others on the pipeline: The Infrastructures – engineering This awaits Yury’s availability PIDs Had a meeting with most of the PID physicists, the following conclusion was reached Magnetic shielding and Cherenkov 2 Design audit on these are almost ready to be carried out. I will arrange with Ghislain to meet up and do this face to face; TOF0,1 &2 Design not quite ready for this yet Cherenkov 1 Design not ready for this yet Calorimeter Design not ready for this yet

Others on the pipeline: PIDs – cont. Diffuser Further update needed to see if this could be done shortly Tracker Solenoid Project wise this needs to be sorted out as to who does what and who pays for the supply etc. Until that is done, no audit can be contemplated R & D work Absorber R & D Shigeru to advise the time to do this audit. Hydrogen R & D Tom & Elwyn to advise when this can be arranged

The management of the audit information My plan is to put a hyperlink on each of the referenced boxes. The TRD will bookmarks on each of the referred sections. It is for this reason that the TRD may need to be revised during the course of this audit process to bring all the relevant design and safety information under one roof! As for our audit preparation, Paul Drumm has agreed to use Technical Memo, rather than MICE NOTES, to append info that is not currently in the TRD. It works like an appendix to a report. The technical memo is a controlled document and gets updated as and when required. MICE note doesn’t and is therefore difficult to QC and update. The technical memo may refer to the MICE NOTES for convenience.

Time scale Recognising that it will take each work package at least 2 to 3 rework (experience gained so far indicates this need) to bring the audit to a standard that we can review it internally by the group before the external review, we need to work out a schedule so that the group can conduct the internal audit in a timely and organised manner. A quick look at the task:- No. of design audits in Phase 1: 11 No. of Safety audits in Phase 1: 11 Total 22 audit forms to complete: Assuming each takes an average 2.5 re- work, there will be approximately 55 work cycles to get the right information on the audit forms. Assuming it takes an average 2.5 days for each work cycle, it will take a total of approx. 140 days just to get all the relevant boxes fill in correctly – a solid 7 months work! That is before we can audit them internally! We must there have an agreed schedule for all these work so that we don’t get ourselves in a mess!

We should aim to come up with an acceptable schedule for this audit exercise before the next meeting